Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Pre cyclone season
-
Administration
-
Village layout diagrams every room Muster point / Cyclone shelter
-
Reception told to instruct guests when booking in of the basic procedure
-
Ensure reception is aware how to print occupancy reports and ensure copy of rosters prepared
-
Guests and staff updated of cyclone process, preparation plans and when a drill wil take place
-
Cyclone Drill complete
-
List of wardens set and personnel notified
-
Checklist of electrical equipment completed
-
6L of water per person allocation in dining room. (3l per day)
-
VV rooms to have 20L water in each unit
-
Cyclone meals at ready (2 x soup, 2 x Instant Noodles, 2 x Biscuits, 1 x Muesli Bar per pack)
-
Enough frozen crib available for cyclone packs (2 frozen meals per ack required)
-
Emergency lighting tests completed
-
General Maintenance inspection of shelter
-
General Maintenance inspection of all buildings and structres completed
-
General Maintenance inspection of shelter
-
Check drains, and storm waterways clear
-
Check first aid and emergency kits complete
-
Contact boat and trailer owners to set plan for removal off site in blue alert
-
Contact waste contractor to set plan for bins
-
General tidiness of site to high level
-
Loose materials tied down appropriately or moved indoors
-
Demo of shade sail removal completed
-
Check of all gates and doors to ensure ability to be locked shut
-
Ensure all service cupboards are securely latched and locked
-
All fire hoses are locked in position and in working order
-
Wrap cables around fans tight and cable tie
-
Spill kits full and ready
-
Strap grease/oil container to fence
-
VV pool cover secured to fence
Weekly Audit (To be conducted weekly once the pre cyclone audit has been closed out)
-
Can all items likekly to cause damage be secured
-
Are the cyclone kits fully stocked and all battery items in working order
-
Is tie down equipment available and in a suitable location
-
Is the emergency response manual printed and available in reception
-
Have all action items from the monthly grounds and HSE audits been closed out
-
Are all Cyclone shelter buildings and work areas of good housekeeping and general cleanliness
-
Have the generators been checked and ensured sufficient fuel levels
-
Have any new staff that missed the cyclone toolbox been contacted with the training material
Building
-
Building Inspection (To be completed by a registered builder)
Velocity Motel
-
Are all roofs (including gutters) in good condition and intact
-
Is all cladding (if applicable) in good condition and intact
-
Are stairs, steps, handrails, and landings in good condition and intact
-
Are all fittings and fixtures in serviceable order with no damages
-
Is the buildings exterior in constructional order and has good structural integrity
-
Are the windows in good condition and operational
VM2
-
Are all roofs (including gutters) in good condition and intact
-
Is all cladding (if applicable) in good condition and intact
-
Are stairs, steps, handrails, and landings in good condition and intact
-
Are all fittings and fixtures in serviceable order with no damages
-
Is the buildings exterior in constructional order and has good structural integrity
-
Are the windows in good condition and operational
Are all drains are clear and capable of handling storm water run off
-
Is the outside decking in good condition and intact
Velocity Village
-
Are all roofs (including gutters) in good condition and intact
-
Is all cladding (if applicable) in good condition and intact
-
Are stairs, steps, handrails, and landings in good condition and intact
-
Are all fittings and fixtures in serviceable order with no damages
-
Is the buildings exterior in constructional order and has good structural integrity
-
Are the windows in good condition and operational
Are all drains are clear and capable of handling storm water run off
-
Is the outside decking in good condition and intact
Maintenance Shed and Commercial Laundry
-
Are all roofs (including gutters) in good condition and intact
-
Are all fittings and fixtures in serviceable order with no damages
-
Is the buildings exterior in constructional order and has good structural integrity
Pool Areas
-
Is the fencing around the pool in good condition and secure