Information

  • Document No.

  • Site safety inspection

  • Site details / Site Manager

  • Project Manager

  • Conducted on

  • Prepared by

  • Location

Actions from previous visits

ACTIONS FROM PREVIOUS VISITS

  • Are there any actions from previous visits to be considered?

  • Have actions been closed out in a satisfactory and timely manner?

  • Comments:

  • Add media

  • • All actions closed out.
    • Suitable and sufficient evidence.
    • Evidence provided by the proposed date.
    • Root cause identified and addressed

Site set up

SITE SET-UP

  • Is site access & egress suitable and safe for both workers and others affected by the site?

  • Workers:
    • Suitable access and egress routes.
    • Readily identifiable routes.
    Others:
    • Clear separation from works.
    • Adequate visitor signage.

    Reference GE 700: General Safety 01

  • Comments:

  • Add media

  • Is the site secure?

  • • Work site secured immediately on possession.
    • Site entrances minimise traffic hazards on public roads.
    • Heras fencing double clipped.
    • Secure hoarding, entrance gates lockable, • Warning notices displayed.

    Reference GE 700: General Safety 01.
    Reference Safety Portal A12

  • Comments:

  • Add media

  • Are those not directly involved with the project safe? i.e. the public, other occupiers of the site etc.

  • • Safe designated pedestrian routes are available to all work locations.
    • Revised, changes made to routes as work progresses on and around site.
    • General public and others protected from any work activities.
    • Clearly signposted access routes.
    • Regular checks to walkways / pedestrian routes.

    Reference GE 700: General Safety 01

  • Comments:

  • Add media

  • Are suitable and sufficient warning signs and notices in place?

  • • Signs displayed at site entrance and elsewhere (Construction site warning boards) in good condition, clean and legible.
    • Selection of appropriate MANDATORY, WARNING, and PROHIBITION signs in good condition.
    • Displayed in appropriate areas around site.
    • Correct Traffic Management signage suitable / sufficient to Chapter 8 (Red Book)

    Reference GE 700:General Safety 01.

  • Comments:

  • Add media

  • Does the site have a pocket notice board and is it used effectively?

  • • Pocket notice board(s) in place
    • Plastic wallets in good condition.
    • Notice board displayed in suitable locations

  • Comments:

  • Add media

  • Does the site have an information (white) board?

  • White board to correct layout
    Appropriate information added to the board
    Information up to date and relevant

  • Comments

  • Add media

  • Are the following Company Policies displayed? (Health & Safety, Environment, Alcohol and Drugs, Fatigue, other)

  • • The 4 current polices + list of all policies
    • Good clean legible condition.
    • Displayed individually in plastic wallets in pocket notice board.

  • Comments:

  • Add media

  • Do the welfare facilities meet the expected standard and are they adequate for the number of workers that will use them?

  • • Clean and hygienic welfare facilities.
    • Workers can change and dry clothing, make a hot drink, heat and eat meals.
    • Sufficient size for workforce to take shelter in bad weather.
    • Good supply of drinking water.
    • Toilet / canteen maintenance schedule in place.
    • Washing facilities- supply of soap, towels, and cleansers.
    • Facilities at transient short duration sites.

    Reference GE 700: General Health and Welfare 02.
    Reference HSE information sheet no 59
    Reference Safety Portal A11.

  • Comments:

  • Add media

  • Is a fully compliant Health and Safety Law Poster displayed?

  • • Genuine hologram poster
    • Clearly displayed for all operatives to see
    • Names and contact numbers for local safety representative completed
    • Names and contact numbers for other Health and Safety contacts completed

  • Is a current Employers Liability Insurance Certificate displayed?

  • • Employers Liability Insurance current.
    • Legible condition.
    • Clearly displayed for all operatives to see.

Site Management

SITE MANAGEMENT

  • Have sufficient, suitably qualified site managers been provide to ensure the site is managed safely? (e.g. minimum SSSTS / SMSTS)

  • • SSSTS/SMSTS supervisor on site at all times.
    • Competent and experienced.
    • Evidence of competence available on site

  • Comments:

  • Add media

  • Are there subcontractors working on site?

