Information
Domestic Housing Site Safety Audit
-
Site Address
-
Conducted on
-
Prepared by
-
Location
-
Construction type
- Single Storey
- Double Storey
- Multi Unit Development
-
Construction Phase
- Initial Site Set up
- Site Cut
- Underground Services
- Slab Set out
- Slab Pour
- Frame Delivery
- Framing
- Facia & Gutter
- Roofing
- Solar Panel
- Antenna
- Hand Rail install/removal
- Scaffolding install/removal
- Hanging Platform install/removal
- Fall protection install/removal
- Foil Install
- Insulation Install
- Bricklaying
- Rendering
- Hebal Panel Install
- Cladding Install
- Electrical Rough in
- Electrical Fit off
- Plumbing Rough in
- Plumbing Fit off
- Plaster Hang
- Plaster Stop
- Plaster finish
- Internal fix
- Lock up
- Void Protection install/removal
- Painiting
- Tiling
- Balustrade Installtion
- Site Clean
- Carpet Install
- Test & Tag
- Concreting
- Landscaping
- Water Tank Install
-
Contractors/Suppliers On-site
- Temp Fencing
- Site Cut - Earthworks
- Underground services
- Concreter Slab
- Framer
- Facia & Gutter
- Roofing
- Antenna
- Solar Panel
- Solar Heating
- Electrical
- Plumbing
- Foil Wrap
- Insulation
- Bricklayer
- Cladding
- Scaffolders
- Lockup Carpenter
- Plasterers
- Internal fix carpenter
- Painter
- Water Proofer
- Tiler
- Carpet Layer
- Site Cleaner
- House Cleaner
- Telecommuncations
- Toilets & Cage
- Skip Bin
- Delivery from supplier
- No Contractors on Site
-
Comments
-
Add Photo
1. Site Information & Procedures
-
Is the correct signage visibly displayed & details completed (e.g.. Keep out sign, Contractor requirements and Builders Site sign with lot number)?<br>
-
Are identified site specific hazards mentioned on the site sign e.g.: overhead power lines, Gas lines, open trenches etc…. (has it been updated)<br><br>
-
Are all works where fall from heights is a risk adequately controlled?<br><br>
-
Are site fall hazards (e.g. retaining walls) controlled and identified on site sign or SWMS? <br>
-
comments
-
Add Photo
2. Trades
-
Have all persons on site completed an induction (check that all people on site have signed the sign in book/ or company induction booklet)<br><br>
-
Has the contractor/supplier completed a pre-start check hazard ID of the site?<br><br>
-
Do trades/suppliers on site, have a SWMS and Is the trade operating in accordance with their SWMS?<br><br>
-
Does the trade have an adequate first aid kit and is first aid trained?<br><br>
-
Are trades working sun smart?<br><br>
-
comments
-
Add Photo
Plasterers
-
All working at height risks managed for plaster delivery, eg: team lift via internal void, crane lift from external window/doors, plaster lifter in use. <br><br>
-
Where stilts are used, is area clean and free from trip hazards with a seat readily available.<br>
-
Internal housekeeping maintained during hang and stop up<br><br>
-
Does all sanding equipment have adequate dust control measure in place, and are personal using appropriate PPE eg: Dust mask, eye protection... <br>
-
Comments
-
Add Photo
3 Site Conditions/Housekeeping
-
Cross over appropriately installed and maintained(if required)<br><br>
-
Is the site "trade ready" (ie: has the last trade left completed all housekeeping so the next trade can commence their task)<br>
-
Perimeter fencing appropriately installed and maintained (No missing panels/Gates closed)?<br><br>
-
Slab Back fill completed (Level ground and stable)<br><br>
-
Clear access to front door, toilet, power board & bin/cage (is their a 1m clear zone around the build)<br>
-
Clean interior<br>
-
Are the driveways, footpaths, and nature strips clear of materials.<br>
-
Is the toilet clean accessible and in correct operating condition with toilet paper. <br>
-
Date of last clean
-
Comments
-
Add Photo
Environment & Sustainability
-
Is mud control ie: crushed rock/ recycled mix/ mulch, required on site, as an adequate amount been ordered or does it require a top up.<br>
-
Are the building spoils separated into allocated piles. Eg: Timber, Plaster, Brick and blow away material in cage/bin.<br><br>
-
Is the site bin/cage provided, accessible and not overflowing ?<br><br>
-
Is their adequate silt control on site, eg: Wash up pit, silt barrier, silt socks/sausages, brick barrier for sand.<br>
-
Is noise control adequately managed on site to minimise impact to neighbours and ensure site comms eg: radios, start times, generators, plant equipment<br><br>
-
Comments
-
Add Photo
4. Hanging Bracket Scaffold & Working @ Heights (For Modular Scaffold refer to specific audit tool))
-
Scaffold has identified access and egress points.<br>
