Information

  • The version control will be maintained by the SHEQ team and is controlled via the Safety Equipment Inspections Document 2073838157-15.

  • Maximo number

  • Bin location

  • Model

  • Impeller number /diameter

  • Serial Number

  • Recommended Summary

  • Select date

The version control will be maintained by the SHEQ team and is controlled via the Safety Equipment Inspections Document 2073838157-15.

Visual

  • 1 : Inspect for damaged and / or missing power and control cables

  • Observation / Measurement

  • 2: Inspect external surface for corrosion ( Records level - Nil , slight , moderate or severe )

  • Observation / Measurement

  • 3: Inspect pump for mechanical damage or missing components

  • Lifting bridle

  • Chains

  • Shackles

Mechanical seals

  • 4: Extract all water from bottom of oil chamber. Record volume ( C Pumps )

  • Observation / Measurement

  • 5: Extract all water from bottom of stater housing. Record volume ( N pumps )

  • Observation / Measurement

  • 6: Seal chamber pressure test , 100kpa / 5 minutes

  • Observation / Measurement

Electrical tests

  • 8: Megger test windings and record wire No's

  • Observation / Measurement Phase 1

  • Observation / Measurement Phase 2

  • Observation / Measurement Phase 3

  • 9: Measure Thermistor resistance and record wire No's ( C pumps )

  • Observation / Measurement

  • 10: Measure Thermal contacts resistance and record wire No's ( C pumps )

  • Observation / Measurement

  • 11 : Measure tritronics contacts +FLS10 resistance and record wire No's ( C pumps )

  • Observation / Measurement

  • 12: Measure Thermal contacts + FLS10 resistance and record wire No's ( N pumps )

  • Observation / Measurement

Impeller

  • 13 : Remove any foreign objects from impeller

  • Observation / Measurement

  • 14 : Inspect impeller and pump case for damage and wear , check wear ring clearance and record

  • Observation / Measurement

  • 15: Check impeller can be rotated by hand

  • Observation / Measurement

Test Run

  • 16: Connect pump to power supply and operate at no load. Record running currents

  • Observation / Measurement

  • 17: Record abnormal noise and vibration.

  • Observation / Measurement

Completion

  • Comments

  • Fit for service

  • Sign Here

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.