Information
-
Carters Name:
-
Delivery Order #
-
Delivery date & time
-
Builder
-
Location
General Area - delivery setup
-
Safe work method statement(s) available on site
-
Induction completed for all personnel
-
Access to site clear of materials & debris ?
-
Blue metal or better driveway available
-
Perimeter and/or siltration fencing have been unlocked or removed for delivery
-
Work area free of debris
-
Manual handling risks identified and are being managed.
-
Stair void scaffold in place.
-
Stair void handrails in place?
PPE used for task
-
Hi Vis Vest
-
Steel capped boots
-
Gloves
-
Eye protection
Job completion check
-
All plaster stored flat and on ballots.
-
Board stacked on edge has been secured correctly as per industry guidelines.<br>
-
Caution sign placed on plasterboard in clear sight?
-
Stair void protection has been re erected after delivery (or builder contacted)
-
Stair void handrails re erected after delivery (or builder contacted)
-
Noggins and studs that have been removed have been reinstalled .
-
Clear photos of plasterboard has been taken with any sundries ?
-
Photos taken of wrapped plasterboard?
-
Site Fencing re secured & locked.
-
The site (all aspects of it ) has been left safe or the office has been notified.
Additional hazards
-
What is the hazard ?
-
What can go wrong?
-
How can you control it ?
More
-
Other comments
Sign Off
-
On site representative
-
Auditor's signature