Audit

The version control will be maintained by the SHEQ team and is controlled via the Safety Equipment Inspections Document 2073838157-15.
Pump Foot Step Bend Arrangement / Snor Level

Inspected?

Height to the Snor level from the bottom of the floor (mm) (Show on the sketch))

Draw sketch of well

Any Specific Observations / Comments

Suction Safety Level

Adjusted During Project?

Commissioned Trip Point - Unit 1

Commissioned Trip Point - Unit 2

Pump 1

Running Current

Snor Current

Pump 2

Running Current

Snor Current

Comments

Station Pumping Duty Set Up
Commissioned Duties (A)

Duty Cut In

Duty Cut Out

Commissioned Duties (B)

Duty Cut In

Duty Cut Out

Comments

Flush Valve (Record Information if not completed during Phase 1)

Flush Valve Present?

Inspected?

Time flush valve remained open (Seconds)

Does it function properly?

Any Specific Observations / Comments

Pressure Gauging

If all pressures were recorded on initial inspection please indicate below

Pressure Gauged?

Were all pressures recorded on initial inspection?

If 'Yes', disregard the following.

When Unit 1 Running

Pressure at rising main (down stream side of reflux valve) for single unit running

Pressure at discharge pipe work (pump side of reflux valve) for single unit running

When Unit 2 Running

Pressure at rising main (down stream side of reflux valve) for single unit running

Pressure at discharge pipe work (pump side of reflux valve) for single unit running

When Both Units Running

Pressure at rising main (down stream side of reflux valve on common rising main) for both units running

Unit 1 - Pressure at rising main (down stream side of reflux valve) for both units running

Unit 2 - Pressure at discharge pipe work (pump side of reflux valve) for both units running

Additional Information

Any other Observations / Comments / Defects

Take multiple photos (if required)
Sign