  • Site conducted

Maintenance Team Safety Inspection

  • Work Order Number

  • Conducted on

  • Location
  • Personnel

  • Prepared by

  • Add signature

  • Are changes required to Risk Assessments?

  • Take Photograph of the area

Documentation

  • Do all operatives have access to the relevant Risk Assessments and COSHH Assessments?

  • Are the Health, Safety and Environmental risks of this work covered by the Estates Dynamic Risk Assessment or other specific Risk Assessments and are all the control measures in place?

  • Is the task considerably different to what was expected by the Work Order?

  • Are additional Controls required and are they in place?

  • STOP THE TASK AND RE-ASSESS

People

  • Have all the operatives been trained in the equipment/plant they are using?

  • Do the operatives have the right plant/equipment for the task to be carried out?

  • Is mobile electrical equipment being used?

  • Is the equipment 110 Volt?

  • Does the equipment have an in date PAT label?

  • If the operatives are working in the vicinity of underground/overhead services, are necessary Control Measures in place?

Access Equipment

  • Does the work involve access equipment

STEPLADDERS

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Does the task have to be completed at Height?

  • Are steps suitable for the task?

  • Do the steps have valid in date Scafftag?

  • Has the operator had relevant training in correct use?

  • Do operatives have ready access to the relavent Risk Assessment or Operating Procedures for using Step Ladders

  • Are SWPs being followed?

  • Are the steps Class 1 - industrial or Class 2 - Trade?

  • Have the steps been inspected before use?

  • Ensure non-conducting steps are used near electrical plant

  • Are the steps on a firm base?

  • Is the operator aware never to stand on the top step of stepladders?

  • When required does the operative know to obtain a second man to foot or use anti slip device?

MOBILE LADDERS

  • INSPECTING ITEMES RELATED TO THIS SECTION?

  • Does the task have to be completed at Height?

  • Is a ladder the most suitable equipment to use for the task?

  • Does the ladder have a valid in date Scafftag?

  • Has the operator had relevant training in correct use?

  • Do operatives have ready access to the relavent Risk Assessment or Operating Procedures for using Ladders

  • Are Risk Assessments and Operating Procedures being followed?

  • Is the ladder Class 1 - industrial or Class 2 - Trade?

  • Have the steps been inspected before use?

  • Ensure non-conducting steps are used near electrical plant

  • Are the steps on a firm base?

  • Can the operative maintain 3 points of contact at all times?<br>NOTE. Ladders should only be used as access equipment not as a Working Platform

  • Are items carried limited to 10kgs?<br><br>NOTE: TOOLS MUST ONLY BE CARRIED IN TOOL BELTS

  • Is the use of ladders limited to tasks of less than 30 minutes?

  • Has the area below been cordoned off or guarded/protected to prevent others knocking the ladder or being struck by falling items?

  • Is the ladder set at the correct angle - 4 feet up for every 1 foot out?

  • Is the ladder secured at the top with rope or use of ladder stays?<br><br>Where this is not possible, a second man is to foot or use anti slip device!

  • Does the ladder extend 5 rungs past the landing, if used to step off?

  • Is the operator working safely ie avoiding over-reaching?

  • Is the operator avoiding Lone Working?

  • Other (please specify)

FIXED LADDERS

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Has operative carried out visual check on condition?

  • Are vertical ladders hooped above 2 metres?

  • Has operative received relevant training in correct use?

  • Do operatives have ready access to the relavent Risk Assessment or Operating Procedures for using Fixed Ladders?

  • Are operatives following Risk Assessments or Operating Procedures?

  • Is all equipment winched up?

  • Are site conditions deemed safe?

  • Other (please specify)

MOBILE TOWER SCAFFOLD

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Has the scaffold been erected by a competent trained person? - check In date PASMA

  • Do operatives have ready access to the relavent Risk Assessment or Operating Procedures for using Mobile Scaffold?

  • Are relavent Risk Assessment or Operating Procedures being followed?

  • Has the tower been erected in accordance with the manufacturers patent handbook?

  • Has the tower been inspected after erection? Is there a valid in-date signature?

  • Is tower clear of all services at height (at least 5m)?

  • Is tower only used when weather is fine?

  • Are outriggers fully extended and brakes applied?

  • Other (please specify)

SCAFFOLDS

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Competent Person supervised Erection?

  • Tagged and inspected by Competent Person? Ensure records show that it has been inspected within 7 working days?

  • Do operatives have ready access to the relavent Risk Assessment or Operating Procedures for working on Scaffolding?

  • Are relavent Risk Assessment or Operating Procedures for working on Scaffolding being followed?

  • Base (sills/plates/jacks/casters - secured/level)

  • Scaffolding not accessed in high winds

  • Platforms (fully planked, secure/proper overhang, condition)

  • Access (ladder - attached/integrated in frame)

  • Secured to Structure/Outriggers in place

  • Guardrails, Toeboards, Personal Fall Prot.