  • Are all subcontractors listed on Constructionline?

  • Subcontractors must be discoverable when searched for on the Constructionline website

  • Comments

  • Is there evidence that ALL workers have received a site induction?

  • • Site Induction content sufficient & appropriate.
    • Briefed and signed by workers
    • Competence Record form fully filled out.
    • Documentation readily available on site.

    Reference GE700: Legal and Management 06.
    Reference Walker intranet company forms:
    C17 Site General Induction.
    C54 Site Induction Record

  • Comments:

  • Add media

  • Does the site hold up to date copies of worker competences?

  • • Copies (front & back) of all workers competence cards readily available on site.
    • Competence cards are relevant to the work carried out by individuals.
    • Copies of competence cards filed with individuals induction record sheet

    Reference GE700: Legal and Management 06

  • Comments:

  • Add media

  • Are all workers wearing suitable P.P.E. for the location/task they are undertaking

  • • Correct P.P.E. being worn for the task being carried out.
    • P.P.E. in clean condition and in good order.
    • Correct size of P.P.E. for workers shape, and build.
    • RPE correct & user face fit tested.
    • Face fit test records available on site.

    Reference GE700: Health and Welfare 06.
    Safety Portal B02

  • Comments:

  • Add media

  • Is there a reasonable stock of spare/replacement/occasionally used P.P.E. available?

  • • Adequate stock of P.P.E.
    • Readily accessible / suitable standard
    • Adequate variety to suit workforce.
    • Replacement stock

    Reference GE700: Health and Welfare 06.
    Safety Portal B02

  • Comments:

  • Add media

  • Do all workers appear fit for duty and competent?

  • • All workers signed into site register.
    • Travel times to work recorded
    • Workers appear fit for work.
    • Workers do not appear fatigued.
    • Are there any young persons (16 - 18) on site? If so is there a site specific risk assessment and are the limitations on working hours being complied with. Have the workforce been briefed on the controls necessary to protect young persons?
    • Are suitable checks in place to protect 18 - 21 year olds?
    • Sufficient Individual and group competences.
    • Copies of competence carried by operative

    Reference GE700: Legal and Management 06

  • Comments:

  • Add media

  • Are the First Aid arrangements appropriate for the type of work and number of workers on site? Are named First Aiders on site? Is there an eye wash facility provided?

  • • Adequate number of first aiders on site.
    • Competent and qualified.
    • Readily identifiable to other workers.
    • First aid box stocked and contents in date.
    • The first aid box should be strategically placed readily accessible and clearly marked.
    • Sterile water / saline in sealed disposable containers, containers in date.
    • Operatives wearing ICE TAG Emergency ID on their hard hats.
    • Closest A+E hospitals routes on display
    • Walk in emergency centres identified.

    Reference GE700: Health and welfare 05.
    Reference Safety Portal: B04 First Aid at Work

  • Comments:

  • Add media

  • Are the fire safety arrangements appropriate for the level of risk? (Is there a Fire Safety Plan?)

  • • Adequate number of fire extinguishers on site and appropriately located
    • Suitable type and size for the major fire risks.
    • Yearly inspection date present on equipment.
    • Fire extinguishers checked monthly and records available on site.
    • Fire Safety Plan in place and briefed to operatives.

    Reference GE700: General Safety 02
    Reference Safety Portal: Section H
    Reference Walker Intranet Company forms:
    C53 Site Attendance register.

  • Comments:

  • Add media

  • Are there adequate arrangements in place to safely manage the storage and use of fuels, L.P.G. and other flammable liquids?

  • • Bunded fuel storage.
    • Correct containers for fuel.
    • Safe storage of flammable materials.
    • Spill kits on site and drip trays used on mobile equipment, small power tools.
    • Correct LPG storage.
    • Safe system of work for using LPG on site.

    Reference GE700: General Safety 02.
    Reference Safety Portal: Section H03 &04


  • Comments:

  • Add media

  • Are the standards of housekeeping delivering a safe site?

