Project Information
-
Document No.
-
Part No.
-
Revision No.
-
Client Name
-
Project Name
-
Inspection Started
-
Prepared by
-
Location
Test Details
-
Drawings Supplied
-
Drawing Number
-
Drawing Revision
-
Drawing Date
-
Drawing Approval RPEQ
-
Specifications Required
- SEQ Water Supply and Sewerage D&C Code
- Water Services Association
- AS/NZS 3500 Plumbing & Drainage
- Queensland Urban Utilities
- Gold Coast City Council
- Logan City Council
- Ipswich City Council
- Redland Shire Council
- Tweed Shire Council
- Ballina Shire Council
- Byron Shire Council
- Lismore City Council
- Project Specifications
-
Pipeline Construction Type
- Unplasticised PVC
- Glass Reinforced Plastic
- Polypropylene
- Ductile Iron Cement Lined
- Mild Steel Cement Lined
- Vitrified Clay
- Reinforced Concrete
- Polycrete
- Polyethylene
-
Test Method SEQ Code Amendment to WSA02-2002-2.3, Clause 22.4.2.1
Initial Vacuum Pressure = -27kPa
Settle Time = 3 Minutes
Test Vacuum Pressure = -23.60kPa
Hold Time = As per Table 22.4
Allowable Loss in Nominated Timeframe = 7kPa -
Add pipeline
Pipeline
-
Pipeline Identification Details
-
Pipeline Diameter
- 100mm diameter
- 150mm diameter
- 225mm diameter
- 250mm diameter
- 300mm diameter
- 375mm diameter
- 450mm diameter
- 525mm diameter
- 600mm diameter
- 675mm diameter
- 750mm diameter
- 900mm diameter
- 1000mm diameter
- 1050mm diameter
- 1200mm diameter
- 1500mm diameter
- Other
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 2 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 3 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 3 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 5 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa for
6 MINUTES -
Consider retesting in shorter lines as this length is outside the Specifications
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 4 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 5 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 8 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 10 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 13 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 15 MINUTES
-
Consider retesting in shorter lines as this length is outside the Specifications
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 6 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 9 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 14 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 18 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 23 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 29 MINUTES
-
Consider retesting in shorter lines as this length is outside the Specifications
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 7 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 14 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 22 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 29 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 36 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 43 MINUTES
-
Consider retesting in shorter lines as this length is outside the Specifications
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 10 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 21 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 31 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 41 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 52 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 66 MINUTES
-
Consider retesting in shorter lines as this length is outside the Specifications
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 14 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 28 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 42 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 56 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 70 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 86 MINUTES
-
Consider retesting in shorter lines as this length is outside the Specifications
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 18 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 37 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 55 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 73 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 92 MINUTES
-
Accept the pipeline under test if the test vacuum loss is =/<7kPa in 106 MINUTES
-
Consider retesting in shorter lines as this length is outside the Specifications
-
Refer to WSA02-2002-2.3 Table 22.4 to extrapolate test hold time
-
Actual Pipeline Diameter
-
Nominate Extrapolated Hold Time
-
RESULT
-
Enter details of Project Specifications Must include initial vacuum pressure, settle time, allowable time and final drop vacuum pressure
-
Line Number
-
Pipeline Construction Type
- Unplasticised PVC
- Glass Reinforced Plastic
- Polypropylene
- Ductile Iron Cement Lined
- Mild Steel Cement Lined
- Vitrified Clay
- Reinforced Concrete
- Polycrete
- Polyethylene
-
Pipeline Diameter
- 100mm diameter
- 150mm diameter
- 225mm diameter
- 250mm diameter
- 300mm diameter
- 375mm diameter
- 450mm diameter
- 525mm diameter
- 600mm diameter
- 675mm diameter
- 750mm diameter
- 900mm diameter
- 1000mm diameter
- 1050mm diameter
- 1200mm diameter
- 1500mm diameter
- Other
-
Actual Pipeline Diameter
-
RESULT
Test Procedure
Confirm Project Information
-
Pipelines to be inspected and their details
-
Testing specification requirements
Initial Work Area Inspection
-
Is test area barricaded off or sufficiently delineated?
-
Is traffic control established?
-
Has a Safe Work Method Statement been completed and all control measures followed?
-
Has a Confined Space Risk Assessment & Entry Permit been completed?
-
Is the confined space equipment and procedures set up as per the Risk Assessment & Entry Permit conditions followed?
-
Structure lids removed and placed at a safe distance from the entry point
-
Environmental controls installed as and if required
Inspection Steps
-
Equipment checked and in good working order
-
Insert test plugs into the structure inlets with extendable pole if possible
-
Inflate plugs and add support as per manufacturer's specifications
-
Attach bypass plug to vacuum pump and vacuum down pipeline to test pressure
-
Allow for vacuum to stabilise for an amount of time as per specifications
-
Hold vacuum for time specified in specifications and record result
Disassemble Steps
-
Disconnect hose from vacuum pump and release pressure from pipeline
-
Release pressure from plugs and carefully retrieve plugs out of structure
-
Replace structure lids, remove barricading and return all items to test unit
Final Demobilisation
-
Notify client of results and to contact TestX office to arrange further testing or reports
-
Calibrated gauge numbers used
-
Inspector's remarks
-
Photo of work area and inspected pipeline
-
I declare that the inspection procedure was followed in accordance with the nominated specifications
-
Inspection Completed
-
Report Issue Date