Information
-
Client site
-
Name of auditee.
-
Add location
-
Monitor.
-
Designation
-
Office an control number.
-
Conducted on
-
Prepared by
Surveys / Inspection undertaken
-
Surveys / Inspection undertaken.
Note: Please document previous codes monitored at last years Activity on line one below. Current year should reflect alternative codes to previous year.
Appropriate evidence must be collected and included within or annexed to this report!
Note the person carrying out the activity monitor shall hold the relevant experience in the area being audited. -
Year of audit
- 2010
- 2011
- 2012
- 2013
- 2014
- 2015
- No Previous data new starter
-
Field of activity
- 1A (PD5500 or national requirements)
- 1Bii (ASME)
- 1Bi (ASME Code NCS Nuclear)
- 1C (NBIC)
- 1D (PED)
- 1E (IBR)
- 1f (MHLW)
- 1g (MOM)
- 1h (DOSH)
- 1i (TSSA Canada)
- 1j (Work Cover South Africa)
- 1k (Work Cover AUS)
- 2a (US DOT)
- 2b ( Transportable Gas cylinders)
- 3a (Tanks Fabricated)
- 3b (Pipework Fabricated)
- 3c (Structal Fabricated)
- 4a (Forgings)
- 4b (Castings)
- 4c (Steel Plate)
- 4d (Pipes)
- 4e (Tubes)
- 4f (Fasteners)
- 4g (Ropes)
- 5a (LRCCS)
- 5b (EN12079)
- 5c (Other Containers)
- 6a (Internal Combustion engines)
- 6b (Turbines)
- 6c (Compressors)
- 6d (Gearing)
- 6e (Agitators)
- 6f (Pumps)
- 7a (Electric Motors)
- 7b (Electrical Alternators)
- 7c (Transformers)
- 7d (Switchgear)
- 7e (Spare)
- 7f (Instrumentation)
- 7g (Boards, Panels & desks)
- 7h (Bushings)
- 7i (Electric cable)
- 7j (Power Transmission-Conductors)
- 7k (Power Transmission -Insulators)
- 7l (Power Transmission-Towers)
- 8a (Cast Iron, Bronze & Brass valves)
- 8b (Cast Steel Forged Valves)
- 8c (Fabricated Valves)
- 9a (Cranes, Lifts and Hoists)
- 9b (Loading arms)
- 10a (KEPIC Korea)
- 10b (Water Plants Spain)
- 10c (GIRS UK)
- 10d (NERS UK)
- 10e (ISIS UK)
- 10f (Refrigeration NL)
- 10g (Pressure Systems NL)
- 10h (Storage Tanks NL)
- 10i (Pressure Systems Propane, Butane NL)
- 10j (ISI Intervals NL)
- 10k (ISI Delays NL)
- 10l (ISI Pressure Equipment NL)
- 10m (Surveillance Prior to service NL)
- 10n (LPG NL)
- 10o (Propane, Butane Installations NL)
- 10q Sizewell B Independant Inspection UK)
- 10r (Quality System certification scheme UK)
- 10s (Pipeline Valves IT)
- 10t (Sellafield re-processing UK)
- 10u (WIRS)
- 10v (MAMRS)
- 11a (Welder Quals-Pressure)
- 11b (Welder Quals-Structual)
- 11c (Welding PQ-Pressure Equipment)
- 11d (Welding-Structual)
- 11e (Client Training PED)
- 11f (Client Training ASME VIII Div 1)
- 11g (Client Training ASME IX)
- 11h (Client Training ASME 1)
- 11i (Client Training ASME III
-
Additional Items Reviewed I.E. Notebooks etc...
- Notebook
- Client documents
- Specifications
- Commercial Information
-
Product Code
- Pressure Equipment
- Gas Cylinders
- Fabribcations
- Material
- Containers
- Mechanical Equipment
- Electrical Equipment
- Valves
- Lifting Equipment
- Local Products
- Welding Services
- ISIS
- EC Directives
-
Previous findings:<br>(The previous activity monitor has being reviewed and all outstanding actions closed out.)<br>If NO please identify below:
-
MS02-04-04 app1 R9
(Amended for local UK energy purposes 10-2014
Commercial
Commercial awareness (RFS / contracts)/client interaction
-
Is the Surveyor fully aware of the Clients requirements, including latest applicable amendments, requirements for statutory surveys and the requirements of national authorities? (All as applicable)
-
Is the Surveyor/inspector fully conversant with all the specified requirements for work i.e. Technical notices, guidance documents and contractual requirements etc.
-
Is there a request for services in place?
-
Has a control number been raised with all the correct parameters?
-
Is the individual authorised for work list codes
-
Does the Surveyor have necessary PPE?
-
Is the individuals relationship with the client satisfactory
-
If no identify actions below
-
Is the individuals conduct on the clients premises satisfactory?
