Information

  • Project Number

  • Project Type

  • Vessel

  • Conducted on

  • Prepared by

  • Location
  • Crew Members Present

Planning

  • AFE Project Setup?

  • Work Order Created?

  • HES Representative Notified?

  • Marine Chemist Notified?

  • Operations Notified?

  • Logistics/ Central Dispatch Notified?

Safety

  • Secondary Means of Egress?

  • Shore Power Sufficient?

Work Permitting/ Lockout Tagout

  • HES Representative on site?

  • Marine Chemist Certificate Obtained?

  • Safe Work Permit Issued?

  • Energy Sources Verified, Isolated, Locked & Tagged?

  • Energy Source keys locked in Lockbox?

Port Main Engine, De-commission

  • Project Type

  • Fuel Supply Isolated

  • Pneumatic Supply Isolated

  • Battery Supply Voltage Isolated

  • Equipment Specific Comments<br>

  • Engine Control Module (ECM) Isolated

Starboard Main Engine, De-commission

  • Project Type

  • Fuel Supply Isolated

  • Pneumatic Supply Isolated

  • Battery Supply Voltage Isolated

  • Equipment Specific Comments<br>

  • Engine Control Module (ECM) Isolated

Port Main Engine, Re-commission

  • Fuel Supply Restored

  • Pneumatic Supply Restored

  • Engine Control Module (ECM) Reconnected

  • Battery Voltage Restored

  • All Components Free of Leaks

  • Instruments Working Properly

  • Alarm System Working Properly

  • Engine Control/ Throttle Responding Properly

  • Miscellaneous

Starboard Main Engine, Re-commission

  • Fuel Supply Restored

  • Pneumatic Supply Restored

  • Engine Control Module (ECM) Reconnected

  • Battery Voltage Restored

  • All Components Free of Leaks

  • Instruments Working Properly

  • Alarm System Working Properly

  • Engine Control/ Throttle Responding Properly

  • Miscellaneous

Port Genset, De-commission

  • Project Type

  • Fuel Supply Isolated

  • Pneumatic Supply Isolated

  • Battery Voltage Isolated

  • Equipment Specific Comments

  • Engine Control Module (ECM) Isolated

Starboard Genset, De-commission

  • Project Type

  • Fuel Supply Isolated

  • Pneumatic Supply Isolated

  • Battery Voltage Isolated

  • Equipment Specific Comments

  • Engine Control Module (ECM) Isolated

Port Genset, Re-commission

  • Fuel Supply Restored

  • Pneumatic Supply Restored

  • Engine Control Module (ECM) Re-connected

  • Battery Voltage Restored

  • High/Low Voltage Components Connected Properly

  • All Components Free of Leaks

  • Instruments Working Properly

  • Alarm System Working Properly

  • Miscellaneous

Starboard Genset, Re-commission

  • Fuel Supply Restored

  • Pneumatic Supply Restored

  • Engine Control Module (ECM) Reconnected

  • Battery Voltage Restored

  • High/Low Voltage Components Connected Properly

  • All Components Free of Leaks

  • Instruments Working Properly

  • Alarm System Working Properly

  • Miscellaneous

General

  • Comments

  • Future Projects

  • Equipment to be Rebuilt for Spare

Signature

  • On Site Representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.