Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Customer Service Area
-
Viscore/ Job Number
-
Responsible Manager
-
Auditee
-
Company
2 Handover & Collateral Delivered to Chorus
-
2.020 Plant Damage Report (PDR) form completed
-
2.21 cable network alteration (CNA) form completed
-
2.022 cable plant alteration (CPA) forms completed
4 Codes
-
4.001 Correct TFD code used (888 used for customer chargeable fault)
-
4.002 Correct CSE code used
-
4.003 Correct ACT codew used
-
4.004 Correct Statement of Work codes used
5 Fault
-
5.001 NTS test result (Good Line)
-
5.002 Records - Customer information & cable pairs correct, changes updated
-
5.003 Any Pair change meets current rules
-
5.004 OUT Fault Ticket text field completed - first name, surname initial, fault cause, fault resolution, location of repair incl. street no., name of end customer if contacted. If applicable: reason for uneconomic repair, billing information S&S doc no., PDR no., NFF NVF no.
-
5.005 First Time Fix principles applied. Fault repaired but there was another service affecting issue that could have been fixed and wasnt.
-
5.007 Fault diagnosis fee charged if damage outside telecom network or responsibility
-
5.009 Escalation procedure followed (Defect Referral)
-
5.010 Spare levels maintained, faulty spares referred for repair, faulty card description accurate, local spares used replaced from national holdings
6.000 Work areas & safety
-
6.001 personal and site safety procedures observed
-
6.002 Hazards identified & recorded - worksite audit form completed / hazard notices in place
-
6.003 Transit TMP provided
-
6.004 Services located
-
6.005 Power and gas clearances correct
-
6.006 Gas detector - within current calibration certificate
-
6.007 Gas detector - measures for O2, Flammable <br>,Carbon monoxide ( & hydrogen sulphide in volcanic areas)
-
6.008 Network security correct (Exchange)
-
6.009 Joint chamber / Manhole lids closed and secure
-
6.012 Temporary work clearly labelled and contains name, contact details, job ID of person involved
9 MDF (7535, NDF-100A, NDF-100B, ND0066)
-
9.001 MDF Block secure (installation, earthing)
-
9.002 MDF Block Labelling correct (Cable Number, Pair range)
-
9.003 MDF Area cable entry duct sealed
-
9.005 Jumper routing via frame guides
-
9.006 Jumper type correct (OR/WH) with required (175mm - 225mm) slack left
-
9.007 IDC jumper terminations correct (full insertion to IDC, excess trimmed)
-
9.008 Solder jumper terminations correct (wire strip & wrap, no excess solder)
-
9.009 Old jumpers removed
-
9.01 Lightning protection (where fitted) earth to common earth
-
9.011 Cable pair records updated
-
9.012 Sign off codes correct (specify here)
10 Pride & Logs
-
10.002 MDF Log completed in exchange
-
10.003 Equipment room log completed in exchange
-
10.004 Cabinet log completed
20 Copper Cable Jointing
-
20.001 Cables pressure maintained
-
20.002 Cable at correct depth & sheath free from damage
-
20.003 Earth continuity maintained, as required
-
20.004 Cable excess length sufficient
-
20.005 Correct jointing connectors & tool used
-
20.006 Temporary closure adequate
-
20.008 No obstruction of spare ducts
-
20.009 Spare exchange ducts sealed where necessary to prevent the ingress of water, moisture , gas , pests
21 Copper Heat shrink Closure (incl PEDCAP & Radi)
-
21.001 Closure sized correct
-
21.002 Cable entry prepared; Clean, Abrade, Flame Brush, alu foil
-
21.003 Cable position at entry correct; largest on top
-
21.004 Branch Clip or SCOP use correct
-
21.005 Thermal colour change even, white line visible down SS channel
-
21.006 Sufficient glue extruding at ends
-
21.007 Pressurised closure has pressure valve fitted/test OK
-
21.008 Closure management; manhole arms or direct buried has protective slab
24.000 SSA
-
24.001 SSA cable binding to hardware correct
-
24.002 SSA cable erected correctly
-
24.003 SSA cable type and size correct
-
24.004 Earthing requirements (16mm/pipe/rod/C-Lok each end) correct when needed
-
24.005 End termination and cable management correct
-
24.006 SSA tension & sag & twist (anti dancing) correct
-
24.008 Recovered wire or SSA uses scrap process
25 Poles
-
25.001 All mechanical aids in good working order, regular checks
-
25.002 Vehicle transporting poles must have racks for pole security
