Information
-
Document No.
-
Client / Site
-
Ramp Supervisor/Delegate:
-
Leading Hand/Delegate at Aircraft:
-
Flight Number:
-
Aircraft Type
- F50
- ATR
- F100
- E190
- B737
- A320
- A330
- B777
-
STA:
-
ATA (On Blocks)
-
Gate Number
-
Aircraft Registration
-
Prepared by
NOTE: Safety and/or security related occurrences MUST be submitted on an AIRS Report/Safety Report (VAGP-SS--006)
Prior to Aircraft Loading
1. General Duties
-
1.1 Leading Hand/Delegate obtained initial LIR.
-
1.2 Team briefed on all outbound load requirements and any special loads.
-
1.3 Serviceable GSE on bay.
-
1.4 Ramp Staff on bay in a timely manner to prepare for departure.
-
1.5 Leading Hand/Delegate possesses a Departures Checklist.
-
1.6 PPE worn in accordance with SOPs.
Aircraft Loading
2. Freight
-
2.1 Barrow tarps used in inclement weather.
-
2.2 Freight delivered to designated area on time in accordance with SOPs for aircraft type.<br>
-
2.3 Freight presented on barrows/ULDs in accordance with SOPs<br>(e.g. segregation, appropriate packaging/ULD serviceable).<br>
-
2.4 General freight consignment reconciled against LIR and barrow/ULD card.
-
2.5 Special freight segregated and correctly loaded into aircraft as per LIR.<br>(e.g. orientation, positioning and restrained).<br>
-
2.6 Barrow/ULD cards correctly completed <br>(e.g. date, destination, flight number and DG card used for Dangerous Goods).<br>
-
2.7 Dangerous Goods consignments reconciled against NOTOC and LIR.
-
2.8 Dangerous Goods loaded in accordance with SOPs <br>(e.g. not damaged, orientation and correct labelling).<br>
-
2.9 Roller loading panels used in accordance with SOPs.
-
2.10 If freight was off-loaded, was it communicated to LOCO and reflected on final loadsheet<br>(Freight off-load report completed).<br>
3. General Turnaround Duties
-
3.1 Barrow tarps used in inclement weather.
-
3.2 Ramp Staff enter and exit the hold correctly in accordance with SOPs.
-
3.3 Minimum number of Ramp Staff in hold to safely load aircraft.
-
3.4 Crew baggage counted and tag details checked.
-
3.5 Waste tank servicing and potable water completed in accordance with relevant SOPs.
-
3.6 Catering operated in accordance with relevant SOPs.
-
Departure Time:
-
3.7 Refuelling operated in accordance with relevant SOPs.
-
Departure Time:
-
3.8 Cleaners operated in accordance with relevant SOPs.
-
Departure Time:
-
3.9 General baggage/ULDs loaded into aircraft in accordance with SOPs and as per LIR<br>(e.g. tags/labels checked, maximum height indicator line, ULD locks/latches raised).<br>
-
3.10 Priority/Conx baggage and restricted items segregated and loaded as per LIR.
-
3.11 Webbing secured/power to holds switched off/sliding carpet retracted in accordance with SOPs.
-
3.12 Final bag count confirmed by Leading Hand (Inc. bingo sheets collected).
-
3.13 Final deadload correctly communicated to AMCO.
-
3.14 Final documentation checked before signing (Final LIR/LS/NOTOC).
-
3.15 Any LMCs communicated to captain and final load communicated to LOCO.
Aircraft Departure
4. Guest Boarding
-
4.1 Autoboard commenced on time, if not, what time did boarding start?
-
Time:
-
4.2 Aircraft rubbish collected from base of stairs before boarding commenced.
-
4.3 Marshaller positioned and equipment used correctly in accordance with SOPs (e.g. flag bins).
-
4.4 Correct DPL procedures used for SSR boarding.
5. Door Closure
-
5.1 Guest door closure communicated with cabin crew.
-
5.2 Guest/cargo doors closed correctly in accordance with SOPs for aircraft type<br>and checked for damage.<br>
Aircraft Unloading
6. GSE
-
6.1 GSE operated correctly in accordance with SOPs (e.g. clearances checked and monitored).
-
6.2 GSE removed correctly in accordance with SOPs (e.g. correctly marshalled).
7. Aircraft Dispatch
-
7.1 Aircraft dispatcher positioned at aircraft -10 ETD to perform duties <br>(e.g. FOD check, pushback tug and towbar connected, door/panel check completed).<br>
-
7.2 Correct dispatch procedure followed for aircraft dispatch (e.g. freestanding/pushback).
-
7.3 Correct procedure followed by pushback driver (e.g. pushback/CPT procedures).
Post Departure
8. General Duties
-
8.1 Delay reason given to AMCO for any delays on departure.
-
8.2 All GSE secured and stored behind Minimum Equipment Lines.
-
8.3 Ramp Staff remain at gate until aircraft dispatch (Off blocks).
-
8.4 Leading Hand/Delegate completed and files all relevant documentation <br>(Including relevant flight file documents, maintenance log faxed if required).<br>
Observations/Notes
-
Free Format