-
If no identify actions below
-
MS02-04-04 app1 R9
(Amended for local UK energy purposes 10-2014
Technical
Technical awareness
-
Are welding procedures, specifications together with their supporting procedure qualification records verified by the Surveyor/inspector? Are qualified welder a being used?
-
Is the storage and distribution of welding consumables satisfactorily monitored?
-
Is the individuals CV up to date?
-
Are the individuals authorisations up to date?
-
Are any measuring instruments used by the manufacturer/repairer been reviewed by the Surveyor/inspector
-
Has this been verified?
-
If no what corrective action has been taken?
-
Has this been recorded (e.g on a pro forma, job control record, visit report, certificate or any other document) and placed on file.
-
MS02-04-04 app1 R9
(Amended for local UK energy purposes 10-2014
Sample Survey
Sample inspections by the Surveyor witnessed by me were :
-
Found to be in order
-
Found not to be in order - recommendation made and suitable corrective actions shown in findings section.
-
No recommendations made
Documentation.
-
Are the reporting documents issued satisfactory, e.g. Checklists, progress reports, job control records etc.
-
Is the individuals performance and competency considered satisfactory for the work undertaken.
-
Is there any evidence that previous training has benefited the individuals performance? If yes give evidence or examples.
-
Is the Surveyor aware of his job description and is it applicable to his role today?
Record below all references through the process of the monitoring activity. I.e. Equipment identification, serial numbers, document references, materials, codes/specifications used etc
-
Add any further media here
-
MS02-04-04 app1 R9
(Amended for local UK energy purposes 10-2014
Qualifications and authorisations
I hereby confirm I have conducted a review of the following requirements, notations made where applicable and the relevant documents endorsed and issued along with this report.
-
Group OSH Checklist (Reviewed and Accepted)
-
Group OSH Checklist (Reviewed and updated on H Drive)
-
Surveyors CV (Reviewed and Accepted)
-
Surveyors CV (Reviewed and updated on H Drive)
-
Authorisations local & EC Directives as relevant (Reviewed and Accepted)
-
Authorisations local & EC Directives as relevant (Reviewed and updated on H Drive)
-
Is the Surveyors NDE qualification up to date?
-
When does the Surveyors NDE qualification expire?
Monitors/ line managers comments on review
-
Add any further media
-
MS02-04-04 app1 R9
(Amended for local UK energy purposes 10-2014
Technical review
Findings identified which require corrective action.
-
Control number
-
Field series of activity.
- Pressure Equipment
- Gas Cylinders
- Fabribcations
- Material
- Containers
- Mechanical Equipment
- Electrical Equipment
- Valves
- Lifting Equipment
- Local Products
- Welding Services
- ISIS
- EC Directives
-
Findings
-
Number of findings
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Confirmation
-
Control number
-
Field series of activity.
- Pressure Equipment
- Gas Cylinders
- Fabribcations
- Material
- Containers
- Mechanical Equipment
- Electrical Equipment
- Valves
- Lifting Equipment
- Local Products
- Welding Services
- ISIS
- EC Directives
-
Findings
-
Number of findings
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Confirmation
-
Control number
-
Field series of activity.
- Pressure Equipment
- Gas Cylinders
- Fabribcations
- Material
- Containers
- Mechanical Equipment
- Electrical Equipment
- Valves
- Lifting Equipment
- Local Products
- Welding Services
- ISIS
- EC Directives
-
Findings
-
Number of findings
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
-
Confirmation
-
MS02-04-04 app1 R9
(Amended for local UK energy purposes 10-2014
Conclusion
Conclusion and findings log
-
Findings identified which need action
-
Line manger - evaluate findings and recommend close out date
-
Findings identified which need action
-
Line manger - evaluate findings and recommend close out date
-
Findings identified which need action
-
Line manger - evaluate findings and recommend close out date
-
Findings identified which need action
-
Line manger - evaluate findings and recommend close out date
-
Findings identified which need action
-
Line manger - evaluate findings and recommend close out date
-
Findings identified which need action
-
Line manger - evaluate findings and recommend close out date
-
Findings identified which need action
-
Line manger - evaluate findings and recommend close out date
-
Findings identified which need action
-
Line manger - evaluate findings and recommend close out date
-
Findings identified which need action
-
Line manger - evaluate findings and recommend close out date
-
Findings identified which need action
-
Line manger - evaluate findings and recommend close out date
-
MS02-04-04 app1 R9
(Amended for local UK energy purposes 10-2014
Signatures
-
Signed as accepted Surveyor /inspector
-
Monitor
-
Signed as accepted line manager.
-
Acceptance can be made by confirmation email which will be addended to report.
-
MS02-04-04 app1 R9
(Amended for local UK energy purposes 10-2014