-
25.003 Pole in good condition, no splits, burs
-
25.004 Pole manufacture label in place, Pole strength minimum 6kn
-
25.005 Pole hole depth correct/Pole vertical and height correct
-
25.006 Pole positioning and spacing correct, correct face position
-
25.007 All new poles have Network pole tag installed 3mtr above ground
-
25.008 Breast & Heal block position correct for pull & loading on pole
-
25.009 Pole hole compacted every 150mm
-
25.01 Pole safe to climb (hammer/probe/dig)
-
25.011 All metal plant hot dipped galvanised & CNSP approved
-
25.012 Plant positioned correctly and safely, plant clearances correct
-
25.013 Stub poles or staying lines or screw anchors installed correctly
-
25.014 Unsafe poles labelled / marked for replacement/ 7 days
-
25.015 Unsafe poles noted in hazardous pole register
-
25.016 Deeded poles shown in netMap pole editor
-
25.017 All tagged poles in NetMap
-
25.018 Traffic management plan for pole install/removal
-
25.021 Network labelling in place to suit requirements
26 Cable Markout
-
26.020 High load escort: All network plant reinstated to current standards
-
26.021 Plant Damage reports: Damage repaired
-
26.022 Plant Damage reports: Report signed by service company Field Manager
-
26.023 Plant damage reports : report filled out entirely
-
26.024 Plant damage reports : damage repaired
-
26.025 Plant damage reports : report signed by service company field manager
-
26.026 Plant damage reports : faxed to NPG within 48 hrs of completion of repair , copied to local chorus delivery specialist
31 Active Cabinet Internal RHS
-
31.001 Outer door lock works smoothly and door closes without jamming
-
31.002 Door stays are in place and all work well
-
31.004 Soft foam seal plate secured. Cable entry prevents vermin/insect entry.
-
31.006 MDF; Correct Modules installed
-
31.007 MDF; Module Labelling correct
-
31.008 MDF; Data card for jumper running data (laminated or in a card holder attached to the inside of door)
-
31.009 MDF; Cabinet E-side Termination data card in door.
-
31.01 MDF; Jumper correct type (BL/WH)
-
31.011 MDF; Jumper run correctly (50mm slack & no excess)
-
31.016 Bottom LHS Earth bar strapped to each MDF vertical and the base of the cabinet
-
31.020 MDF; Jumper terminated correctly
-
31.021 Door seals in good condition
-
31.023 MDF: All dead jumpers removed
37 Passive Copper Cabinet
-
37.001 Outer Door lock works smoothly and door closes without jamming
-
37.002 Door stays are in place and all work well
-
37.003 Cabling run correctly
-
37.004 Distribution Frame: Correct Modules installed
-
37.005 Distribution Frame: Module Labelling correct
-
37.006 Distribution Frame: Data card (laminated or in a card holder attached to the inside of CCC door)
-
37.007 Distribution Frame: Cabinet Laminated E-side Termination data card in door.
-
37.008 MDF; Jumper correct type (BL/WH)
-
37.009 MDF; Jumper run correctly (50mm slack & no excess)
-
37.01 MDF: All dead jumpers removed
-
37.011 Module support bars, separators and cover in place
-
37.013 Lightning protection installed (when specified) or reinstated after testing
-
37.014 All duct seals in place
-
37.015 Concrete around ducts in base of cabinet
-
37.016 Locks & hinges OK
-
37.017 Door seals in good condition
-
37.019 MDF; Jumper terminated correctly
38.000 UFB Fibre Flexibility Point (FFP)
-
38.001 Outer door lock works smoothly and door closes without jamming
-
38.002 Door stays are in place and all work well
-
38.003 Cabling run correctly
-
38.004 Distribution Frame: correct trays installed
-
38.005 Distribution Frame: Drawer labelling correct
-
38.006 Distribution Frame: Data card inside of drawer
-
38.008 All micro ducts earth terminated
-
38.009 All micro ducts earths labelled
-
38.010 All ducts seals in place for cable entry ( 100mm )
-
38.011 Concrete around ducts in base of cabinet
-
38.012 Locks & hinges OK
-
38.013 Door seals in good condition
-
38.016 Splitter installed and labelled
-
38.017 All unused connectors capped
-
38.018 Splitter leg parking bay
-
38.019 All micro ducts sealed
-
38.020 All micro ducts labelled
-
38.021 Fixed fibre strain relief installed
39 Aerial Terminal
-
39.001 Correct terminal used
-
39.002 Terminal mounted and secured correctly
-
39.003 Quiet front terminal has sufficient gel