-
Is the scaffold certificate in place and signed off (e.g.. Scaff tag)?<br>
-
Are the mid rails, top rails and lap boards of the scaffold in place?<br>
-
Are scaffold decks clear of debris?<br>
-
Comments
-
Add Photo
Void Protection (High Risk)
-
Is void protection in place with compliance certificate (note the void protection is to be installed prior to installation of 1st floor walls and flooring)? <br>
-
Is the void trap door/cover down whilst works occurring on 1st floor<br>
-
Comments
-
Add Photo
Roof Guard Rail - Condition & Access
-
Is there a barricaded drop zone for roof tilers spoils<br>
-
Will the roof work endanger any people below?<br>
-
Roof guard railing is place for all roof work?<br><br>
-
Roof guard rail has identified access points with self closing gates minimum of two <br>
-
The balcony guard rail is in place for all balcony works.<br><br>
-
Do all openings above 2m have guard railing e.g. windows, balcony openings(stair Risers have hand rails)? <br>
-
Does the balcony and alfresco have sufficient structural support? (eg: structural posts or accrow props for temp support)<br><br>
-
Do all works near an open edge have sufficient guard rail height ?<br>
-
Comments
-
Add Photo
Trestles
-
External/internal, are they fully planked, less than 2m in height, have solid stable footings, safe access/egress and a clear fall zone, correct locking pins<br><br>
-
Comments
-
Add Photo
Ladders (High Risk)
-
Extension Ladders in good condition no damaged rungs, are set up no greater than 1:4 vertical ratio?<br><br>
-
Ladders secure/tied off/ when accessing heights ladders extend 900mm past roof line?<br><br>
-
All types of ladders must be minimum Industrial grade rated at a minimum 120kgs? <br>
-
Step/platform ladder fully open, both stays in good condition and on stable ground<br>
-
Are trades working off step ladders safely, eg: not standing on top step and not over reaching to complete task. (platform ladders recommended)<br>
-
Comments
-
Add Photo
5. Dangerous Goods & Hazardous Substances
-
Does the constractor have a Material Data Sheet (MSDS) or Safety Data Sheet (SDS) onsite for all products used eg: glues resins, sealants paints etc...<br>
-
Is there a MSDS or SDS left on site for any products that are stored over-night<br>
-
Comments
-
Add Photo
6. Items of Plant & Trenches (High Risk)
-
Does the work require an operator with a licence/certificate of competency (Excavators, skid steer, forklift, crane, boom pumps, spotters, riggers, dogmen). <br>
-
Is there a pre-start checklist & SWMS completed for the item of mobile plant?<br>
-
Warning devices operational (reverse beepers, flashing lights, horn) <br>
-
Does the plant look fit for purpose or use e.g.: Earthmover quick hitches secured/pinned.<br>
-
Open screw pile holes and piers that are left unattended have covers preventing entry and are identified on builders site sign.<br>
-
Large exposed trenches have fencing/barrier in place, Trenches in minimum excess of 1.5m deep have been battered back and/or shored.<br>
-
Soil pile located minimum 1m from edge of trench?<br>
-
Comments
-
Add Photo
7. Electrical Tools & Equipment
-
Site Meter Box RCD tested monthly and main fuse locked & door closed (Must be tested prior to first use or on installation)<br>
-
Enter last Test Date:
-
If a generator is used, it should have an RCD fitted and not used indoors or in confined space?<br><br>
-
Electrical equipment (leads and tools) tested & tagged every 3 months and in date.<br>
-
Are electrical leads exiting through the bottom of the meter box allowing the door to close correctly? <br><br><br>
-
Are electrical leads raised off the ground where practicable and minimum 15amp leads (1.5mm)?<br><br>
-
Are leads to be no longer than 25 meters in length and in good working condition(no exposed wires and not doubled up)?<br>
-
Equipment has required guarding in place (blades in good condition,no missing teeth or chipped/broken cutting disk)<br>
-
Comments
-
Add Photos
PPE - Non Compliance (select "No")
-
Hi-Visibility Vest<br>
-
Hat - Wide Brimmed (Sun Smart)<br>
-
Hard Hat - Required when work is bieng completed above a person or there is a risk of falling objects.<br>
-
Sun Screen<br>
-
Neck to toe clothing - protection from cuts and abrasions and sun smart<br>
-
Safety Boots<br>
-
Eye Protection<br>
-
Hearing Protection<br>
-
Dust Mask
-
Comments
-
Add Photo
Safety Chat
-
Subject of Talk - include points discussed
-
Name of contractor and signature
-
Name of contractor and signature
-
Name of contractor and signature
-
Action Items
-
Add Photo