Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Customer Service Area

  • Viscore/ Job Number

  • Responsible Manager

  • Auditee

  • Company

1.000 Design

  • 1.004 NetMAP ND0381 3 Network to be relinquished (in NetMAP) removed <br>

  • 1.006 NetMAP ND0381 3 Historical records impacted by new design rectified, connectivity & integrity ok. <br>

  • 1.010 Consents 3 Consents: Permits received, eg RMA, RON, Bridge etc. All Fees Paid <br>

  • 1.012 Financials 3 Work priced correctly using Template, FS codes / quotes as applicable. <br>

  • 1.018 Proactive Design 2 Hessian/known faulty cable along direct route of any lay/thrust considered for replacement. <br>

  • 1.019 Proactive Design 2 Replacement cables outside construction zone meet current Proactive Guidelines <br>

  • 1.020 Proactive Design 2 Any effecting multiples within joints being accessed are to be demultipled. <br>

  • 1.022 Costs 2 Billed tasks actually done <br>

2.000 Handover & Collateral Delivered to Chorus

  • 2.001 Procedure 5641 3 Handover procedure followed, WATCH form applied <br>

  • 2.002 Commissioning 5641 2 Commissioning information meets specified requirements <br>

  • 2.003 RFS and DDC 5641 1 Timing correct for RFS and DDC. Recommits meet business rules <br>

  • 2.004 Compliance Certificates 5641 1 Compliance certificates available (RMA, PTW, RON, TMP, Electrical) <br>

  • 2.005 Codes 2 Deployment codes & Template pricing applied correctly <br>

  • 2.006 Work Plan 4501 1 Work Plan / H&S /Technical Procedure / PTTN Accreditation approved / Access Card current <br>

  • 2.007 Spares 2 Spares visible and appropriate when required <br>

  • 2.008 Records Integrity 2 TLRD/NetMAP updated, integrity checked & confirmed <br>

  • 2.009 Records Integrity 2 Bearer connectivity confirmed "end to end" <br>

  • 2.010 Records Integrity 2 Graphical Records & Databases identified & updated <br>

  • 2.011 Records Integrity 2 ICMS updated <br>

  • 2.012 Records Integrity 2 Have transmission limits been met. (Wireline tool) <br>

  • 2.013 Records Integrity 2 Traid updated <br>

  • 2.014 Records Integrity 3 Does the NMR record match equipment on site. (NMR move/add/change captured and updated when appropriate). <br>

  • 2.015 Records Integrity 7388 2 OTDR traces (all cable fibres @ 1310 & 1550nm wavelength) confirmed delivered to Chorus <br>

  • 2.019 CNSP 2 <br>All network items defined within the Chorus Network Specified Product (CNSP) process are used in the network. No non approved items used<br>

  • 2.020 Records Integrity 3 Plant Damage Report (PDR) form completed <br>

  • 2.020 Records Integrity 3 Plant Damage Report (PDR) form completed <br>

  • 2.021 Records Integrity 2 Cable Network Alteration (CNA) form completed <br>

  • 2.022 Records Integrity 2 Cable Plant Alteration (CPA) forms completed <br>

4 Codes

  • 4.001 TFD 3 Correct TFD code used <br>

  • 4.002 CSE 3 Correct CSE code used <br>

  • 4.003 ACT 3 Correct ACT code used <br>

  • 4.004 Correct Statement of Work codes used

5 Fault

  • 5.001 NTS test result (Good Line)

  • 5.002 Records - Customer information & cable pairs correct, changes updated

  • 5.003 Any Pair change meets current rules

  • 5.004 OUT Fault Ticket text field completed - first name, surname initial, fault cause, fault resolution, location of repair incl. street no., name of end customer if contacted. If applicable: reason for uneconomic repair, billing information – S&S doc no., PDR no., NFF – NVF no.

  • 5.005 First Time Fix principles applied. Fault repaired but there was another service affecting issue that could have been fixed and wasn’t.