  • • Generally tidy, risks of slips, trips and falls minimised.
    • Clean, tidy welfare facilities, cleaning schedule.
    • Welfare waste managed.
    • Location of storage, covered.
    • No evidence of vermin.

    Reference GE700: General Safety 01.

  • Comments:

  • Add media

  • Is a Construction Phase Plan required for the project?

  • Is the Construction Phase Plan to a suitable standard and available on site?

  • • Construction phase plan provided and readily accessible on site.
    • Construction Phase Plan approved and signed.
    • Evidence of content requirements complied with.
    • Evidence of review process

    Reference GE700: Legal & Management 03.

  • Comments:

  • Add media

  • Has a Site Waste Management Plan been prepared?

  • Is the SWMP to a suitable standard and kept up to date?

  • • Site Waste Management plan on site, approved & signed by authorised personnel.
    • Records available on site.
    • All removal of waste logged, recorded in site waste log (Smart Waste, Company Diary etc.)

    Reference GE700: Environment 03.

  • Comments:

  • Add media

  • Are buried or overhead services present?

  • Is there an gCAT4+ Cable Avoidance Tool, Signal Generator and a person trained to use them on site?

  • • Cat and Genny on site.
    • Calibration of equipment in date.
    • Competent user of equipment available

  • Comments:

  • Add media

  • Is work around buried and overhead services managed safely? Is CAT manager software in use?

  • • CAT Manager software ( or CAT scan log sheets) in place and readily accessible. Fully filled out, dates, times and signed by trained operatives.
    • Results of scans marked on service record drawings.
    • Permits to dig in place.
    • Scans undertaken during excavation process.
    • Service owners contacted (HV/MP/HP)
    • Warning notices for overhead cables.

    Reference GE700: High Risk Activities 08.
    Reference Safety Portal Section E 02
    Section C 09

  • Comments:

  • Add media

  • Have any services been damaged?

  • Provide details of type of service and cause of the damage i.e. Buried electricity cable struck by excavator.

  • Record details

  • Is the Site Manager carrying out regular weekly safety inspections?

  • Do the findings of the latest Site Manager safety inspection generally reflect those found today?

  • • Evidence of weekly inspections carried out & forwarded to safety manager.
    • Meaningful, realistic comments included.
    • Findings recorded and actioned on sheet.
    • Does it highlight actions that were identified in the safety audit.

    Reference Safety Portal: Section M01- form HSE 55a Site Safety Check Sheet.

  • Comments:

  • Add media

  • Have there been any accidents / incidents (including near misses & close calls) recorded?

  • Have any accidents / incidents been managed appropriately and closed out satisfactorily in a timely manner?

  • • Accidents / Incidents reported immediately to safety dept.
    • Accident report and form HSE 17 completed.
    • Photo evidence provided
    • Near miss reporting procedure in place and used.
    • Appropriate action taken within a reasonable time frame.
    • Is there a near miss reporting station / Are near misses noted on walkers whiteboard.

    Reference GE700: Legal and management 12 & 13.
    Reference Safety Portal: Section F01 & 02
    Section M01- HSE17 Accident Report form

  • Comments:

Safe systems of work

SAFE SYSTEMS OF WORK

  • Are Method Statements, Risk Assessments ( or Work Package Plans & Task Briefs) used to control tasks safely & effectively

  • • Method Statements- Adequate detail / evidence of briefing.
    • Risk assessments - realistic evaluation of risk.
    • W.P.P. / Task briefs to Network Rail standard.
    • Evidence of task brief delivered daily.
    • Evidence of work in compliance with RAMS .
    • RAMS revised when necessary.

    Reference GE700: Legal and General 05. Reference Safety Portal: M07 & M08

  • Comments:

  • Add media

  • Are Temporary works in place?

  • Have identified temporary works been managed safely and regularly inspected?

  • • Appointment of TWC & TWS by company (DI)
    • TW register in place with completed entries.
    • TW's designs available and checked.
    • TW's required documentation & Inspection sheets completed.


