Information

  • The version control will be maintained by the SHEQ team and is controlled via the Safety Equipment Inspections Document 2073838157-15.

  • WO Number

  • Location: SP

  • Conducted on

  • Address
  • Personnel

Preliminary Tasks

Set up

  • Time tanker arrived on site

  • Tanker Type / Size

  • Observations / Remarks

  • Was the truck able to position into designated location on the site?

Equipment connected

  • Time tanker started pumping

  • Well level at start of pumping

  • Well level at end of pumping

  • Time tanker left site on route to discharge location

  • Time tanker arrived at discharge point

  • Time tanker returned to site

  • Was the tanker testing successful?<br>(ie. was the equipment deployed to site, setup and managing flow within 4 hours of request)

  • Did the contingency drawing require correction?

Sequence / task

  • Equipment commenced operation

  • Ran for 2 cycles

  • Was the bypass pump test successful?<br>(ie. was the equipment deployed to site, setup and managing flow within 4 hours of request)

Safety , Enviornment , Community

Were there any issues with:

  • Safety

  • Environment

  • Community

  • Comments, improvements, suggestions, overall impression………… include work order number where raised for remedial work

  • Return Wet Testing form to Ventia Logistics (for data entry to Maximo)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.