  • 5.009 Escalation procedure followed (Defect Referral)

  • 5.010 Desktop Check 2 <br>Spares levels maintained, faulty spares referred for repair, faulty card description accurate, local spares used replaced from national holdings.<br>

6.000 Work Areas & Safety

  • 6.001 Site 1 Personal and site safety procedures observed <br>

  • 6.002 Hazards 1 Hazards identified & recorded - Worksite audit form completed / Hazard Notices in place <br>

  • 6.003 Traffic 1 Transit TMP provided <br>

  • 6.004 Services 1 Services located <br>

  • 6.005 Clearances 1 Power and Gas clearances correct <br>

  • 6.006 Confined Space 1 Gas Detector - within current calibration certificate <br>

  • 6.007 Confined Space 1 Gas Detector - measures for O2, Flammable, Carbon Monoxide (& Hydrogen Sulphide in volcanic areas) <br>

  • 6.008 Network 2 Network security correct (Exchange) <br>

  • 6.009 Confined Space 2 Joint Chamber / Manhole lids closed and secure <br>

  • 6.012 Temporary Work 2 Temporary work clearly labelled and contains name, contact details, job ID of person involved. <br>

10 Pride & Logs

  • 10.002 MDF Log completed in exchange

  • 10.004 Cabinet 3 Cabinet Log completed <br>

13 Cable Haul (7476, 7475, 7474)

  • 13.001 Correct cable installed as per project pack

  • 13.002 Cable drum managed on site safely

  • 13.003 Correct duct used, always use adjacent duct at through manholes if possible

  • 13.004 Pulling in cable guide used

  • 13.005 Cable lubricated prior to pulling

  • 13.006 Is the winch capable of controlling haul tension within 2KN for fibre

  • 13.007 Ducts cleaned and tested

  • 13.008 Correct method used blow / suck

  • 13.009 Communication method adequate (H&S of staff)

  • 13.010 Cable Haul 7416 2 Subduct (to be used) cut correctly and reamed <br>

  • 13.011 Cable Haul 7416 2 Subducts in manholes/joint chambers managed/not obstructing manhole plant <br>

  • 13.012 Cable Haul 7416 2 Grouped PE subducts anchored at entry to MH <br>

  • 13.013 Cable Haul 7416 2 Spare PE subducts capped <br>

  • 13.014 Cable Haul 7416 3 Subduct with cables labelled <br>

  • 13.015 Cable Haul 7416 2 Correct subduct joiner used <br>

  • 13.016 Cable Haul 7416 2 ALL cable ends sealed with Heatshrink, coiled and secured ready for use <br>

  • 13.017 Cable Haul 7416 1 400pr cable and above pressurised (pre pull 70kpa/ post pull 70kpa) <br>

  • 13.018 Copper cable sufficient slack left for manhole management & jointing

  • 13.019 Cables identified / labelled

  • 13.02 Fibre cables at intermediate manholes secured with split PE subduct to MH wall

  • 13.021 MaxCell installation only between adjacent MH. MH working area not impeded

  • 13.022 Fibre cable prepared for joint correctly in manholes (cable management tidy to cable loop brackets)

  • 13.023 Manhole / joint chamber lids free of material / Bung in lifting hole / lid locked

  • 13.025 RMA: Contaminated manhole water collected for disposal

14 Cable Removal

  • 14.001 Correct cables identified

  • 14.002 Withdrawing method correct

  • 14.003 Cable recovered for disposal (Scrap process) correct

15 Cable & Duct Lay

  • 15.001 Duct 6471 2 Ducts laid or directional drilled at least 1000mm in State Highway <br>

  • 15.002 Duct 6471 2 Ducts laid or directional drilled between 450mm and 1000mm in footway <br>

  • 15.003 Duct 6471 2 Ducts laid or directional drilled between 600mm and 1000mm in roadway <br>

  • 15.004 Duct 6471 2 Duct alignment and configuration correct <br>

  • 15.005 Route position to plan

  • 15.006 Cable 6471 2 Correct cables identified and installed <br>

  • 15.007 Cable 6471 2 Cable ends sealed with heatshrink <br>

  • 15.008 Cable 6471 2 Warning tape installed <br>

  • 15.009 Cable 6471 2 Buried cable crossings - depth and protection <br>

  • 15.010 Cable 6471 2 Reduced cover - protection installed <br>

  • 15.015 Manhole / joint chamber lids free of material / Bung in lifting hole / lid locked