    Reference Walkers Intranet- Company Forms (TW)
    Reference Walkers Temporary Works Procedure 13.1

  • Add media

  • Are Permits to work used where it is appropriate to do so?

  • Are permits for identified activities in place, detailed and signed by authorised management on site?

  • • Fully completed permits to work.
    • Work in accordance with permits.
    • Separate issuer and receiver.
    • Evidence of permit briefed.
    • Permits closed out
    • Permits do not exceed over times /dates.

    Reference GE700: Legal and Management 05.
    Reference Safety Portal: Section E02
    Section C09

  • Comments:

  • Comments

  • Add media

  • Have Coshh assessments been prepared and is there evidence that they have been briefed to workers?

  • • Coshh assessments (not data sheets) for all hazardous substances being used.
    • Record of Coshh briefing.
    • Briefing carried out at appropriate time.
    • Coshh assessment for each individual substances being used, not grouped together on briefing sheet.

    Reference GE700: Health and Welfare 07.
    Reference Safety Portal: Section B03
    Section M01- form HSE29 Coshh Risk Summary.
    -form HSE30 Coshh assessment briefing record.

  • Comments:

  • Add media

  • Is there work being carried out at height?

  • Are tasks carried out at height appropriately managed and undertaken safely?

  • • Fall protection control measures in place.
    • Appropriate to the circumstances.
    • Consideration given to group rather than individual control measures.
    • Permits in place before activities start.
    • Evidence of SSOW briefing .

    Reference GE700: High Risk activities D01
    Reference Safety Portal:Section C Working at Height.

  • Comments:

  • Add media

  • Are there open excavations on site?

  • Is excavation work appropriately managed and undertaken safely? Are weekly inspection records available?

  • • Safe access and egress.
    • Earthworks support.
    • Permits to dig / work at height.
    • Edge protection, plant wheel stops, banksman.
    • Evidence of inspections carried out.

    Reference GE700: High Risk Activities 07
    Reference Safety Portal- Section E02, E05, E06, & M01

  • Comments:

  • Add media

  • Is there a traffic management installation in place on a road with a speed limit of 40mph or above, or where drawings needed to be prepared before installation?

  • Has the company TSCO been consulted and have the traffic management arrangements been approved?

  • Refer to Steve Walker's email of August 7th 2015 re: Traffic Management

  • Comments

Managing tasks, equipment & site records

MANAGING TASKS / EQUIPMENT / SITE RECORDS

  • Are tools, equipment and plant properly managed and safely operated by suitably competent operators?

  • • Visual inspections before each use.
    • Maintenance arrangements.
    • Correct tools, equipment for the operations to take place.
    • Competent trained operators.

    Reference GE700: General Safety 05 & 08
    Reference Safety Portal Section M01
    Report Of Inspection PUWER (Green Book)

  • Comments:

  • Add media

  • Are examination records available for tools, equipment and plant?

  • • Thorough Examination Certification in place.
    • Inspection check sheets from hire company .
    • Blue, inspection books in use.
    • 7 day inspection schedules.

    Reference GE700: General Safety 05 & 08

  • Comments:

  • Add media

  • Are tools, equipment, plant and materials stored safely?

  • • Lockable storage containers for tools and equipment.
    • Neat and tidy storage of tools.
    • Materials on site stored safely (e.g. Spoil safe distance from open excavations)
    • Stored materials do not cause any environmental hazards.
    • Location of storage.

    Reference GE700: General Safety 05/06/08

  • Comments:

  • Add media

  • Is mobile plant in use?

  • Are plant operator authorisation forms in place?

  • • Suitable controls in place to manage the use of mobile plant.
    • Correct choice of mobile plant.
    • Competent to use hydrostatic drive (Dumpers)
    • Plant used on highway notified to transport manager. Road legal plant and operator’s driving licence in place.

    • Plant Authorisation forms fully filled out by site manager and plant operator.
    • Plant operator Hi-Vi vest worn by operator and machine keys attached to lanyards.
    • Operator checks carried out.
    • Safety Zones around plant.

    Reference Safety Portal Section M01- form R25 Site Managers Authorisation to operate plant with plant check sheet.

