Information

  • Site Address

  • Job No.

  • Conducted on

  • Prepared by

Pre-commencement Report

1.01 Rubbish/Debris

  • Has all Rubbish/debris been removed?

  • Contacr council or relevant authority to report illegal dumping

  • Please note approximate loads

1.02 Grass/vegetation

  • Has all Grass/vegetation been cut prior to starting work?

  • Please note approximate height of grass (m)

1.03 Trees

  • Have all trees on site been removed prior to starting work?

  • Please note number of trees to be removed

1.04 Footpath

  • Is footpath free of Damage? (take photographs to note)

  • Please photograph damage

1.05 Kerb & Gutter

  • Is the kerb & gutter free of damage? (take photographs to note)

  • Please photograph damage

1.06 Boundary Fence

  • Is the boundary fence free of damage? (take pic to note)

  • If No, Please photograph damage

1.07 Fill

  • Does site require extra fill to be imported?

  • Please note approx loads

1.08 Cranes

  • Extra cranes required?

  • State reason(s) for extra crane?

  • Which deliveries would require extra cranes?

1.09 Power lines

  • Power lines-tiger tail insulation required?(If unsure notify WHS Manager for safety assessment)

  • WHS Manager to assess, please ensure clear wide angle photographs are taken of area of concern.

  • If Yes, please select of area cable insulation.<br>

1.10 Traffic Control

  • Is traffic control required

  • Give reasons why traffic control may be required?

1.11 Retaining Walls

  • Is a retaining wall required following site excavation?

COMMENTS

  • Comments/recommendations

Site Manager Sign off

  • I the Site Manager of above mentioned site certify items raised in this report are true and correct as of date stated on report.

Pre-commencement Report

2.00 Internal Use Only

  • Is site within 1km of the ocean or non surf coast?

  • Is site classified as tight site?(if Yes what trades will be affected?)

  • Sewer affected? (supervisor to check plans, if Yes ensure all plans are correct)

  • Are all pegs in place?

  • Please note number of pegs needed

  • Is Tree protection zone required? (refer to DA condition)

  • Acquire appropriate signage from WHS Manager, ensure you sketch on Fence/barricade layout.

  • Is existing boundary fencing 1.8m high?

  • Fencing ordered?

  • Sketch boundary where temporary fence is required, please note if shade clothe is required

  • All weather access on site ordered?

  • Water on site?

  • Have you organized Safety Signage, Padlock and WHS Management Plan for site? (advise WHS Manager)

  • Have you organised Villa World promotional signage/shade clothe?

  • Is site in close proximity to school or park?(if Yes notify WHS Manager)

  • Is traffic management plan required? (refer to DA condition)

  • Will scaffold require shade cloth?(if Yes notify scaffolder)

  • Would normal deliveries be affected due to site conditions? (internal note: if Yes, supervisor to contact transport company prior to frame, brick, steel and sand deliveries)

  • Does set back requirement require pinning of slab for brickwork? (pinning required when boundary setback is less than 950, allowance for render to be made on site)

  • I have read and understood all items on DA or CDC conditions

  • General Comments, regarding DA/CDC conditions.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.