  • 15.016 Fibre 6471 2 Fibre Cable Installation: Metallic cable location cable installed <br>

  • 15.017 H&S 6471 2 Location cable separated into RLG pillars either side of fibre joint location (pillar minex applied) <br>

  • 15.018 Bridge 6471 2 Bridge crossing: Best on downstream side and conforms to consent specifications <br>

  • 15.019 Bridge 6471 1 Bridge crossing: Cable protection secure from bird/rodent access & extends into ground each side <br>

  • 15.020 Bridge 6471 2 <br>Bridge crossing: U channel, brackets, covers and pipe galvanised. All anchor bolts and fittings robust and secure<br>

  • 15.021 Cable 6471 2 Route markers installed (Rural only) <br>

  • 15.022 Fibre 6471 2 Rural: 1/2 round installation (fibre cable) each side of culvert/ drain crossings <br>

  • 15.023 Rural: 1/2 round installation for rural fibre joint location

  • 15.024 Customer 6471 2 Rural: Private property owner aware cable within property boundaries <br>

  • 15.026 Duct ND0545 2 <br>Duct at customer boundary for direct install fibre sealed and buried or housed in approved enclosure (eg Pedestal)<br>

17 Manhole & Joint Chamber Installation & Ducts

  • 17.001 Manhole preparation, bedding, backfill compacted OK

  • 17.002 Manhole sited correctly - To plan and parallel to B/L

  • 17.003 Manhole correctly sized as per Design Job Specification

  • 17.004 Manhole frames flush to ground, no trip hazard

  • 17.005 Manhole stripped of formwork, no protruding nails left

  • 17.006 Manhole throat (where fitted) correct diameter & does not obstruct access

  • 17.008 Concrete panel joints sealed to prevent silt and water ingress

  • 17.009 Manhole floor level, sump hole fitted

  • 17.01 All manhole duct entry grouted, duct reamed, sits flush to wall

  • 17.011 Non concrete joint chamber duct entry protrudes into chamber 50mm, reamed, sealed to wall

  • 17.012 Manhole cable management brackets installed to accept arms

  • 17.013 Manhole cable management arms installed as required

  • 17.014 Manhole / joint chamber lids are locked, in working order and rubber bung fitted

  • 17.015 Ducts entry positioned close to adjacent wall for easy cable management

  • 17.016 Ducts sealed where necessary to prevent the ingress of water, moisture, gas, pests into buildings and cabinets

  • 17.018 Duct 7414 2 Cable or sub duct entry sealed to Feeder Duct <br>

  • 17.019 Duct 7414 2 Cable exiting from sub duct sealed <br>

  • 17.020 Duct 7414 2 Unused Feeder Ducts plugged/sealed <br>

18 Manhole Cable Management

  • 18.001 All cables managed tidily on brackets and arms

  • 18.002 Fibre cable prepared for joint correctly in manholes (cable management tidy to cable loop brackets)

  • 18.003 Fibre cable protection when required-tread plate/split subduct/bandit tape

  • 18.004 Fibre closure secured to MH wall with bracket

  • 18.005 Pressurised cables and tails OK, no weak points of failure

20 Copper Cable Jointing

  • 20.001 Cables pressure maintained

  • 20.002 Cable at correct depth & sheath free from damage

  • 20.004 Cable excess length sufficient

  • 20.005 Correct jointing connectors & tool used

  • 20.006 Cable 2 Temporary closure adequate <br>

  • 20.008 No obstruction of spare ducts

  • 20.009 Duct 7411, 7414 2 Spare exchange ducts sealed where necessary to prevent the ingress of water, moisture, gas, pests <br>

