Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
General
-
Have all previous issues been actioned?
-
Have all employees/contractors completed environmental and cultural heritage inductions?
-
Are all environmental records completed and filed correctly?
-
Are all licences and permits current and complied with?
Flora and Fauna
-
Are the limits of clearing, areas of retained habitat and threatened plant locations clearly marked as "NO GO ZONES"?
-
Is all vegetation protection/exclusion zone fencing installed and in good condition?
-
Has all clearing and ground disturbance and access been restricted to within limits of clearing?
-
Are all construction water flows directed away towards silt basins?
-
Are all chemicals/fuel storage/wash down & concrete wash out areas clearly signed and in good condition?
Cultural Heritage
-
Are all cultural heritage exclusion zones clearly marked and exclusion fencing in good order?
Weeds and Pests
-
Have correctly completed weed hygiene forms been obtained for all vehicles, plant equipment, soils and mulch being used for this site?
-
Is a wash down bay available and in good working order?
-
Are wash down facilities for vehicles, plant and equipment located away from water courses and in good working order?
-
Have all weed infestations been identified and treated?
-
Has the landowner / council been notified of any pest animals on site?
Erosion and Sediment
-
Are all Silt control measures installed and in good working order as per the EMP?
-
Have all erosion and sediment risks been managed?
-
Are all ground surfaces and stockpiles not being worked stabilised with temporary cover?
-
Are sufficient standby Erosion control materials available?
-
Have revegetation works commenced in all available areas?
Water Quality Management
-
Is all clean water being diverted around work areas?
-
Is all runoff from construction areas directed to sediment basins or other treatment devices?
-
Are water bodies within/adjoining the site free of any visible sediment plumes, oil / chemicals?
-
Are works within waterways limited to the minimum feasible footprint?
-
Are all stockpiles, chemical / fuel storage, wash down areas located at least 50m from waterways within /adjoining the site?
Contaminated Land
-
Have any suspected areas of contamination land been investigated and managed?
Nuisance and Amenity
-
Are noise / vibration / dust levels limited to the minimum practical level?
-
Have all vehicles , plant and equipment been serviced and maintained to minimise noise and other emissions
-
Are all loads being transported to / from site being covered?
-
Is a watering truck / water supply readily available to control dust as required?
-
Are site compounds kept tidy?
-
Has any mud tracked onto public roads been cleaned up appropriately
Waste Management
-
Are sufficient waste / recycling bins available on site and regularly emptied?
-
Are wastes being stored and disposed of correctly (e.g. Recyclables in recycling bins, food waste bins sealed, regulated waste tracked)?
-
Are waste minimisation strategies being applied?
Chemicals and Fuels
-
Are bulk chemicals/ fuels stored in bounded areas?
-
Is a register and current MSDS readily available for all chemicals / fuels stored or used on site?
-
Are spill kits readily available at all locations being used for bulk storage or use of chemicals / fuels and stocked with sufficient / suitable materials?
-
Have all leaks / spills been controlled and contamination remidiated
Resource Use and Management
-
Has all construction water been sourced from sources other than natural water bodies and town drinking water supplies( e.g. Sediment basins)
-
Has electricity usage and fuel consumption been minimised as far as practicable?