Title Page
-
Site
-
Work Order Number
-
WPCG Inducted
-
Conducted on
-
Prepared by
-
Location
Monthly Maintenance
Garden Maintenance
-
Garden Maintenance including mowing lawns, cutting edges, pulling weeds and applying poison
Rubbish Removal
-
Rubbish on site disposed of in rubbish bins
-
Has the rubbish from LPG cages been removed
Cleaning
-
Have all windows been cleaned (where accessible)
-
Front door mat been cleaned
-
Has spill kit bin been wiped down
-
Have the fuel pumps been wiped down
Building Maintenance
-
Bollards have been inspected and touched up as required
6 Monthly Maintenance
-
Exterior & Site Fascia
-
Wet Wash of Pylon Sign & LED
-
Cleaning of Pumps & Decals incl. Condition Check
-
Cleaning and pesticide of External 3D lettering, report any damages
-
Cleaning of ACM paneling (incl. cobwebs, wetwash, marks)
-
Cleaning of height marker signs
-
Wet wash of shop fascia
-
Pressure wash of forecourt and pump bays
Canopy Soffit
-
Wet Wash of Canopy Soffit
-
Canopy Condition report
-
Lighting condition report
Untitled page
-
Was the work completed by Prats in a safe manner without causing any damage to the property
-
If damage has occurred please specify details
Sign off
-
Signature of job completion from client
-
Signature of job completion from Prats