21 Copper Heat shrink Closure (incl PEDCAP & Radi)

  • 21.001 Closure sized correct

  • 21.002 Cable entry prepared; Clean, Abrade, Flame Brush, alu foil

  • 21.003 Cable position at entry correct; largest on top

  • 21.004 Branch Clip or SCOP use correct

  • 21.005 Thermal colour change even, white line visible down SS channel

  • 21.006 Sufficient glue extruding at ends

  • 21.007 Pressurised closure has pressure valve fitted/test OK

  • 21.008 Closure management; manhole arms or direct buried has protective slab

23.000 Pressure

  • 23.001 Pressure 2 Air dryer location adequate with fresh air supply <br>

  • 23.002 Pressure 2 Air dryer not bolted to floor <br>

  • 23.003 Pressure 2 Polycor tubing & joints managed, no leaks evidenced <br>

  • 23.004 Pressure 2 Each cable on flow panel clearly labelled <br>

  • 23.005 Pressure 2 Humidity Alarm within boundaries <br>

  • 23.006 Pressure 2 Service manual available on site <br>

  • 23.007 Pressure 2 Main air block at cable well installation correct <br>

  • 23.008 Pressure 2 XTAP (air delivery to cable) install/size OK <br>

  • 23.009 Pressure 2 Air dryer alarms within boundaries (Check with NOC) <br>

  • 23.010 Pressure 2 Maximum 70kpa delivered at start of network <br>

  • 23.011 Pressure 2 Minimum 35kpa available at end of network <br>

  • 23.012 Pressure 2 Cable transducer location min 200mtr/max 600mtr apart <br>

  • 23.013 Records Integrity 3 ICMS updated with transducer cable pair details <br>

  • 23.014 Records Integrity 2 Chorus Master Pressure Database updated <br>

  • 23.015 Codes 2 Sign off codes (TFC 5B*) <br>

  • 23.016 PTW ND0479 2 Permit To Work <br>

  • 23.017 H&S HCP027 2 Dry Air Cylinder management OK (HCP027) <br>

24 SSA (7455 / 7517)

  • 24.001 SSA cable binding to hardware correct

  • 24.002 SSA cable erected correctly

  • 24.003 SSA cable type and size correct

  • 24.004 Earth 2 Earthing requirements (16mm/pipe/rod/C-Lok each end) correct when needed <br>

  • 24.005 SSA 2 End terminations and cable management correct <br>

  • 24.006 SSA 2 SSA tension & sag & twist (anti dancing) correct <br>

  • 24.008 SSA 3 Recovered wire or SSA uses scrap process <br>

25 Poles

  • 25.001 H&S 1 All mechanical aids in good working order, regular checks <br>

  • 25.002 H&S 1 Vehicle transporting poles must have racks for pole security <br>

  • 25.003 Pole in good condition, no splits, burs

  • 25.004 Pole manufacture label in place, Pole strength minimum 6kn

  • 25.005 Pole hole depth correct/Pole vertical and height correct

  • 25.006 Pole positioning and spacing correct, correct face position

  • 25.007 All new poles have Network pole tag installed 3mtr above ground

  • 25.008 Poles 2 Breast & Heal block position correct for pull & loading on pole <br>

  • 25.009 Reinstatement 2 Pole hole compacted every 150mm <br>

  • 25.01 Pole safe to climb (hammer/probe/dig)

  • 25.011 All metal plant hot dipped galvanised & CNSP approved

  • 25.012 Plant positioned correctly and safely, plant clearances correct

  • 25.013 Poles 2 Stub poles or staying lines or screw anchors installed correctly <br>

  • 25.014 H&S 1 Unsafe poles labelled / marked for replacement/7 days <br>

  • 25.015 H&S 1 Unsafe poles noted in Hazardous Pole Register <br>

  • 25.016 Records Integrity 2 Deeded poles shown in NetMAP Pole Editor <br>

  • 25.017 All tagged poles in NetMAP

  • 25.018 H&S 1 Traffic Management Plan for pole install/removal <br>

  • 25.021 Labels 2 Network labelling in place to suit requirements <br>

31 Active Cabinet Internal RHS

  • 31.001 Cabinet 2 Outer Door lock works smoothly and door closes without jamming <br>

  • 31.002 Door stays are in place and all work well

  • 31.004 Soft foam seal plate secured. Cable entry prevents vermin/insect entry.

  • 31.006 MDF; Correct Modules installed

  • 31.007 MDF; Module Labelling correct

  • 31.008 MDF; Data card for jumper running data (laminated or in a card holder attached to the inside of door)

  • 31.009 MDF; Cabinet E-side Termination data card in door.

