Information
-
ABFFP address/location:
-
ABFFP ID:
-
Conducted on
-
Technician Rectified ABFFP:
-
Take a photo of the xFFP while it is in the pit/manhole in it's set position with the ABFFP ID visible in the photo and showing condition of the pit/manhole.
-
What is the condition of the xFFP upon opening the enclosure?
-
Take a photo as evidence showing the condition of the xFFP upon opening the enclosure proving it is WET or DRY:
-
Upon completion of the MINEX, take a photo from the front of the ABFFP showing work done:
-
Upon completion of the MINEX, take a photo from the back of the ABFFP showing work done:
-
Has the O-ring been Replaced?
-
Is the Clamp Bolt Hand-tight?
-
is the Flash 9 Bolts installed and tight?
-
Comments: