Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Project:
-
Work Activity:
-
Does the work involve working with Electricity?
-
Above the line controls observed/comments:
-
Can the work result in in a fall of more than 2 meters
-
Above the line controls observed/comments:
-
Does the work require persons to drive longer than 2 hours
-
Above the line controls observed/comments:
-
Are workers required to work in the vicinity of overhead/underground utilities?
-
Above the line controls observed/comments:
-
Does the work require persons to excavate deeper than 1.5 mteres?
-
Above the line controls observed/comments:
-
Is the worksite located in the vicinity of vehicular traffic?
-
Above the line controls observed/comments:
-
Are workers required to work in or around mobile plant?
-
Above the line controls observed/comments:
-
Are workers required to work in remote or isolated locations?
-
Above the line controls observed/comments:
-
Does work involve heavy lifting (>75% of SWL)
-
Above the line controls observed/comments:
-
Are workers exposed to asbestos?
-
Above the line controls observed/comments:
Environmental Impacts
-
Is noise/air pollution a consideration?
-
Is fire management a consideration?
-
Is vehical wash down a consideration?
-
Is cultural heritage a consideration?
-
Is waste management a consideration?
-
Is water pollution/sediment control a consideration?
-
Is vegitation clearance/reintatement a consideration?
-
Is access a consideration?
-
Is prescribed waste disposal a consideration?
-
Is spill management a consideration?
-
Is flora/fauna a consideration?
-
Is noxious weeds/insects a consideration?
General
-
Is a relevant SWMS/JSA current and available?
-
Were staff wearing PPE as identified in the hazard control plan?
-
Were any significant safety breaches observed?
-
What was the latest Telco Safety Essentials information received by the workforce?
-
Topics Discussed:
-
Comments/corrective actions required:
-
Person Completing Visit