Welcome

  • Project number

  • Site Address.

  • Location.
  • Installation carried out by?

  • Audit Carried out by?

  • Add signature

  • Audit conducted on:

  • General photo of site

Sections

1.0 Rack installation

  • 1.1. Has rack Been installed as per manufactures specification

  • 1.2. Has the racks been labelled according to the latest label manual

  • 1.3. Does the cabling to the racks match what was on the design

  • 1.4. Compliant?

  • Comments!

  • Add media

2.0 cable tray installation

  • 2.1. Has the cable tray been installed as per equipment layout drawing of design?<br>

  • 2.2. Has cold creep protection being installed?

  • 2.3. Has the cable tray been labelled with cable tray stickers indicating weight per metre?

  • 2.4 Has all sharp edges been eliminated from tray and iron work

  • 2.5. Does the tray and superstructure meet TM 100 requirements

  • 2.6. Is all fixings, channel, threaded rod and accessories are passivated.

  • 2.7. Is the work area clean and safe?

  • 2.8. Compliant?

  • Comments!

  • Add media

2A.0. Batteries

  • 2A.01. Have the batteries been installed as per manufacture and Telstra requirements

  • 2A.02. All battery leads and links connection bolts/nuts been crossed indicating that they have been torqued twice

  • 2A.03. Battery post covers installed ensuring that there are are no exposed live parts?

  • 2A.04. All Battery cells labelled with the cell number of that battery string?

  • 2A.05. Battery books been left on site

  • 2A.06. Battery books have been fully filled out. This includes all battery information

  • 2A.07. 20 minute discharge or site load test recorded in battery books

  • 2A.08. Battery BMP rating matches the value on the installed pocket label

  • 2A.09 battery cabling installed neatly?

  • 2A.11. Is the area neat and clean?

  • 2A.12. Compliant?

  • Comments?

  • Add media

3.0. Power system

  • 3.1. Power system installed as per equipment layout drawing

  • 3.2. Power system labelled as per latest labelling manual

  • 3.3. Power system has no alarms present?

  • 3.4. Rectifiers installed match the design requirements

  • 3.5. Rectifiers positioned evenly across AC phases

  • 3.6. Power system rack isolated from iron work and any other IBN?

  • 3.7. AC supply had been installed according to AS 3000

  • 3.8. AC supply isolators labelled correctly

  • 3.9. SPC bar installed in an accessible location as close to the power system as possible?

  • 3.10. Pyrolam used on side and back of cabinet?

  • 3.11 Does the no load zone match the structural engineers report?

  • 3.12. Is the area clean and safe?

  • 3.13 Compliant?

  • Comments!

  • Add media

4.0 DC cabling

  • 4.1 The quantity of cable installed matches design.

  • 4.2. Is the cable route subject to crushing pressures or sharp edges?

  • 4.3. Does the cable route minimise bends and excessive tension?

  • 4.4. Is the cable suitably protected in exposed areas?

  • 4.5. Is the cable secured every 500mm in exposed areas?

  • 4.8. Compliant?

  • 4.7 All cable ties been cut flush with cable tie block to ensure no sharp edges are present?

  • Comments?

  • Add media

6.0. As built and commissioning.

  • 6.1. We're there any issues with the overall design?

  • 6.2. Have all the installation works been carried out to a high standard?

  • Comments?

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.