Title Page
-
-
CF-UG-Audit Version 1 Revision 1 Dated 05/07/2022
-
Conducted on
-
Audit carried out by
-
Location
-
Build Town Ref
-
PN #
-
Chamber/Pole Reference
-
Engineer Name(s)
-
UG Cabling Guide
-
Do operatives have relevant accreditations?
-
Are any UG cables/Subduct properly restrained? (A frames if necessary, metalwork preferrable)
-
Have labels been placed on each cable with correct information?
-
Are all labels placed in the middle of the cable length (not near the duct mouth) so they can be easily read?
-
Are all cables within their bend radius limit?
-
Have all cables been restrained at a reasonable height compared to the duct mouth they enter/exit from?
-
Have duct mouths been kept clear with the addition of our equipment?
-
Has our equipment been routed without being entangled in existing cables?
-
Has any rope been tied off to metalwork or pit architecture?