  • Comments:

  • Add media

  • Are there ladders / stepladders or scaffold / scaffold towers on site?

  • Are scaffolds / ladders / stepladders in a serviceable condition and are regular inspection records available?

  • • Appropriate ladders used at height.
    • Most appropriate for the task.
    • Inspection records for: scaffolds / Permanent / mobile- Checks recorded in inspection books or on scaf-tags.
    • Ladders securely tied.
    • Checks carried out by trained operative.
    • Ladders / stepladders- Checks recorded in inspection sheets, books or on ladders tags on equipment.

    Reference GE700: High Risk Activities 01-04
    Reference Safety Portal Section C09/M01-
    form - HSE 12 Tower Scaffold checklist.
    form - HSE 28 Ladder Inspection form
    form - Report of Inspection scaffold.

  • Comments:

  • Add media

  • Are hoists or other lifting equipment in use?

  • Are operations involving lifting equipment / hoists managed safely?

  • • Method statements / risk assessments in place, briefed to those involved.
    • Lift plans in place approved by qualified Appointed Person.
    • Thorough Examination certification in date and records held on site for all lifting equipment in use.
    • Exclusion zones.
    • Manual handling (Manually operated hoists)

    Reference GE700: General Safety 07.
    Reference Safety Portal: Section D05
    Section M01 Report of Inspection LOLER ( Blue Book)

  • Comments:

  • Add media

  • Are arrangements in place to manage effectively the exposure of workers to risk from noise?

  • • Method statements / risk assessments outlining exposure and controls in place and briefed to workers.
    • Noise reduced at source where possible.
    • Noise monitoring systems used.
    • Group protection, assessment of noise levels.
    • Correct grade of hearing protection.
    • Available stock.
    • Condition of Ear protection.
    • Choice of appropriate controls.

    Reference GE700: Health and Welfare 13
    Reference Safety Portal Section B10

  • Comments:

  • Add media

  • Are arrangements in place to manage effectively the exposure of workers to risks from vibration, including vibration exposure records for all workers?

  • • Operatives HAVS record logs in place on site.
    • Filled out daily, use and non-use logged and signed by the individual.
    • Hav’s posters on display for equipment reference.
    • Use of low vibration tools.
    • Elimination / substitution (Bench saws etc.)

    Reference GE700: Health and Welfare 14.
    Reference Safety Portal Section B13
    Section M01
    form HSE39 Vibration record card.

  • Comments:

  • Add media

  • Are arrangements in place to manage effectively the exposure of workers to manual handling risks?

  • • Manual handling risk assessment in place.
    • Mechanical aids available .
    • Manual Handling training.
    • Manual handling minimised.

    Reference GE700 Health and Welfare 15 Reference Safety Portal B07

  • Comments:

  • Add media

  • Are arrangements in place to manage the exposure of workers to risks from harmful chemicals, dusts and fumes?

  • • Method statements / risk assessments / Coshh assessments in place and briefed to workers.
    • Effective dust controls.
    • RPE and replacement stock available on site.
    • Correct grade of mask used.
    • Face fit tested & test certs available on site.

    Reference GE700: Health and Welfare 10.
    Reference Safety Portal Section B09

  • Comments:

  • Add media

  • Does the work involve working with any electrical installation?

  • Are arrangements in place to manage effectively the risks from electrical equipment and installations?

  • • 110v power used on site.
    • RCD in place where required.
    • Electrical permits to work in place briefed and signed by personnel involved.
    • Lock out electrical protection in use.
    • Electrical pass certs for site cabins.
    • Electrical equipment PAT tested, up to date and clearly marked on equipment or in PAT test record logs.

    Reference GE700: General Safety 03.
    Reference Safety Portal Section E04
    Section M01
    Form HSE 32 Permit to work electrical.
    Form HSE 48 Electrical works pre-start checklist.
    Form HSE49 Electrical works hand back checklist.

  • Comments:

  • Add media

  • Is the site diary properly completed & up to date?

  • • Site diary on site fully filled out daily and up to date.
    • Signed by site manager and signatures from contracts manager reviewing the recorded works over the period of the project.
    • Does it include relevant information.

