The version control will be maintained by the SHEQ team and is controlled via the Safety Equipment Inspections Document 2073838157-15.
Plan Work
-
What types of site hazards would you incorporate into your TRA
-
List 5 methods of controlling hazards on site
-
What precautions must be observed when working near overhead power lines?
-
How do you determine the allowable load of the MEWP?
-
How would you find out the safe working distance around power lines in your work area?
-
At what wind speed would you cease operation of an MEWP?
-
When an MEWP is fitted with outriggers, can the outriggers impact underground services when deployed?
-
Can you outline a situation where a spotter would be required whilst operating an MEWP? What must the spotter be familiar with?
-
Should an MEWP be set up next to an open trench? What general rule should be applied regarding safe working distances for excavations?
Conduct Routine Checks
-
Can the Operator demonstrate what pre-operational checks would be made prior to starting the machine? <br>• Safety features and alarms: condition and operation <br>• Hydraulic and fluid: levels and leaks <br>• Controls and gauges: operating normally and labelled <br>• EDD: condition, operational and position <br>• ID plates and decals: present and readable <br>• Check machine service is conducted regularly<br>• Familiarise oneself with the operation components of the machine<br>• Tyres: condition<br>• Latch on gate: condition<br>• Outriggers (if fitted): condition<br>• Structural body damage<br>• Condition of access (ladder)<br><br>
-
After starting the machine the operator completed function tests of at platform controls and at ground controls
-
Can the Operator identify the location of the following documentation? <br>• MEWP log book <br>• Company/site Procedures<br>• Operators Manual <br>• SMWS <br><br>
-
Has the operator done the following? <br>• Read and signed onto SWMS<br>• Completed PTWC<br>• Completed machine prestart <br><br>
-
Can the Operator advise what the safe working load of the MEWP is?<br>
Set up MEWP
-
If the ground is soft or wet, what steps must be taken to assess the situation and if appropriate, to improve the load distribution under the MEWP?
-
What do you do if the MEWP you are in seems to be leaning to one side?
-
If fitted, when should the outriggers be deployed on the MEWP?
-
What points shall be considered when setting up for the correct use of outriggers?
-
When operating a MEWP on a suspended floor of a building, what must the operator ensure prior to undertaking his work?
-
During set up, did the Operator ensure the following? <br>• The MEWP set up was satisfactory in relation to the task to be undertaken <br>• Parking brake firmly applied <br>• Where outriggers are fitted, these are <br>• fully extended and appropriate packed <br>• Steering/brakes: operations <br>• The movement of the basket will not <br>• bring any part of the machine within the<br>• minimum distance from live overhead<br>• conductors as specified<br>• Exclusion zones established and signage<br>• Rotating flashing lights working<br>• Travelling alarm working <br>• All personnel are clear of the patch of the scissor lift while the platform is being lowered to the entry position<br><br><br>
Operate MEWP
-
If the MEWP was to come into contact with the power lines, what must be done?
-
Under what conditions can the SWL of the platform/basket capacity be exceeded?
-
When may a self-propelled MEWP be driven in an elevated position?
-
Can you mobile an MEWP across the side of a hill? Explain your answer
-
Can the Operator demonstrate the sequence of events involved in raising, and lowering the platform/basket? Were the following points considered?<br>• Assess task requirements, height, radius and any workplace hazards<br>• Ensure the MEWP is set on solid foundations<br>• Extend outriggers fully<br>• Place pig-sty packing under outriggers to distribute load over a larger area<br>• Ensure access to and from platform/basket is suitable and safe<br>• Raise and lower the platform/basket<br>• Extend the platform (scissor lift only)<br>• Demonstrate all directions of travel<br>• Operate EDD controls<br><br>
-
Did the Operator demonstrate skills required to meet project levels?
-
Can the operator demonstrate how to remove the console and operate the MEWP from outside the basket for manoeuvring through doorways and other restricted head clearance areas?
-
Did the Operator demonstrate sufficient knowledge of Plant Risk Assessment?
-
Did the Operator monitor exclusion zones during works?
Shut Down MEWP
-
What post operation checks are required to be performed on an MEWP?
-
List 3 locations you should avoid parking an MEWP
-
Can the Operator demonstrate the steps involved in shutting down an MEWP?<br>Were the following points considered?<br>• Identify all obstructions and site hazards <br>• Lower platform/basket <br>• Retract outriggers <br>• Lock platform/basket of carrier to prevent excessive movement<br>• Stowe away packing utilised<br>• Shut down motor<br>• Disembark from platform/basket<br>• Isolate MEWP<br><br>
VOC Results
-
Competency of the applicant can be verified on the date of this VOC?<br>
-