Information
-
Conducted on
-
Job No.
-
Site address
-
Site manager
-
Auditor
1.0 Site control
-
1.1 Hazard board is visible form the road and is up to date
-
1.2 Hoardings / fences and gates are secure and adequate.
-
1.3 Signage is displayed and legible where required. HNZ board visible
-
1.4 Stop sign, visitors induction and nearest medical centre is attached to the front door
-
1.5 HNZ ID is available from all contractors onsite
-
Comments
2.0 Site tidiness and access ways.
-
2.1 The site has clear, safe access to your work areas.
-
2.2 Stairways and access ways are clear.
-
2.3 Loose materials are secured for any wind gusts.
-
2.4 furniture, surfaces and carpet are protected as required
-
Comments
3.0 Personal protective equipment. (PPE)
-
3.1 Hardhats are being worn where required by your employees if required
-
3.2 Check inside of Hardhats for expiry dates (2 yearly) and ensure Hardhats are current.
-
3.3 Steel cap boots are being worn by your employees.
-
3.4 Hi-Visibility clothing is being worn by your employees.
-
3.5 Safety glasses, earmuffs, dust masks, respirators are being worn by your employees where necessary.
4.0 First Aid / Fire Protection
-
4.1 First aid kit is available in the contractors vehicles
-
4.2 Fire extinguishers are available in contractors vehicles
-
Comments
5.0 SSSP Documentation
-
5.1 Sign in register is available and is being used
-
5.2 SSSP checklist has been signed and is specific to the work site
-
5.3 Evacuation/Emergency plan is specific to site, the nearest medical centre is labeled on a map
-
5.4 Induction forms have been completed by all contractors on site and signed where required
-
5.5 hazard register is site specific and current hazards have been updated
-
5.6 Task analysis has been completed before commencing dangerous work I.e under floor work, roof cavity work (restricted space) or working at heights
-
5.7 Main contractor self safety inspection has been completed once every week, corrective actions have been followed up and completed
-
5.8 Internal accident/incident register or report has been completed when required
-
5.9 MSDS are available
-
5.10 Tool box talks are on site and signed by contractors including any new safety alerts issued for HNZ
6.0 Electrical Equipment
-
6.1 Current 3 month tag and damage free leads.
-
6.2 All contractors plant onsite is tagged and current (3 months)
-
6.3 Leads used safely, Knot free, Free from sheathing, etc.
-
6.4 Equipment is in good condition.
-
6.5 No domestic multiboards on site I.e plugboss
-
6.6 All equipment designed to have guards are installed.
-
6.7 Adequate temporary lighting where necessary.
-
6.8 Current decant property has the power isolated and a RCD fitted to the range circuit
-
6.9 Non decant has a localised RCD fitted or contractor has run power tools through his own RCD I.e HPM
-
Comments.
7.0 Scaffolding including mobile scaffolding
-
7.1 Weekly Scaftag/Register current and signed off.
-
7.2 Handrails/Midrails where required
-
7.3 Toeboards adequate where required.
-
7.4 Platforms adequate (minimum 3 planks wide)
-
7.5 Ladders/Stairs adequate.
-
7.6 Baseplates adequate.
-
7.7 Work platforms clear.
-
7.8 Platforms trip free.
-
7.9 Planks tied down.
-
7.10 Headroom clear.
-
7.11 Ties/Bracing adequate.
-
Comments.
8.0 Ladders
-
8.1 Trade ladders (rated to 150kgs)
-
8.2 Good condition.
-
8.3 Extension ladders secured at the top and or bottom.
-
8.4 Stays used on A framed ladders.
-
8.5 Operators working minimum two steps down.
-
8.6 Extension ladder 4:1 against the structure
-
8.7 Extension ladder extends at least 1 meter past the platform level.
-
Comments.
9.0 Fall Hazards
-
9.1 Check floor edges.
-
9.2 Check floor openings
-
9.3 Check stairs.
-
9.4 Check excavations.
-
Comments.
Overview
-
Comments
-
Signature.