  • 31.01 MDF; Jumper correct type (BL/WH)

  • 31.011 MDF; Jumper run correctly (50mm slack & no excess)

  • 31.016 Bottom LHS Earth bar strapped to each MDF vertical and the base of the cabinet

  • 31.020 MDF 2 MDF; Jumper terminated correctly <br>

  • 31.021 Security 2 Door seals in good condition <br>

  • 31.023 Reinstatement 3 MDF: All dead jumpers removed <br>

37 Passive Copper Cabinet

  • 37.001 Outer Door lock works smoothly and door closes without jamming

  • 37.002 Door stays are in place and all work well

  • 37.003 Cabling run correctly

  • 37.004 Distribution Frame: Correct Modules installed

  • 37.005 Distribution Frame: Module Labelling correct

  • 37.006 Distribution Frame: Data card (laminated or in a card holder attached to the inside of CCC door)

  • 37.007 Distribution Frame: Cabinet Laminated E-side Termination data card in door.

  • 37.008 MDF; Jumper correct type (BL/WH)

  • 37.009 MDF; Jumper run correctly (50mm slack & no excess)

  • 37.01 MDF: All dead jumpers removed

  • 37.011 Module support bars, separators and cover in place

  • 37.013 Lightning protection installed (when specified) or reinstated after testing

  • 37.014 All duct seals in place

  • 37.015 Concrete around ducts in base of cabinet

  • 37.016 Locks & hinges OK

  • 37.017 Door seals in good condition

  • 37.019 MDF 2 MDF; Jumper terminated correctly <br>

38.000 UFB Fibre Flexibility Point (FFP)

  • 38.001 Security 2 Outer Door lock works smoothly and door closes without jamming <br>

  • 38.002 Security 2 Door stays are in place and all work well <br>

  • 38.003 Cable 2 Cabling run correctly <br>

  • 38.004 OFDF 2 Distribution Frame: Correct Trays installed <br>

  • 38.005 Records Integrity 2 Distribution Frame: Drawer Labelling correct <br>

  • 38.006 Records Integrity 2 Distribution Frame: Data card inside of drawer <br>

  • 38.008 Earth 2 All microducts earth terminated <br>

  • 38.009 Earth 2 All microduct earths labelled <br>

  • 38.010 Security 2 All duct seals in place for cable entry (100mm) <br>

  • 38.011 Duct 2 Concrete around ducts in base of cabinet <br>

  • 38.012 Security 2 Locks & hinges OK <br>

  • 38.013 Security 2 Door seals in good condition <br>

  • 38.016 OFDF 2 Splitter installed and labelled <br>

  • 38.017 OFDF 1 All unused connectors capped <br>

  • 38.018 OFDF 2 Splitter leg parking bay <br>

  • 38.019 Cabinet 2 All micro ducts sealed <br>

  • 38.020 Cabinet 2 All micro ducts labelled <br>

  • 38.021 Cabinet 2 Fixed fibre strain relief installed <br>

39 Aerial Terminal

  • 39.001 Correct terminal used

  • 39.002 Terminal mounted and secured correctly

  • 39.003 Quiet Front terminal has sufficient gel

  • 39.004 Terminal lid secure

  • 39.005 Terminal label on lid or plate on pole

  • 39.006 Lead-in entry correct

  • 39.007 Lead-in terminated correctly

  • 39.008 Plastic bag on multi-pair lead-in cable unused pairs

  • 39.009 Cable shield installed

  • 39.010 Terminal 2 Non working pairs capped <br>

  • 39.011 Terminal 2 Sufficient slack length <br>

40 Pillar Terminal

  • 40.001 Pillar - vertical, firm, depth

  • 40.002 Pillar ID correct

  • 40.003 Lid secure

  • 40.004 Lead-in thru base only

  • 40.005 Plastic bags installed & secure

  • 40.006 Foam bung fitted

  • 40.007 Minimum sheath height 50mm (30mm if in concrete and/or uneconomic to repair, 80mm for V3)

  • 40.008 Coloured zip ties to 25 pair groups (not too tight)