  • Other (please specify)

MOBILE ELEVATED WORKING PLATFORM

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Are operatives trained to operate MEWP - CITB/IPAF

  • Is MEWP within its LOLER compliance date?

  • Does the operative have access to the relavent Risk Assessment or Operating Procedures for working on MEWPs

  • Are relavent Risk Assessment or Operating Procedures for working on being followed?

  • Is machine stable?

  • Are outriggers or stabilisers used where necessary?

  • Are users wearing a full safety harness clipped the the machine?

  • Is load within the machines safe working load?

  • Does work stop if the wind speed or weather conditions deteriorate to an unacceptable level?

  • Are there at least 2 operatives at all time?

  • Are barriers provided around machine to prevent vehicle collisions?

  • IS THERE A RESCUE PLAN IN THE EVENT THAT AN OPERATIVE FALLS FROM THE CAGE?

ROOF WORK

  • Does the work involve Roof Work?

Flat Roof Guarded

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • Confirm that the Roof is load bearing and edge protection has been confirmed as safe?

  • Are the weather conditions suitable ie no high winds or other inclement weather which could jeopardise safe practice?

  • Is there sufficient light to start or continue with the job?

  • No loose items, loose items must be winched up if using ladders to gain access?

  • Is there a risk of items falling to a lower level?

  • Hard Hats to be worn?

  • Appropriate Signage in Place?

FLAT ROOF UNGUARDED

  • INSPECTING ITEMS RELATED TO THIS SECTION?

  • If a MEWP can be used. Use it Instead. IF A MEWP CAN NOT BE USED THEN THE MAN SAFE SYSTEM MUST BE USED.

  • Can the work be carried out from underneath using a MEWP without the need to stand on the roof?

  • Is there a Man Safe system?

  • Does the Man Safe system have an in date inspection label attached?

  • Is the operative trained on the Man Safe system?

  • Are the harness and lanyards where applicable checked before use and in date with insurance inspection?

  • Does the lanyard stop the operative reaching the edge of the roof?

  • Confirm with Building Surveyor/Supervisor that Roof is load bearing and edge protection has been confirmed as safe?

  • Are the weather conditions suitable ie no high winds or other inclement weather which could jeopardise the safety personnel?

  • Is there sufficient light to start or continue with the job?

  • No loose items, loose items must be winched up not carried?

  • Is there a risk of items falling to a lower level?

  • Affected area to be cordoned off?

  • Hard Hats to be Worn?

  • Appropriate Signage in Place?

  • IF ANY ITEMS ARE SHOWN AS RED, STOP WORK AND REASSESS TASK!

FLAT ROOF UNGUARDED - SHORT TIME PERIOD ONLY - SHORT TIME IS IDENTIFIED AS MINUTES< NOT HOURS. NO WORK IS TO AKE PLACE WITHIN 2 METRES OF THE EDGE

  • Inspecting Items Related to this section?

  • Confirm with Building Surveyor/Supervisor that Roof is Load bearing and edge protection has been confirmed as safe?

  • Are the weather conditions suitable ie no high winds or other inclement weather which could jeopardise the safety of personnel?

  • Is there sufficient light to start or continue with job?

  • Is there a risk of items falling to a lower level?

  • Affected area to be cordoned off?

  • Hard Hats to be Worn?

  • Appropriate Signage in Place?

Demarcation are for short work. If work is to be carried out, no closer that 2m from edge

  • Is area Demarcated at least 2 metres from edge, demarcation area to be indicated by a continuous physical barrier?

  • Is work limited to this area ie from which nobody can fall?

  • Is the task subject to close supervision making sure nobody strays outside?

ENVIRONMENTAL CONSIDERATIONS

  • Are COSHH products being used?

  • Do the operatives have access to COSHH assessment?

  • Are Operatives wearing protective equipment iaw COSHH Assessment?

  • Are weather and ground conditions increasing any risk on site?

SUMMARY

  • Do you have any other health, safety or environmental concerns about the work you have been asked to carry out?

  • Are any of the answers RED?

  • What are the additional risks you have identified?

  • undefined

  • What measures are you planning on taking to control these risks?

  • undefined

  • How are you planning to do the work?

  • undefined

  • Have you resolved the issue(s) identified from this audit? Have you got everything you need, (the right people, right work equipment and materials) to do the job)

  • Brief all the team (who, what, when and how). List all the people below and continue working safely and effectively.

  • IF CHANGES AE REQUIRED TO RISK ASSESSMENTS OR OPERATING PROCEDURES, COMPLETE SECTION ON FRONT PAGE BEFORE FORWARDING THE AUDIT

  • Enter Auditor's Name and Signature.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.