  • Comments:

  • Add media

  • Is there evidence that toolbox talks, relevant to the work being undertaken, are delivered regularly?

  • • Relevant talks specific to the project.
    • Safety stand downs carried out.
    • Talks covering a variety of health / safety and environmental issues.
    • Regular toolbox talks carried out.
    • Talks fully filled out name of person delivering talk, date, time and signatures from attendees.

    Reference GE700: Legal and Management 07. Reference Safety Portal Section M03
    Toolbox Talks / attendance sheet.

  • Comments:

  • Add media

  • Has the site received any commendations / complaints?

  • Have they been acted upon in an appropriate and timely manner?

  • • Commendations / complaints reported to senior managers.
    • NCR raised where appropriate.
    • NCR closed out within agreed timescales.
    • Supporting evidence supplied.
    • Reference commendations / complaints in progress meetings / reports.

  • Comments:

  • Add media

Factors specific to the environment

FACTORS SPECIFIC TO THE ENVIRONMENT

  • Is a pollution incident control plan required?

  • Is the pollution control plan fit for purpose?

  • • Document approved and signed on site
    • Has it been implemented?
    • Does it identify key pollution risks and appropriate controls?
    • Drip trays on site.
    • Spill-kit training.

    Reference Safety Portal Section G

  • Comments:

  • Add media

  • Has an Environmental Management Plan been created for the project?

  • Does the Environmental Management Plan include an implementation schedule, applicable legislation, aspects and impacts, vulnerable watercourses, flora and fauna, contaminated land, noise, vibration and traffic management, where appropriate?

  • • Comprehensive coverage of key issues
    • Environmental plan approved, signed off available on site & implemented.

    Reference GE700: Environment 10.

  • Comments:

  • Add media

Factors specific to rail sites

FACTORS SPECIFIC TO RAIL SITES

  • If the project includes rail-related work click 'add rail site'

  • rail site
  • Are Work Package Plans (WPP) and Task Briefs to the standard expected by Network Rail?

  • • WPP and task briefs in accordance with Network Rail format.
    • Documentation present on site.
    • Signed, dated and concise.

    Reference GE700: Specialist Activities 02.
    Reference Safety Portal Section E01.

  • Comments:

  • Add media

  • Are W.P.P.'s and Task Briefs being followed?

  • • Are W.P.P’s and task briefs relevant to the job / tasks being carried out?
    • Controls identified in documentation being followed by all personnel involved.

  • Comments:

  • Add media

  • Do Task Briefs clearly identify who the task supervisors are and the persons authorised to operate plant, or how this information will be provided if names are not known at the time the Task Brief is prepared?

  • Supervisors and plant operators detailed in task brief.

  • Comments:

  • Add media

  • Is there evidence that Task Briefs are delivered to the workforce before every shift?

  • • Evidence of being briefed daily.
    • Operatives on site can recall the information provided to them during the brief.
    • Records readily available.

  • Comments:

  • Add media

  • Are the emergency communication arrangements suitable and robust?

  • • Are all emergency communications and arrangements clearly detailed.
    • Telephone (land line & mobile) connections adequate
    • Names, numbers easily accessible.
    • Accident / incident Emergency details in place / displayed.

  • Comments:

  • Add media

  • Is all work being carried out in a High Street environment?

  • Do all workers hold a valid P.T.S. card or Track Visitor Permit?

  • • Sentinel card carried by operative.
    • Sentinel card scanned before every shift.
    • Copied in site record induction.
    • T.V.P documentation correctly filled out and held with operative on site.

  • Comments:

  • Add media

  • Is the C.O.S.S. readily identifiable, adequately briefed and familiar with the site location?

  • Comments:

  • Add media

  • Did the C.O.S.S. receive a S.S.O.W. pack at least 24 hours before the shift started? If not was permission obtained prior to implementation?

  • • S.S.O.W. pack in place and in order 1 shift before works starts or permission obtained for derogation from responsible manager or planner
    • Pack on site before any work commences.
    • C.O.S.S. familiar with location of work.

