Audit

The version control will be maintained by the SHEQ team and is controlled via the Safety Equipment Inspections Document 2073838157-15.
Visual

1 : Inspect for damaged and / or missing power and control cables

Observation / Measurement

2: Inspect external surface for corrosion ( Records level - Nil , slight , moderate or severe )

Observation / Measurement

3: Inspect pump for mechanical damage or missing components

Lifting bridle

Chains

Shackles

Mechanical seals

4: Extract all water from bottom of oil chamber. Record volume ( C Pumps )

Observation / Measurement

5: Extract all water from bottom of stater housing. Record volume ( N pumps )

Observation / Measurement

6: Seal chamber pressure test , 100kpa / 5 minutes

Observation / Measurement

Electrical tests

8: Megger test windings and record wire No's

Observation / Measurement Phase 1

Observation / Measurement Phase 2

Observation / Measurement Phase 3

9: Measure Thermistor resistance and record wire No's ( C pumps )

Observation / Measurement

10: Measure Thermal contacts resistance and record wire No's ( C pumps )

Observation / Measurement

11 : Measure tritronics contacts +FLS10 resistance and record wire No's ( C pumps )

Observation / Measurement

12: Measure Thermal contacts + FLS10 resistance and record wire No's ( N pumps )

Observation / Measurement

Impeller

13 : Remove any foreign objects from impeller

Observation / Measurement

14 : Inspect impeller and pump case for damage and wear , check wear ring clearance and record

Observation / Measurement

15: Check impeller can be rotated by hand

Observation / Measurement

Test Run

16: Connect pump to power supply and operate at no load. Record running currents

Observation / Measurement

17: Record abnormal noise and vibration.

Observation / Measurement

Completion

Comments

Fit for service

Sign Here