Title Page
-
Job Name
-
Prepared by
-
Date and Time
-
Indicate trench/excavation dimensions
-
What is the initial soil classification?
-
What protection methods will be used?
-
What is the angle of the slope?
-
What is the condition of the slope?
-
Are fissures present?
-
Are ladders present?
-
Is ground water present?
-
If ground water present what corrective actions taken?
-
Are overhead power lines present?
-
Is there public traffic present?
-
If traffic present is traffic protection in place?
-
Are there any issues affecting the trench?
-
Material is piled 2 feet back from excavation?
-
Is there potential for hazardous atmosphere?
Untitled Page