Title Page
-
Conducted on
-
Prepared by
-
Location
Pre-Constuction Phase
-
1. Received Niblock Site Folder (Blue Folder)?
-
2. Have you received all H&S provisions for the site? E.g. First Aid Kit, Fire Extinguishers etc?
-
3. Received H&S statutory signage and affixed to pinboard or A-Frame board?
-
4. Received schedule of works from the Client or Niblock Contract Management?
-
5. Made a note of gas meter cupboard and electric meter cupboard locations and received relevant cards?
-
6. Received an Asbestos Survey (R&D)?
-
7. Received a dead test EICR?
-
8. Received drawings and calculations (I.e. Structural drawings, calculations., Kitchen proposed layout)
-
9. Received CP12 Certificates
-
10. Received relevant manuals e.g. Boiler manuals in order to remedy if required
-
11. Received programme of works
-
12. Undertaken pre-condition survey with photos and saved to server or distributed to Niblock colleagues?
-
13. Have Sub-Contractors been confirmed to undertake these works?
-
14. Have you received the Sub-Contractors RAMS, COSHH Assessments and Training Certification (Alternatively if they are a regularly used Sub-Contractor have you contacted Liam in relation to confirming training certification?)
-
15. Have you contacted neighbouring residents apologising for works in advance?
-
16. Have you installed chapter 8’s or heras fencing if and where needed to prevent unauthorised access into the site?
-
17. Have you received access equipment into the property e.g. Fob, Key ?
-
Any Further Comments?
Construction Phase
-
1. Have you inducted the site operatives into the works?
-
2. Have you ensured that Site Operatives are signing in and out?
-
3. Have you undertaken a Toolbox Talk in relation to the works?
-
4. Have you confirmed when Sub-Contractors materials shall be issued to Site?
-
5. Are you completing the relevant H&S documentation in relation to the Site e.g. Daily Hazard Board Updates, Site Diary, Fire extinguisher inspection checklist?
-
6. Are you working to programme, if not what are the delays?
-
7. What mitigating control measures have you implemented to prevent further delays?
-
8. Are all relevant parties aware of the delays?
-
9. Are you filing all manuals received upon completion of work elements?
-
10. Have you undertaken your end of day checks?
-
11. Have you resolved all snags noted by the Client?
-
Any further comments?
Post Construction
-
1. Have you chased Sub-contractors in relation to providing manuals/information for the works they have completed?
-
2. Have you undertaken a snag audit/inspection?
-
3. Can you confirm all snags identified by both the Client and yourself have now been addressed accordingly?
-
4. Is the site clear from all site equipment?
-
5. Have you returned your completed Niblock Site Folder (Blue Folder)?
-
Any further comments?