Information

  • Site conducted

  • JOB CARD

  • Customer Name:

  • Site Address:
  • Work Ordered:

  • Conducted on

RISK ASSESSMENT/JSEA

  • ELECTRICAL SWMS: Tick the hazards that apply to the job, and acknowledge and refer to appropriate SWMS & Procedures to implement as effective controls.

    electrical.gif
  • Live Testing / Testing for De-energized

  • Refer to Safe Work Procedures and Documentation:

  • Working Near Energized Electrical Equipment

  • Refer to SWMS and Documentation:

  • Working on Energized Electrical Equipment (i.e. WORKING LIVE)

  • Is there a reason for Working Live as listed in NECA Red Book Section 11.0 ? IF NO, STOP WORK IMEDIATELY!

  • Refer to SWMS and Documentation:

  • Working Near Overhead Powerlines

  • Refer to SWMS:

  • HIGH RISK CONSTRUCTION WORK SWMS: Tick the hazards that apply to the job, and acknowledge and refer to appropriate SWMS & Procedures to implement as effective controls.

    high risk.jpg
  • HR-ID 1 Working at Heights > 2m

  • Refer to SWMS and Documentation:

  • HD-ID 6 Confined Spaces

  • Refer to SWMS and Documentation:

  • HR-ID 15 Mobile Powered Plant (e.g. forklifts etc)

  • Refer to SWMS:

  • HR-ID 4 Asbestos

  • Refer to SWMS and Documentation:

  • HR-ID 14 Working Near a Traffic Corridor (other than pedestrians)

  • Refer to SWMS:

  • HR-ID 7 Excavations or Trenching > 1.5m Deep

  • Refer to SWMS and Documentation:

  • WORKPLACE HEALTH AND SAFETY PROCEEDURES: Tick the hazards that apply to the job, and acknowledge and refer to appropriate procedures to safely carry out task.

    safe.jpg
  • Working on Property Poles

  • Refer to SWMS:

  • Conductive Foil Insulation Installed in Ceiling

  • STOP WORK! CONTACT MANAGEMENT FOR FURTHER INSTRUCTION.

    stop.jpg
  • Working With Power Tools

  • Refer to Documentation:

  • Ladders

  • Refer To Documentation:

  • Scaffolding

  • Refer to Documentation:

  • UV Radiation

  • Refer to Documentation:

SITE SPECIFIC RISK ASSESSMENT

  • Are there any additional Hazards/Risks that have not yet been identified and effective controls implemented?

  • CONTACT MANAGEMENT FOR RISK ASSESSMENT OF ANY ADDITIONAL SITE-SPECIFIC RISKS

  • Additional Hazard/Risk:

  • Likelihood of Risk Eventuating:

  • Consequence of Risk Eventuating:

  • Controls to be implemented:

  • Residual Likelihood of Risk

  • Residual Consequence of Risk:

  • The level of risk is to be calculated in conjunction with the RISK MATRIX table found in any of the existing Safe Work Method Statements. The level of risk will determine if work can proceed or if further SWMS and controls are required to be put in place by senior management.

  • Are there any additional Hazards/Risks that have not yet been identified and effective controls implemented?

  • Additional Hazard/Risk:

  • Likelihood of Risk Eventuating:

  • Consequence of Risk Eventuating:

  • Controls to be implemented:

  • Residual Likelihood of Risk:

  • Residual Consequence of Risk:

  • The level of risk is to be calculated in conjunction with the RISK MATRIX table found in any of the existing Safe Work Method Statements. The level of risk will determine if work can proceed or if further SWMS and controls are required to be put in place by senior management.

  • Are there any additional Hazards/Risks that have not yet been identified and effective controls implemented?

  • Likelihood of Risk Eventuating:

  • Consequence of Risk Eventuating:

  • Controls to be implemented:

  • Residual Likelihood of Risk:

  • Residual Consequence of Risk:

  • The level of risk is to be calculated in conjunction with the RISK MATRIX table found in any of the existing Safe Work Method Statements. The level of risk will determine if work can proceed or if further SWMS and controls are required to be put in place by senior management.

Certification

  • I certify that this audit has a score of 100% and all appropriate Safe Work Method Statements, Safe Work Procedures, and other required documentation has been referred to, and appropriate risk control measures implemented or work is to cease immediately. Appropriate Safe Work Procedures have been referred to and work will be performed in accordance with these procedures, and suitable PPE will be worn according to appropriate SWMS and SWP documentation. I certify that any additional identified site specific hazards have control measures implemented as per risk assessment.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.