-
39.004 Terminal lid secure
-
39.005 Terminal label on lid or plate on pole
-
39.006 Lead-in entry correct
-
39.007 Lead-in terminated correctly
-
39.008 Plastic bag on multi -pair lead in cable unused pairs
-
39.009 Cable shield installed
-
30.010 Non working pairs capped
-
39.011 Sufficient slack length
40 Pillar Terminal
-
40.001 Pillar - vertical, firm, depth
-
40.002 Pillar ID correct
-
40.003 Lid secure
-
40.004 Lead-in thru base only
-
40.005 Plastic bags installed & secure
-
40.006 Foam bung fitted
-
40.007 Minimum sheath height 50mm (30mm if in concrete and/or uneconomic to repair, 80mm for V3)
-
40.008 Coloured zip ties to 25 pair groups (not too tight)
-
40.009 Correct cable used
-
40.01 Correct connectors used
-
40.011 Circuit dedicated
-
40.012 Service Lead labelled correctly
-
40.013 Unused pairs capped
-
40.014 Damaged conductors repaired
-
40.015 Faulty connectors replaced
-
40.016 Encapsulated loop resealed correctly
-
40.017 V3: Lead-in customer and network labels OK
-
40.018 Green cable tie on exchange side
-
40.019 Service Lead - flying leads installed and correct
-
40.020 Unused pairs connected through
-
40.021 Connectors >50mm from ring cut
41 BDD Terminal
-
41.001 Pit lids secure/locked, with bung fitted where appropriate
-
41.002 Pit installed correctly
-
41.003 Radi: Base & lid clean, O ring seated correctly, O ring replaced upon entry
-
41.004 O/J lid labelled
-
41.005 Radi is correctly installed, thermal change and lead in
-
41.006 2m loops at BDD pits
-
41.007 2m insulated tail installed at last BDD
-
41.008 Plastic bags installed & secure
-
41.009 Coloured ties to 25 pair groups
-
41.01 Correct cable used
-
41.011 Correct connectors used
-
41.012 Circuit dedicated
-
41.013 Service Lead labelled correctly
-
41.014 Unused pairs capped
-
41.015 Damaged conductors repaired
-
41.016 Faulty connectors replaced
-
41.017 All cables, including lead in cables, shall be zip tied or taped together in a tidy loop BDD pit.
-
41.018 Minimum sheath height 50mm
-
41.019 Service lead - flying leads installed and correct
-
41.020 Unused pairs connected through
-
41.022 Connectors > 50mm from ring cut
42 PDS Terminal
-
42.001 Pedestal - vertical, firm, depth
-
42.002 Correct size pedestal used
-
42.003 Lid secure
-
42.004 PDS network labelled correctly
-
42.006 QF terminal labelling correct
-
42.007 QF terminal secured to backing plate
-
42.008 Foam bung fitted
-
42.009 Adequate gel in quiet front
-
42.01 Service Leads installed correctly
-
42.011 Service Lead labelled correctly
-
42.012 Service lead terminated correctly
-
42.013 Unused pairs capped
43 Aerial Service Lead
-
43.001 Correct Service Lead used
-
43.002 No In span joints
-
43.003 Tension, sag and twist correct
-
43.004 Correct pole fittings used and installed (screw eyes, sash clamps)
-
43.005 Lead-ins enter terminal correctly
-
43.006 White pipe down poles
-
43.007 600mm saddle spacing or 1500mm bandit spacing
-
43.008 Roadway crossing min 5.5m height, elsewhere 4.25 metre height
-
43.009 Loops on poles tied
-
43.010 Existing double "D" (OA501) or OA 45 replaced if altered
-
43.011 Lighting protection runs > 500 meters
-
43.012 Correct building fittings used (screw eyes, sash clamps)
-
43.013 Servi seal secured in upright position and gel snap secured horizontally
-
43.014 Unused pairs capped
44 Buried Service Lead
-
44.001 Service Lead terminated correctly
-
44.002 20mm pipe connected at Pedestal correctly - (bend into pedestal)
-
44.003 20mm pipe connected at BDD correctly (50mm into BDD pit, 450mm deep)
-
44.004 20mm pipe connected at RLG correctly (at base of DP, bend if room)
-
44.005 Individual pipe & cable for installs of <100 metre
-
44.006 Direct buried cable option (no pipe) for > 100 metre
-
44.007 Green 20mm installed in trench
-
44.008 White pipe above ground level
-
44.009 Depth correct (450mm cover)
-
44.01 Power/ Gas clearances correct
-
44.011 Cable & pipe repair correct
-
44.013 Pipe connected at ETP correctly (not glued)
-
44.014 Overlay of Service Lead justified
-
44.015 Service lead labelled correctly
45 ETP
-
45.001 ETP physical alignment correct, all fittings secure, installation tidy
-
45.002 ETP location: (buried lead in-300-1500mm) (AE lead in on facia/under eaves)
-
