Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • What Type of Audit

  • Company Name

  • Principle Name

  • Rego

  • Audit ref Number

Job Site

  • Work Ahead Sign. Are signs placed to alert traffic?

  • Prepare to Stop Sign. Are signs placed to alert traffic?

  • Stop/Slow Bat. Is traffic control needed?

  • Traffic Cones (26 Cones). Cones used to warn of work area and potential hazards.

  • All Roads Covered. Are signs placed to alert oncoming traffic?

  • Sight Distance Appropriate to Speed. Are signs placed to alert oncoming traffic?

  • Traffic cones used for parked vehicle. Cones used to warn of work area and potential worksite hazards.

  • Traffic cones used for travel path. Cones used to warn of work area and potential hazards.

  • General site housekeeping.

  • Aerial Risk Assessment (form) completed?

PPE

  • 10 m anti slide orange rope

  • Dust Mask (must be P1 or P2 type mask)

  • Electrical (LV) Gloves stored in appropriate bag/location. LV Gloves clean/no holes or tears/kept in bag out of sunlight.

  • Gloves Tested Date

  • Eye Protection - Clear and Dark.

  • Fall arrest/Restraint System. Serviceable date.

  • Tested Date

  • Full body safety body harness. Serviceable date

  • Tested Date

  • Hearing Protection

  • Ladder head rope. Attached to ladder

  • Pole Strap. Serviceable date

  • Tested Date

  • Retro Reflective vest. Clean with reflective tape in good condition.

  • Riggers Gloves.

  • Safety Belt / Harness ( All locking clips checked). Check for fraying

  • Tested Date

  • Safety Footware. No steel caps exposed.

  • Safety Helmet & Retaining Strap. Issue date checked.

  • Tested Date

  • Safety Rope. 20 meters of rope

  • Sharps Container & Tongs

  • Uniform appropriate & in good condition. Check for wear holes.

  • Trauma Strap.

Electrical Equipment ( Testing and Tagging)

  • 240 volt stick.

  • Tested Date

  • Battery Charger.

  • Tested Date

  • Bonding strap.

  • Tested Date

  • ELCBR (RCD)

  • Tested Date

  • GPO Tester

  • Tested Date

  • Hammer Drill

  • Tested Date

  • Multimeter

  • Tested Date

  • Watmaster Pencil Tester

  • Tested Date

  • PDU Installation Kit

  • Tested Date

  • Vehicle Amber Flashing Lights

Ladder Check

  • Loose steps or rungs ( consider loose if they can be moved by hand)

  • Cracked, split or broken stiles or rungs

  • Damaged or worn non slip rungs

  • Is the ladder free from corrosion?

  • Are the side rails and step free of oil or grease?

  • Are the ropes extension ladders intact without fraying or excessive wear?

  • Loose or Bent hinge spreaders ( Step Ladder)

  • Broken stop on hinge spreaders ( Step ladder)

  • Loose Hinges ( Step Ladder)

  • Loose, Broken, or missing extension clutch ( extension ladder )

  • Defective clutch that do not seat properly when the ladder is extended ( extension ladder)

  • Span Hooks ( extension ladder)

  • Ladder Levelers ( extension ladder)

  • Up and up feature ( extension ladder)

  • are the ropes on extension ladders intact without fraying or excessive wear? (step ladder)

Documentation

  • Project Safety Management Plan

  • Project Safety Work Instructions

  • CFWG

  • MSDS - Silastic's Adhesive

  • MSDS - Silicon Grease

  • MSDS - Gel Filled Cable

  • MSDS - ( Dangerous/Hazardous substances)

  • Optus ID Badge

  • Exp Date

  • Stream Policies ( SHE. QUALITY, CONSULTATION, ect)

Vehicle

  • Vehicle Body in good condition

  • Vehicle lights working

  • Vehicle Clean

  • Tyres in good condition'

  • Shelving sufficient / appropiate

  • Pipe storage and Conduit Carrier ladder rack secure.

  • Vehicle Doors operational

  • Cargo area (secure load)

  • Vehicle Registration Current

  • Exp Date

  • Vehicle Serviced

  • Due Date

Vehicle Content

  • Ball Pein Hammer

  • Danger Tags ( min 5)

  • Fiberglass extension ladders (check ladder for cracks and damage)

  • Fiberglass step ladder ( check ladder for cracks and damage)

  • First Aid Kit ( check contents for currency)

  • Ladder Levelers

  • Measuring Stick

  • Pole Bucket

  • Prepare to stop sign ( class1) ( Should be clean / free from damage)

  • Retro Reflective cones ( 26) (should be clean / free of damage)

  • MSQ900 Signal Meter ( including Calabrationdate) (Power on)

  • Calibration Date

  • Spray Bottle

  • Stop Slow Bat ( Class 1)

  • Worker ahead sign ( Class 1)

License Checks

  • ACAM Licence

  • ACAMA License Exp Date

  • Construction Induction Card ( White)

  • Exp Date

  • Drivers License Valid

  • Drivers License Exp Date

  • OHS Induction Accreditation and Optus Induction Card

  • Exp Date

  • Power Awareness

  • Power Awareness Exp Date

  • Working at Heights

  • Working at Heights Exp Date

  • Traffic Control

  • Traffic control Exp date

  • Action Item 1

  • Person to Action 1

  • Close out 1

  • Close out Date 1

  • Action Item 2

  • Person to Action 2

  • Close out 2

  • Close out Date 2

  • Action Item 3

  • Person to Action 3

  • Close out 3

  • Close out Date 3

  • Action Item 4

  • Person to Action 4

  • Close out 4

  • Close out Date 4

  • Action Item5

  • Person to Action 5

  • Close out 5

  • Close out Date 5

  • FST Signature

  • Date Completed

  • FS Signature

  • Date Completed

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.