Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Add location
-
-
Select date
-
Add media
GENERAL
-
B. Hazard Identification carried out and controls in place?
-
C. Daily Pre-Start completed with all staff signed onto including visitors and sub-Contractors?
-
E. Site Inductions
-
F. Permits carried out for significant works - Notifiable works?
WORK AREAS
-
A. General Housekeeping
-
B. Walking - Working Surfaces
-
C. Unprotected Sides or Holes
-
D. Impalement Hazards
-
F.. Water -- Trash Receptacles
-
G. Material Storage/Lay Down
-
H. General public and motorists
HEALTH/FIRST AID
-
A. CPR/First AidTraining
-
B. First Aid Kit (No Expired Items)
-
D. Access to Eye Wash
PERSONAL PROTECTIVE EQUIPMENT
-
A. Hard Hats
-
B. Safety Glasses
-
C. Face Shield / Goggles (If Required)
-
D. Respiratory Protection (If Required)
-
E. Hearing Protection (If required)
-
F. Clothing - long sleeves and trousers
-
G. Gloves
-
H. Laced Steel Toe Caps
TOOLS AND EQUIPMENT
-
A. In Good Condition
-
B. Inspected <br>
EXCAVATIONS
-
A. Permit issued and received? - PTW No. 4 for deeper than 300 mm & PTW No. 5 for greater than 1.5m.
-
A. Trained Personnel (Competent Person)
-
C. Soil Condition
-
D. Water Accumulating
-
F. Barricades
RIGGING AND HOISTING
-
A. Capacity Tags
-
B. Hooks and Latches
-
E. Inspected/Tagged
-
G. Damage
PLANT/EQUIPMENT
-
A. Daily Plant Checklists carried out?
-
B. Operator Qualified and Certified and Competent to Operate (CTO)
-
D. Proper setup and use
-
E. Insulated tools available
TRAFFIC MANAGEMENT
-
A. Approved TMP on site?
-
B. Signs and cones set up correctly according to TMP?
-
D. Regular checks been carried out and signed off on log sheet?
-
C. STMS and TC Staff on site and cetified trained?
HAZCOM
-
B. MSDS on Site
-
D. Proper Storage of Chemicals
-
E. Proper PPE for Handling Chemicals
Comments/Recommendations
-
Enter any corrective actions that will be undertaken
Sign Off
-
Site Supervisor