45.003 ETP recessed (within cladding ) location : 900 - 1500mm
-
45.004 Aerial lead in to ETP correct eg termination hardware, position, tidy appearance
-
45.005 20mm pipe to ETP is white only
-
45.006 20mm pipe end (within ETP) is sealed with silicone and drainage holes left clear
-
45.007 Premise cabling exit via back of ETP
-
45.008 Premise cabling exit from ETP is sealed with silicone
-
45.009 All connections via gel filled connectors
-
45.010 Protected ETP : Lightning arresters fitted in areas that requires protection
-
45.011 Protected ETP : Earth wire (6mm/green coating) 100mm min. Bend radius observed
-
45.012 Protected ETP: Earth wire kept straight to copper or stainless steel earth
-
45.013 Protected ETP: Earth wire connection to earth rod with C-Lok product only
-
45.016 unused pairs capped
46.000 Customer Premises 46.000
-
46.001 Correct cable used (cat 5 minimum - star wiring)
-
46.002 Correct pairs in cable used
-
46.003 Correct clearance observed
-
46.004 Wiring route acceptable and cable safe and secure
-
46.005 No under floors joints
-
46.006 Exposed surface wiring neat and tidy
-
46.007 Jack point hardware installed correctly
-
46.008 Jack points not installed in damp areas
-
46.009 Jack points at least 300mm above floor
-
46.010 2 wire jack system used
-
46.011 Installation date written inside jack point
-
46.012 Cable sheath clear of circuit board
-
46.013 CPE label installed
-
46.014 Contractor appearance / manner / service completion card left (customer view)
49.0000 Sales & Service Advice note
-
49.001 Completion time and date filled in
-
49.002 Service order number correct
-
49.003 Customer details correct
-
49.004 Service required details correct
-
49.005 Additional services provided are clearly recorded
-
49.006 Customer acknowledged with name and signature (or reason for no customer signature included)
-
49.007 S/O type correct
-
49.009 Service person name
-
49.010 Correct billing codes claimed
-
49.011 Phone / circuit number correct
-
49.012 CSA correct
-
49.013 Network elements where work was carried out are recorded
-
49.015 Location service confirmed at
51 Open Aerial
-
51.001 Safety precautions ( traffic mgmt, ladders, belts, ropes, heaving lines)
-
51.002 Poles tested, firm & secure
-
51.003 Aerial wires regulated correctly
-
51.004 Open aerial terminations and bindings correct
-
51.005 Supporting hardware in good condition
-
51.006 Supporting arms in good condition
53 TNT/TNF (Building Frames)
-
53.001 TNF or TNT installed correctly
-
53.002 Disconnection block installed correctly
-
53.003 Earthing requirements met
-
53.004 Demarcation point installed correctly
-
53.005 TNF/TNT Labelled correctly
-
53.006 TNT/TNF additional warning label installed NDF-151
-
53.007 Jumper routing via frame guides
-
53.008 Jumper type correct ( OR/ WH) with required slack left
-
53.009 Solder jumper terminations correct (wire strip & wrap, no excess solder )
-
53.010 Old jumpers removed
-
53.011 Site tidy, no task waste
58.000 2 Meg
-
58.001 Job packs have all relevant information for the task in hand
-
58.002 Permits held, and show dates, timings and correct task codes
-
58.003 TLRD updated , integrity checked & confirmed
-
58.007 Traid updated
-
58.010 correct DF jumper ( 5 wire) used
-
58.011 Jumper mgmt correct with required (200mm) slack left
-
58.012 DF components secure & labelled
72.000 Reinstatement
-
72.001 Property damage made good
-
72.002 Ground reinstatement completed around poles
-
72.003 Reinstatement / backfill satisfactory around buried service lead
-
72.007 Excess vegetation removed
-
72.018 Ground reinstatement completed
-
72.024 Ground reinstatement completed -SSA
73.000 Site tidy
-
73.001 Site tidy, no task waste - poles
-
73.002 Site tidy, no task waste - Cabinet internal
-
73.003 Site tidy, no task waste - Aerial terminal
-
73.004 Site tidy, no task waste - Pillar terminal
-
73.005 Site tidy, no task waste - BDD terminal
-
73.006 Site tidy, no task waste - PDS terminal
-
73.007 Site tidy, no task waste - Aerial service lead
-
73.008 Site tidy, no task waste - Buried service lead
-
73.009 Site tidy, no task waste - ETP
-
73.010 Site tidy, no task waste - Customer premises
-
73.017 Site tidy, no task waste - MDF
-
73.021 Site tidy, no task waste - SSA
-
73.024 Site tidy, no task waste - general