Information
-
Date & Time
-
Project Foreman (Prepared By)
- Alan Thell
- Alex Feldhege
- Brian Hendren
- Cameron Sarnstrom
- Cory Schaffer
- Jim Shores
- Joe Warner Jr.
- Phil Currie
- Ron Warner
- Trevor Pugleasa
- Joe Durand Jr.
- Eric Baker
- Matt Baker
- Damian Jensen
- Nick Tappe
-
Personnel
-
Project Name or Location
Emergency Information
-
Location of Primary Assembly Point
-
Location of Severe Weather Shelter
-
Location of Safety Shower/Eye Wash
-
Location of First Aid Kit/Spill Kit
Sequence of Job Steps
-
Step 1: (If applicable) Get Permit Signed/Sign-In/Complete Walk Down
-
Step 2:
-
Step 3:
-
Step 4:
-
Step 5:
-
Step 6: (If Applicable) Clean up/Sign-Out/Close Out Permit/Communicate with Operator
Hazards and Mitigations (Pre-Job/During the Job)
-
Direct Hazards of the Job, Actionable Mitigation
-
Hazard
-
Applies to Job Step #
-
Potential Consequence
-
Minor Injury
-
Significant Injury
-
Fatality
-
Equipment
-
Environmental
-
Daily Site Inspection Checklist
PPE Compliance
-
Crew members are meeting the minimum PPE requirements (hard hat, toed boots, ear plugs, H2S/5 gas badge, gloves)
-
All staff is wearing a class II high-visibility vest
-
All staff is wearing safety glasses/goggles
General Safety Checklist
-
(If Applicable) All crew members completed site specifc training
-
Equipment/tools are inspected and in good condition prior to use
-
Crew members are confident/properly trained on the equipment and/or tools used for the job
Excavation Checklist
-
Appropriate drawings have been reviewed and are present onsite for identification of underground installations
-
What is being done to ensure contact with underground installations are avoided?
-
There is an open/active one call ticket
-
Barricades are in place around excavation
-
Is a Confined Space Form Required?
-
Is a Trenching and Excavation Form Required?