Information
-
Ticket of Work Number
-
Conducted on
-
Prepared by
-
Location
-
Field Staff / Sub-contractor
Aerial Drop
-
SDS Installed to specification
-
Correct Port used at MPT
-
Minimum Clearance maintained from Power Authority Assets
-
All fittings and terminations to specification
-
Drop cable slack loops secured with cable ties
-
Drop cable secured to pole as per specifications
-
Attachment at premises to specifications
-
Drop cable clear of vegetation
-
Drop cable tagged at both ends (MPT & PCD)
-
All fittings & terminations to intermediate poles to specifications
-
Sufficient space under eaves for bend radius of the drop cable
Premise Connection Device (PCD)
-
Minimum 1m radial distance from any power source, including the point where the premises power supply cable connects to the property barge
-
Minimum 150mm from exterior structure such as window or balcony
-
Minimum 150mm from corner of wall
-
minimum 300mm allowed to open the PCD door
-
minimum 300mm allowed to open the PCD door
-
Mechanical Connector terminated on drop fibre & housed correctly in PCD
-
Drop cables entering PCD from bottom only
General
-
Has there been an acceptable reinstatement and clean up of the end users property