Title Page

Audit Information

MILFORD DAM

  • Date of Audit

  • Auditor

  • Weather Conditions

  • Rain Gauge (mm)

  • Signs of Unauthorised Entry

  • General Comment

Reservoir

  • Reservoir Banks

  • Reservoir Level (m)

  • General Observations

  • Add Photo of observations

Dam Wall

  • Upstream Face

  • Crest

  • Dam Survey Points

  • Downstream Face

  • Piezo Readings Piezo Frequency Period Temp

  • Standpipe Readings

  • Comments (any significant changes)

  • Add Photo

Spillway

  • Is Dam Spilling

  • Spillway Approach

  • Crest

  • Unlined Spillway Chute

  • Rock-Lined Spillway Chute

  • Stilling Basin

  • Comments

  • Add Photo

Inlet/Outlet Works

  • Pontoon

  • Isolation Valve

  • Isolation Valve Pit

  • Outlet Valve

  • Valve Release (ML/Day)

  • Comments

  • Add media

Downstream of Dam

  • Left and Right Banks

  • V Notch Readings

Secondary Spillway

  • Spillway Crest

  • Comments

  • Add Photo

Summary

  • Are there any items which require more detailed Monitoring?

  • General comments on inspection if required

  • Signature of Auditor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.