  • Comments:

  • Add media

  • Have all workers received a C.O.S.S. brief and signed his briefing record sheet?

  • • All workers carrying out work received a full brief from the C.O.S.S.
    • Sentinel cards scanned by C.O.S.S.
    • Record of sentinel numbers and signatures.
    • Briefing sheet records held by C.O.S.S.

  • Comments:

  • Add media

  • Are all required permits in place? e.g. Possession, Overhead or 3rd rail isolation, A.L.O. etc.

  • • Are all identified permits in place?
    • Comprehensive details.
    • AOL assessment.
    • HV competent person on site.
    • Permits authorised and signed by competent person.

  • Comments:

  • Add media

  • Where necessary has a Lookout / Site Warden been appointed and are they positioned satisfactorily?

  • • Sufficient number of Lookouts / Site Wardens appointed.
    • Are they fulfilling their duties properly.
    • Competence cards held on operative.
    • Cards copied / scanned and records available on site.

  • Comments:

  • Add media

Factors specific to mains water supply works

FACTORS SPECIFIC TO MAINS WATER SUPPLY WORKS

  • If the project includes mains water supply work click 'Add mains water supply'

  • Mains water supply
  • Can all workers produce a National Water Hygiene Card?

  • • Utility SHEA (EUSR) card copied
    • Card carried by individual’s onsite.

    Reference Safety Portal Section M06.

  • Comments:

  • Add media

  • Do all workers understand and comply with illness and personal hygiene rules?

  • • Copies of rules available on site.
    • All workers comply and understand the illness and personal hygiene rules.

    Reference Safety Portal Section M06

  • Comments:

  • Add media

  • Are the rules governing P.P.E. complied with?

  • • All personnel wearing correct P.P.E. for the tasks they are carrying out on site.
    • Copy of rules on site.
    • Evidence of personnel compliance demonstrated on site.

    Reference Safety Portal Section M06.

  • Comments:

  • Add media

  • Are the rules governing the use of vehicles complied with?

  • • Copy of rules on site.
    • Site personnel comply with rules in place.

    Reference Safety Portal Section M06.

  • Comments:

  • Add media

  • Are contamination prevention measures being applied?

  • • Guidance available on site.
    • Procedures for contamination prevention applied on site.
    • Procedures being carried out by personnel on site.

    Reference Safety Portal Section M06.

  • Comments:

  • Add media

  • Are the materials used approved for use on the water supply network?

  • • Certificate available on site.
    • Materials used on the water supply network approved for use on site.
    • Identified materials being used for activities being carried out.

    Reference Safety Portal Section M06.

  • Comments:

  • Add media

  • Are materials stored appropriately?

  • • Safe proper storage of materials.

    Reference Safety Portal Section M06.

  • Comments:

  • Add media

  • Are suitable controls applied when Chlorine is used?

  • • Consideration of environmental hazards on site.
    • Trained personnel.
    • Procedures and controls for the use of Chlorine implemented on site.
    • Guidance available on site.


    Reference Safety Portal Section M06.

  • Comments:

  • Add media

  • Are any subcontractors approved for work on the water supply network?

  • • Sub-Contractors on site approved for use.
    • Correct cards to work on the water supply network.
    • Cards held with personnel on site.

  • Comments:

  • Add media

ROUTINE INSPECTION?

  • Is this a routine inspection?

  • Please explain why this inspection is necessary.

ACTIONS FROM PREVIOUS VISITS

SAFETY AWARD NOMINATION

  • Does the Site Manager wish to nominate anybody for the company individual safety award?

  • Safety award nominations
  • Site manager can choose to nominate operative for safety / behavioural / actions he has carried out.

  • Add a name and brief details of why the person should be considered.

  • Is the site a contender for a British Safety Council International Safety Award entry?

  • The site can be put forward as a contender for the British Safety Council International Safety Award.

AUDITORS COMMENTS (optional)

  • Auditor to include examples of best practice and opportunities for improvement, as well as any other comments they may have.

  • Site representative's signature

  • Auditor's signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.