Information

  • Carters Name:

  • Delivery Order #

  • Delivery date & time

  • Builder

  • Location

General Area - delivery setup

  • Safe work method statement(s) available on site

  • Induction completed for all personnel

  • Access to site clear of materials & debris ?

  • Blue metal or better driveway available

  • Perimeter and/or siltration fencing have been unlocked or removed for delivery

  • Work area free of debris

  • Manual handling risks identified and are being managed.

  • Stair void scaffold in place.

  • Stair void handrails in place?

PPE used for task

  • Hi Vis Vest

  • Steel capped boots

  • Gloves

  • Eye protection

Job completion check

  • All plaster stored flat and on ballots.

  • Board stacked on edge has been secured correctly as per industry guidelines.<br>

  • Caution sign placed on plasterboard in clear sight?

  • Stair void protection has been re erected after delivery (or builder contacted)

  • Stair void handrails re erected after delivery (or builder contacted)

  • Noggins and studs that have been removed have been reinstalled .

  • Clear photos of plasterboard has been taken with any sundries ?

  • Photos taken of wrapped plasterboard?

  • Site Fencing re secured & locked.

  • The site (all aspects of it ) has been left safe or the office has been notified.

Additional hazards

  • What is the hazard ?

  • What can go wrong?

  • How can you control it ?

More

  • Other comments

Sign Off

  • On site representative

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.