Information
-
Applicant/ Trainee Name
-
Conducted on
-
Assessment Type
- Verification of Competence (VOC) In-house
- Pre-employment Assessment
-
Assessor
- Peter Brunt (Training and Assessment RTO NO: TR1075)
- Brendon Moore (BSC Trainer/Assessor)
-
PCBU / Client
-
Department Section
- Engineering Works Construction
- Engineering Works Maintenance
- Engineering Works Construction and Concreting
- Trades
- Workshop
- Water and Wastewater
- Open Spaces and Reserves
- Waste Management Centre
- Byron Bay Council
-
Department / Section
-
Team Leader
-
Coordinator
-
Supervisor Name
-
Location
UNIT 1. CONDUCTS ROUTINE CHECKS
UNIT 1: CONDUCT ROUTINE CHECKS
1. Conducts routine checks of excavator (Description)
-
Completes daily pre-start checklist
-
Complete walk around machine
-
Underneath machine for any water or oil leaks
-
Track condition and tension
-
Fuel
-
Oil level in slew motor
-
Hydraulic oil level
-
Vent hydraulic tank ( release pressure)
-
Engine oil
-
Battery security, water level and cleanliness
-
Coolant in radiator or header tank
-
Air tank drained
-
Air pre- cleaner filter
-
Air filter indicator
-
Load chart (understands)
-
Section Comments
2. Visual check of structure/attachments for defects (Description)
-
Attachments for condition and security
-
Damaged or broken parts
-
Quick hitch attachments/safety locking device secure
-
Explains falling object protective structure (FOPs)
-
Explains roll over protective structure (ROPs)
-
Loose, nuts, bolts, couplings and keeper plates
-
Inspects bucket for damage
-
Bucket for missing, worn or loose teeth
-
Worn skid plates or cutting edge
-
Hydraulic hoses, fittings and general damage
-
Hydraulic rams for security and oil leaks
-
Connections for missing keeper plates or pins
-
All other attachments for condition and security
-
General machine damage and broken parts
-
Section Comments
3. Check other equipment defects (Description)
-
Understands legal requirements of slinging loads
-
Communicates with dogman
-
Lifting lug
-
Wire slings
-
Chain slings
-
Synthetic slings
-
Shackles
-
Other lifting gear
-
Section Comments
4. Inspects site and plans work (All site hazards are identified and potential hazards from other sites - verbal)
-
Power lines
-
Trees
-
Overhead service lines
-
Surround buildings
-
Obstructions
-
Other equipment in the area
-
Pedestrians in the area
-
Dangerous materials
-
Underground services
-
Recently filled trenches
-
Section Comments
5. Appropriate safe access and path of load movement is shown (Description)
-
To work area
-
For the loads being moved
-
Traffic control considered
-
Section Comments
6. Fits appropriate equipment for task
-
Suitable tool used
-
Changes bucket
-
Secures catches
-
Insert safety pin and checks for security
-
Correct procedure adopted
-
Works safely
-
Section Comments
7. Conducts pre-operational start -up checks in accordance with manufacturer,s specifications/operating manual
-
Windows clean
-
Mounts correctly ( 3 points of contact facing machine)
-
Adjust seat
-
Fastens seat belt
-
Safety lever in neutral
-
Park brake on (tyre type)
-
Engine start
-
Check gauges
-
Warm up allowed
-
Rotating hazard light
-
Full attachment movement
-
Brakes forward and reverse (hand brake for wheel type)
-
Steering - not tracking
-
Clear for travel
-
Checks behind for vehicles and pedestrians
-
Section Comments
UNIT 2. SHIFT LOAD
UNIT 2: SHIFT LOAD
8. Drives to the work area (Description)
-
Selects correct controls
-
Raises attachments smoothly
-
Ensures direction of travel clear of pedestrians and obstacles
-
Selects appropriate route
-
Travels at and works at a safe speed
-
Carries bucket at a safe travelling height and crowded back
-
Section Comments
9. Operates excavator: Picks up and carry load, loads truck (Description)
-
Stabilises excavator (particular attention when on stockpiles)
-
Machine turntable level and safe to operate
-
Personnel and plant clear of operating radius
-
Smoothly operates controls
-
Completes task in logical sequence
-
Crowds bucket to full
-
Competently picks up material
-
Equipment operated at a safe speed in relation to task
-
Ensures direction of slew is clear
-
Cuts trench to specifications
-
Demonstrates excavation around a pipe
-
Deposits material the required distance from excavation
-
Minimises spillage and ground damage
-
Constantly checks direction of travel is clear
-
Has the truck positioned for safe and easy loading
-
Slews and/or approaches truck or trench correctly
-
Smoothly raises and dumps load
-
Repositions bucket ready to load while in motion
-
Maintains stockpile and working surface
-
Shifts load safely
-
Lowers load to designated location
-
Loads placed to ensure stability
-
Section Comments
10. Identifies the following signals (Responds correctly to signals)
-
Stop - hand
-
Boom Up - hand
-
Boom Down - Hand
-
Slew right - hand
-
Slew left - hand
-
Travel / traverse
-
Section Comments
11. Consolidates and levels surface
-
Consolidates fill with loader
-
Levels surface with bucket / blade
-
Excess fill for natural compaction
-
Maintains level surface to work off
-
Section Comments
UNIT 3. SHUT DOWN EQUIPMENT and SECURE SITE
UNIT 3: SHUT DOWN EQUIPMENT and SECURE SITE
12. Shuts down equipment and secures site (Description)
-
Parks equipment in a suitable location away from danger areas
-
Attachments lowered to ground
-
Cutting edge of bucket on ground
-
Neutralises controls
-
Applies parking brake (wheel type excavator)
-
Idles down, shuts down and locks ignition
-
Moves controls to release pressure
-
Applies safety lock
-
Dismounts correctly (Face machine 3PC)
-
Attachments removed and cleaned for storage
-
Removes keys
-
Carries out regular programmed maintenance
-
Reports and/or removes defective parts safely and effectively
-
Locks cabin (Refer Company policy)
-
Work area is cleared and recyclable materials are disposed of appropriately
-
Machine greased
-
Plant, tools and equipment cleaned, maintained and stored
-
Section Comments
ASSESSMENT RESULTS
Trainee / Applicant Competency Results
-
Competent or Not Yet Competent (based on the judgment of the Assessor).
Assessor name and signature
-
Assessor Comments
-
Name and signature