  • 40.009 Correct cable used

  • 40.01 Correct connectors used

  • 40.011 Circuit dedicated

  • 40.012 Service Lead labelled correctly

  • 40.013 Unused pairs capped

  • 40.014 Damaged conductors repaired

  • 40.015 Faulty connectors replaced

  • 40.016 Encapsulated loop resealed correctly

  • 40.017 V3: Lead-in customer and network labels OK

  • 40.018 Green cable tie on exchange side

  • 40.019 Customer 2 Service Lead - flying leads installed and correct <br>

  • 40.020 Cable 3 Unused pairs connected through <br>

  • 40.021 Pillar 2 Connectors >50mm from ring cut <br>

41 BDD Terminal

  • 41.001 Pit lids secure/locked, with bung fitted where appropriate

  • 41.002 Pit installed correctly

  • 41.003 Radi: Base & lid clean, O ring seated correctly, O ring replaced upon entry

  • 41.004 O/J lid labelled

  • 41.005 Radi is correctly installed, thermal change and lead in

  • 41.006 2m loops at BDD pits

  • 41.007 2m insulated tail installed at last BDD

  • 41.008 Plastic bags installed & secure

  • 41.009 Coloured ties to 25 pair groups

  • 41.01 Correct cable used

  • 41.011 Correct connectors used

  • 41.012 Circuit dedicated

  • 41.013 Service Lead labelled correctly

  • 41.014 Unused pairs capped

  • 41.015 Damaged conductors repaired

  • 41.016 Faulty connectors replaced

  • 41.017 Cable 3 All cables, including lead-in cables, shall be zip-tied or taped together in a tidy loop within BDD pit. <br>

  • 41.018 BDD 2 Minimum sheath height 50mm <br>

  • 41.019 Customer 2 Service Lead - flying leads installed and correct <br>

  • 41.020 Cable 3 Unused pairs connected through <br>

  • 41.022 BDD 2 Connectors >50mm from ring cut <br>

42 PDS Terminal

  • 42.001 Pedestal - vertical, firm, depth

  • 42.002 Correct size pedestal used

  • 42.003 Lid secure

  • 42.004 PDS network labelled correctly

  • 42.005 Designed pair arrangement correct

  • 42.006 QF terminal labelling correct

  • 42.007 QF terminal secured to backing plate

  • 42.008 Foam bung fitted

  • 42.009 Adequate gel in quiet front

  • 42.01 Service Leads installed correctly

  • 42.011 Service Lead labelled correctly

  • 42.012 Customer 2 Service Lead terminated correctly <br>

  • 42.013 PDS 3 Unused pairs capped <br>

43 Aerial Service Lead

  • 43.001 Correct Service Lead used

  • 43.002 No In span joints

  • 43.003 Tension, sag and twist correct

  • 43.004 Correct pole fittings used and installed (screw eyes, sash clamps)

  • 43.005 Lead-ins enter terminal correctly

  • 43.006 White pipe down poles

  • 43.007 600mm saddle spacing or 1500mm bandit spacing

  • 43.008 Roadway crossing min 5.5m height, elsewhere 4.25 metre height

  • 43.009 Loops on poles tied

  • 43.011 Lightning protection runs >500 metres

  • 43.012 Correct building fittings used (screw eyes, sash clamps)

  • 43.013 Pole 2 Servi seal secured in upright position and Gel Snap secured horizontally <br>

  • 43.014 Service Lead 3 Unused pairs capped <br>

44 Buried Service Lead

  • 44.001 Service Lead terminated correctly

  • 44.002 20mm pipe connected at Pedestal correctly - (bend into pedestal)

  • 44.003 20mm pipe connected at BDD correctly (50mm into BDD pit, 450mm deep)

  • 44.004 20mm pipe connected at RLG correctly (at base of DP, bend if room)

  • 44.005 Individual pipe & cable for installs of <100 metre

  • 44.006 Direct buried cable option (no pipe) for > 100 metre

  • 44.007 Green 20mm installed in trench

  • 44.008 White pipe above ground level

  • 44.009 Depth correct (450mm cover)

  • 44.01 Power/ Gas clearances correct

  • 44.011 Cable & pipe repair correct

  • 44.013 Pipe connected at ETP correctly (not glued)

