Information
-
Audit Title
-
Campus
-
Grounds Precinct
-
Conducted on
-
Prepared by
-
All persons and contractors present
AUDIT AREA - General
-
Has the contract standard been met for the following:<br><br>Ensure that appropriate access to all fire trails is maintained at all times.
AUDIT AREA - Grassed Areas (including sporting areas and playing pitches)
-
Has the contract standard been met for the following:<br><br>Ensure that at all times: <br>- appropriate soil treatment is undertaken to maintain healthy growth<br>- newly grassed areas are uniform in appearance with no bare patches <br>- edges are kept trimmed<br>- weed infestation is eliminated <br>- grass levels are maintained to a uniform length of between: <br> -16mm - 20mm for Ray Watt Oval
-
Has the contract standard been met for the following:<br><br>Ensure that at all times: <br>- appropriate soil treatment is undertaken to maintain healthy growth<br>- newly grassed areas are uniform in appearance with no bare patches <br>- edges are kept trimmed<br>- weed infestation is eliminated <br>- grass levels are maintained to a uniform length
-
Has the contract standard been met for the following:<br><br>Ensure that at all times: <br>- appropriate soil treatment is undertaken to maintain healthy growth<br>- newly grassed areas are uniform in appearance with no bare patches <br>- edges are kept trimmed<br>- weed infestation is eliminated <br>- grass levels are maintained to a uniform length of between: <br> - 16mm – 25mm for Oval 1
-
Has the contract standard been met for the following:<br><br>Ensure that at all times: <br>- appropriate soil treatment is undertaken to maintain healthy growth<br>- newly grassed areas are uniform in appearance with no bare patches <br>- edges are kept trimmed<br>- weed infestation is eliminated <br>- grass levels are maintained to a uniform length of between: <br> - 20mm – 35mm for Ovals 2, 3, 4, 5 and PE.
AUDIT AREA - Grass Slashings
-
Has the contract standard been met for the following:<br><br>At all times: <br>- Area 1 identified in the photograph below (Ourimbah Campus) is to be maintained to a uniform length of between 50 and 75mm
-
Has the contract standard been met for the following:<br><br>At all times: <br><br>- Area 2 identified in the photograph below (Ourimbah Campus) is to be maintained to a uniform length of between 75 and 100 mm - <br>
-
Has the contract standard been met for the following:<br><br>At all times: <br><br>- Area 3 identified in the photograph below (Ourimbah Campus) is to be maintained to a uniform length of between 100 and 150 mm. <br><br>- Area 3 as identified at Tamworth Education Centre must be maintained to a uniform length between 100 and 150 mm.
AUDIT AREA - Grassed Sporting and Playing Pitches
-
Has the contract standard been met for the following:<br><br>All grassed sporting and playing pitches must at all times be: <br>- marked with lines suitable for their intended use which includes: <br> - 2 soccer fields (including 1 half field 10m x 10m grids) and cricket pitches appropriately prepared and marked at Ray Watt Oval<br> - cricket pitches appropriately prepared and marked and 1 rugby union, 1 rugby league, 1 touch football and 1 soccer field at<br> Oval 1.<br> - 1 rugby union and 1 soccer field at Oval 2 <br> - 1 rugby league (including 10m x 10m grids), 1 boundary and 1 baseball at Oval 3 <br><br>- fitted out with all relevant sporting equipment including goal posts, nets, etc
-
Has the contract standard been met for the following:<br><br>- fitted out with all relevant sporting equipment including goal posts, nets, etc
AUDIT AREA - Artificial grass / Synthetic Surfaces
-
Has the contract standard been met for the following:<br><br>All such surfaces must at all times be: <br>- free from standing water, ice or hail <br>- free from fallen leaves, moss, algae or interstitial weeds <br>- free from graffiti and vandalism <br>- marked with lines suitable for their intended use <br>- maintained in accordance with the manufacturer’s instructions and recommendations
AUDIT AREA - Flower and Garden Beds
-
Has the contract standard been met for the following:<br><br>All flower and garden beds must at all times be: <br>- free from weeds and litter <br>- free from disease and aphid infestation <br>
-
Has the contract standard been met for the following:<br><br>All flower and garden beds must at all times be: <br><br>- covered by mulch of a depth of no less than 70mm <br>- replaced as and when necessary to maintain appearance
AUDIT AREA - Trees, Shrubs and Hedges
-
Has the contract standard been met for the following:<br><br>All trees, shrubs and hedges must at all times be trimmed, pruned and cut in accordance with all relevant Principal’s Policies and Procedures and otherwise maintained so as to minimise: <br>- the risk of crime and vandalism <br>- the risk of storm and wind damage <br>- the obstruction of lines of sight, lighting and signage <br>- the risk of security systems being triggered <br>- the risk to the public <br>- litter
AUDIT AREA - External Areas
-
Has the contract standard been met for the following:<br><br>All external areas must at all times be free from litter, debris, leaves, hazards and excrement.
AUDIT AREA - Circulation Routes
-
Has the contract standard been met for the following:<br><br>All paving, paths, driveways, roads, car parks, hard standings, entrances, courtyards and paved areas must at all times be free from: <br>- standing water, ice, and hail <br>- fallen leaves, moss algae or interstitial weeds <br>- graffiti and vandalism
AUDIT AREA - External Furniture and Features
-
Has the contract standard been met for the following:<br><br>All guard rails, copings, statues or ornamental objects, seating, tables, permanent waste bins, fences, barriers and bollards, hydrants, grates and pits must at all times be: <br>- complete, safe, sound and secure <br>- free from moss, algae and interstitial weeds <br>- clean and free from graffiti and vandalism <br>- free of built-up of leaves, litter and dirt
AUDIT AREA - Boundaries
-
Has the contract standard been met for the following:<br><br>All fences, walls and gates must at all times be free from vegetation, litter and leaves.
AUDIT AREA - Gutters, Drains, Culverts, Swales and Waterways
-
Has the contract standard been met for the following:<br><br>All gutters, drains, culverts, swales and waterways must at all times be free of: <br>- litter, leaves, weeds and extraneous material<br>- blockages
AUDIT AREA - Asset ProtectionZones and Bushfire Set Backs
-
Has the contract standard been met for the following:<br><br>A continuous, vegetation-free fire break must be maintained at all times in accordance with all relevant local government and Country Fire Association requirements
Additional Comments
-
Other comments
Sign Off
-
On site representative
-
Auditor's signature