Information
-
quality post check
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Health & Safety use and setup
-
Is use of an eyebolt in evidence?
-
Add media
-
Eyebolt hole capped/sealed
-
Type of ladder used dish working
-
- Single
- Double
- Triple
- Combi ladder
- Steps
-
Ladder type used for cabling
-
- Single
- Double
- Triple
- Combi ladder
- Steps
-
Other evidence to support safe working practice
-
Photos
Internal quality TV setup
-
STB connection to TV
-
On demand connection
-
Software download
-
Remote control tuned in
Internal cabling quality
-
As per customer requirements
-
Cabling secured
-
Cable routing as per hierarchy procedure
Cable entry hole
-
Has an internal grommet been used
External quality dish
-
Dish location/Line of sight
-
External cable run
External entry hole
-
Has the entry hole been sealed
-
Photos
Engineer customer service
-
Did the engineer show you ID?
-
Did the engineer arrive within your given ETA given?
-
Was the engineer polite and friendly?
-
Was the engineer informative?
-
Did the engineer mention other apps or services available that were of interest?
-
Did the engineer take enough time to demonstrate your system so you understood all aspects?
-
Did the engineer leave your property tidy?
-
Did the engineer leave you his/her contact details?
-
Is there anything you feel the engineer could of done better to enhance your experience?
-
Please could you rate the engineer on the level of service you received today?
-
What could of influenced this score?
Team Manager comments
-
What did the engineer do well
-
Areas for engineer improvements
-
Support and resources required
-
Engineer feedback and commitments to improve future performance
-
Engineer requested support and resource requirements
-
Timescales for review
-
Date of review with engineer
-
Engineer signature
-
TM signature