Title Page
-
Site conducted
-
Document No: HSQE-FOR
-
Conducted on
-
Prepared by
-
Location
Yard
-
Is there sufficient lighting in the yard
-
Are materials / equipment stored correctly in the yard areas
-
Is the yard kept in a tidy condition by staff in order to reduce any potential risks/ hazards
-
Is the yard surface fit for purpose
-
Are HGV vehicles guided in/out of premises by a banks-man
Workshop
-
Is there an information board for staff notifications
-
Are electrical items PAT tested and in date
-
Is there an electrical service or test report available
-
Are the correct fire extinguishers present and in test date
-
Is there sufficient wash facilities provided
-
Is there sufficient Lighting in the workshop
-
Is there adequate ventilation
-
First aider information signage established
-
Are first aid kits present and in good order
Housekeeping Workshop
-
Fire exits clear of obstructions
-
Walkways clean and free of slip/trip hazards
-
Materials / equipment stored in correct location
-
Materials / equipment storage organised and secure
Security
-
Has a first point of call been established if there is a gained entry
-
Are the premises alarmed or have CCTV
-
Are vehicles stored in the yard after working hours
-
Is the workshop secured after working hours
-
Is the yard locked and secured after working hours
Fire and fire extinguishers
-
Fire Evacuation plan displayed and current
-
Is there a fire assembly point established
-
Extinguishers in place
-
Correct extinguisher type
-
Extinguisher tag current
Chemicals
-
Are chemicals stored correctly
-
Are flammables stored in a fire cabinet or alike
-
Are spill kits located with/near fuels or chemicals
-
Are COSHH and MSDS available and kept on site
Environmental
-
Is waste segregated and disposed of correctly
-
Is noise kept to a minimum during working hours
undefined
Racking Inspection Checklist
-
All racking within the factory is undamaged and free from dents, chips and damage. (If no, capture below)
-
All racking has the correct loading signs clearly visible at the end of each aisle?
-
All pallet racking has pins inserted throughout to help support it?
-
All racking is adequately secured to the floor
-
All warehouse staff are competent in the stacking of the shelves and understand the loads etc. to use
-
All walkways are kept clear so racking can be safely accessed
-
Checked and key members have no concerns about the racking at the moment
-
Specify the location of the damaged rack by tapping ADD AREA.
DAMAGE
-
Aisle
-
Bay Number
-
What component of the racking system is damaged?
- Frame
- Beam
- Accessory
-
Which part/s of the frame is/are damaged?
- Front uprights
- Front base plate
- Front shims
- Rear uprights
- Rear base plate
- Rear shims
- Bracing
-
Take photos of the damage and identify risk level
- Green (minor damage)
- Amber risk (significant damage)
- Red risk (critical damage)
-
Which part/s of the beam is/are damaged?
- Front beam
- Front clips
- Rear beam
- Rear clips
-
Take photos of the damage and identify risk level
- Green (minor damage)
- Amber risk (significant damage)
- Red risk (critical damage)
-
Which part/s of the accessory is/are damaged?
- Shrink Wrap
- Upright Guards
- Row Spacer
- SWL Signage
-
Take photos of the damage and identify risk level
- Green (minor damage)
- Amber risk (significant damage)
- Red risk (critical damage)
Completion
-
Additional Recommendation
-
All stocks located in the racking systems are checked for any damage.
Sign off
-
Name & Signature of Inspector