Information
-
CSA
-
Job ID
-
Auditee name
-
Address
-
Conducted on
-
Auditor Name
-
Contractor Manager (CM)
Sign off information
-
Services & testing completed as required in service order memo
-
Network Locations where work was carried out has been recorded in sign off
-
Location where service was confirmed working
-
Records updated & match ICMS
3 Service Order
-
3.004 NTS test results OK (Techmate)
4 Codes
-
4.004 Correct Statement of Work codes used
5 Fault
-
5.009 Escalation procedure followed (Network improvement Form)
9 MDF
-
9.005 Jumper routing via frame guides
-
9.006 Jumper type correct (OR/WH) with required (200mm) slack left
-
9.008 Solder jumper terminations correct (wire strip & wrap, no excess solder)
37 Passive Copper Cabinet
-
37.008 Cabinet Jumper correct type (White/Blue)
-
37.009 Cabinet Jumper run correctly (50mm slack & no excess)
-
37.016 Locks & hinges OK (NIF Submitted for damage)
-
37.019 Cabinet Jumper terminated correctly
39 Aerial Terminal
-
39.002 Terminal mounted and secured correctly
-
39.004 Terminal lid secure
-
39.005 Terminal label on lid or plate on pole
40 Pillar Terminal
-
40.002 Pillar ID correct
-
40.003 Lid secure (2 screws)
-
40.005 Plastic bags installed & secure (2 bags/2 cable ties)
-
40.01 Correct connectors used
-
40.012 Service Lead labelled correctly
-
40.013 Unused pairs capped
-
40.016 Encapsulated loop resealed correctly
-
40.019 Service Lead - flying leads installed and correct
41 BDD Terminal
-
41.001 Pit lids secure/locked
-
41.003 Radi: Base & lid clean, O ring seated correctly, O ring replaced upon entry
-
41.004 O/J lid labelled
-
41.008 Plastic bags installed & secure
-
41.013 Service Lead labelled correctly
-
41.014 Unused pairs capped
-
41.016 Faulty connectors replaced (Green/Milky connectors must be replaced)
-
41.019 Service Lead - flying leads installed and correct
42 PDS Terminal
-
42.003 Lid secure
-
42.004 PDS network labelled correctly
-
42.008 Foam bung fitted
-
42.011 Service Lead labelled correctly
-
42.012 Service Lead terminated correctly
-
42.013 Unused pairs capped
43 Aerial Service Lead
-
43.001 Correct Service Lead used
-
43.003 Tension, sag and twist correct
-
43.004 Correct pole fittings used and installed (screw eyes, sash clamps)
-
43.013 Servi seal secured in upright position and Gel Snap secured horizontally
45 ETP
-
45.004 Aerial lead in to ETP correct eg termination hardware, position, tidy appearance
-
45.005 20mm pipe to ETP is white only
-
45.006 20mm pipe end (within ETP) is sealed with silicone and drainage holes left clear
-
45.008 Premise cabling exit from ETP is sealed with silicone
-
45.016 Unused pairs capped
General Task waste
-
73.024 Site Tidy, no task waste remaining