  • 44.014 Overlay of Service Lead justified

  • 44.015 Customer 2 Service Lead labelled correctly <br>

45 ETP

  • 45.001 ETP physical alignment correct, all fittings secure, installation tidy

  • 45.002 ETP location: (buried lead in-300-1500mm) (AE lead in on facia/under eaves)

  • 45.003 ETP recessed (within cladding) location: 900-1500mm

  • 45.004 Aerial lead in to ETP correct eg termination hardware, position, tidy appearance

  • 45.005 20mm pipe to ETP is white only

  • 45.006 20mm pipe end (within ETP) is sealed with silicone and drainage holes left clear

  • 45.007 Premise cabling exit via back of ETP

  • 45.008 Premise cabling exit from ETP is sealed with silicone

  • 45.009 All connections via gel filled connectors

  • 45.010 ETP 1 Protected ETP: Lightning arrestors fitted in areas that require protection <br>

  • 45.011 ETP 1 Protected ETP: Earth wire (6mm/green coating) 100mm min. bend radius observed <br>

  • 45.012 ETP 1 Protected ETP: Earth wire kept straight to Copper or Stainless Steel Earth rod <br>

  • 45.013 ETP 1 Protected ETP: Earth wire connection to earth rod with C-Lok product only <br>

  • 45.016 ETP 2 Unused pairs capped <br>

51.000 Open Aerial

  • 51.001 H&S 1 Safety precautions (traffic mgmnt, ladders, belts, ropes, heaving lines <br>

  • 51.002 H&S 1 Poles tested, firm & secure <br>

  • 51.003 Open Aerial 2 Aerial wires regulated correctly <br>

  • 51.004 Open Aerial 2 Open aerial terminations and bindings correct <br>

  • 51.005 Open Aerial 2 Supporting hardware in good condition <br>

  • 51.006 Open Aerial 2 Supporting arms in good condition <br>

72.000 Reinstatement

  • 72.001 Work areas and safety 2 Property damage made good <br>

  • 72.002 Poles 2 Ground reinstatement completed around poles <br>

  • 72.003 Buried Service Lead 2 Reinstatement/ backfill satisfactory around Buried Service Lead <br>

  • 72.006 H&S 1 Concrete surround flush with footpath or surrounding ground, no trip hazard <br>

  • 72.007 Reinstatement 3 Excess vegetation removed <br>

  • 72.011 Cable Haul 2 Reinstatement appropriate around cable haul <br>

  • 72.018 Reinstatement 2 Ground reinstatement completed <br>

  • 72.019 Reinstatement 6471 2 Backfill compacted every 150mm <br>

  • 72.020 Reinstatement 6471 3 Surplus soil removed <br>

  • 72.021 Reinstatement 6471 2 Reseal completed - Footway / vehicle resurfaced <br>

  • 72.022 Reinstatement 6471 2 Grass reinstated and replanted <br>

  • 72.023 Manholes 2 Ground reinstatement completed around manholes <br>

  • 72.024 SSA 2 Ground reinstatement completed - SSA <br>

73.000 Site tidy

  • 73.001 Poles 2 Site tidy, no task waste - poles <br>

  • 73.002 Cabinet Internal 2 Site tidy, no task waste - Cabinet internal <br>

  • 73.003 Aerial Terminal 2 Site tidy, no task waste - Aerial Terminal <br>

  • 73.004 Pillar Terminal 2 Site tidy, no task waste - Pillar Terminal <br>

  • 73.005 BDD Terminal 2 Site tidy, no task waste - BDD Terminal <br>

  • 73.006 PDS Terminal 2 Site tidy, no task waste - PDS Terminal <br>

  • 73.007 Aerial Service Lead 2 Site tidy, no task waste - Aerial Service Lead <br>

  • 73.008 Buried Service Lead 2 Site tidy, no task waste - Buried Service Lead <br>

  • 73.009 ETP 2 Site tidy, no task waste - ETP <br>

  • 73.019 Cable & Duct Lay 2 Site tidy, no task waste - Cable & Duct Lay <br>

  • 73.020 Manholes 2 Site tidy, no task waste - Manholes <br>

  • 73.021 SSA 2 Site tidy, no task waste - SSA <br>

  • 73.024 Site tidy 2 Site tidy, no task waste - general

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.