Title Page

  • Site Name

  • Flat Number

  • Conducted on

  • Prepared by

  • Location

Post Inspection

  • Have all the remedial works contained within the pre inspection been completed ?

  • What works are still required ?

  • What is required to complete outstanding works ?

  • Is the installation to an LD1 D1 standard ? (Detector in all rooms, cupboards larger that 1m² and areas of high risk excluding bathrooms. Detection also has a tamper proof 10 year lithium battery.)

  • How many existing smoke/heat detectors have been retained ?

  • How many smokes have been installed ?

  • Location

  • By ticking yes you verify that a suitable electrical certificate has been completed and will be issued

  • How many heats have been installed ?

  • Location

  • By ticking yes you verify that a suitable electrical certificate has been completed and will be issued

  • How many smokes have been replaced ?

  • Location

  • By ticking yes you verify that a suitable electrical certificate has been completed and will be issued

  • How many heats have been replaced ?

  • Location

  • By ticking yes you verify that a suitable electrical certificate has been completed and will be issued

  • How many RF modules to ensure interlink between devices have been fitted ?

  • Has a relay base been installed or replaced ?

  • By ticking yes you confirm you have tested all devices activate the Ei414 switch whilst in test mode and also that you have returned the switch to the 'ON' position.

  • By ticking yes you verify and confirm that the relay base connection is in a 'Normally Closed' state and matches with the settings at the Living Hub ?

  • Has a new cable been installed from the relay base and connected to the Living Hub ?

  • Has an Aico Ei450 Test switch been installed or replaced ?

  • By ticking yes you confirm and verify that all devices have been correctly 'House Coded' and that all devices are correctly associated with the individual property

  • Is the Living Hub healthy and functional ?

  • Was this tablet installed new, replaced or retained ?

  • Is there a pullcord in the bathroom and functioning correctly?

  • Have you installed this or is it existing ?

  • Is it wired or wireless ?

  • Has all redundant equipment been removed and made good as per the specification?

  • Was there any obsolete equipment to remove ?

  • Reason for not making good ?

  • How many redundant pull cords have you removed and made good ?

  • Have you had confirmation that the fire detection system and pullcord both activate the hub and contact with Appello has been achieved ?

  • What is required to achieve satisfactory operation ?

  • By ticking yes you verify that you have left the property in a clean and tidy condition and that no materials or debris created as a result of our works has been left behind.

  • Have any works additional to the above questions taken place ?

  • What additional works have been carried out ?

  • Do you have any further comments or recommendations ?

  • Please record and add testing process (up to 3mins)

  • Test call answered after 3 minutes

  • Resident Use Only: Have you checked your property and are you happy that it has been left in a clean condition with no damages ?

  • What is your issue ?

  • Name

  • Signature

Sign Off

  • Engineers Name

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.