Information
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Personnel
Preliminary Checks
-
Is the battery above 12.5V?
-
Is the solar panel facing North?
-
Is the unit level?
-
Are all sensor connections intact and secure?
-
Is the battery secure?
-
Are all internal connections, glands and screws tight and plugged in correctly?
-
For applicable units are you in Next G range?
-
For applicable units Is an extension required?
-
For applicable units Is the UHF channel set for the correct base?
Communications
-
Does the board indicate it has read all applicable sensors?
-
Does the board indicate successful communications?
-
Have you tipped the rain gauge in order to test it?
-
Have you marked the site on Agworld?
-
Have you recorded the unit number with the corresponding field number?
-
Is the location and device setup on the website?
-
Is the location turned on on the website?
-
Have you checked the raw data or website to ensure the unit is fully operational?