Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Training

  • Are hygiene cards available and in date?

Stores Arrangements

  • Are fittings, tools, equipment to be used on restricted ops stored in a separate area of vehicles ?

  • Are waste areas separated from storage areas and adequately marked ?

  • Are fuels, oils and equipment using these stored away from restricted ops equipment ?

  • Is there a separate 'quarantined' area for pipe and fittings that require cleaning and/ or disinfection ?

  • Is reinstatement material adequately separated from pipes and fittings ? (e.g. tarmac)

Cleanliness of Tools & Equipment

  • Is hot water working and available ?

  • Are welfare facilities available? (e.g. on site, local supermarket)

  • Do the welfare facilities contain provision for hand cleaning ?

  • Is there a designated area for cleaning used fittings within the compound ?

On-site Disinfection

  • Note: Although largest diameter pipes (normally >600mmmm) are not routinely supplied with end caps, undertakers should take precautions to prevent contamination. Pipes and fittings that appear contaminated on inspection should be thoroughly cleaned and disinfected prior to use.

  • Are chlorine solution AND tablets appropriately labelled ?

  • When should chlorine solution be made up?

  • What strength is made? ( no. of tablets to volume of water)

Storage of items

  • Are pipes and fittings for use in water supply stored above ground level and protected from contamination by use of end caps

  • Approx % fittings stored hygienically ?

  • Approx % pipe stored hygienically ?

  • Approx % pipe with cap ends ?

Storage and use of bottled water

  • Is bottled water off the ground ? (stored on pallets)

  • Is the stock stored within a secure building that excludes natural daylight ?

  • Is the stock directly exposed to sources of artificial light ?

  • Is the part of the building housing the bottled water artificially heated ?

  • Is the stock positioned away from sources of contact that may damage the pallet or packaging ?

  • Is there any evidence of stock deterioration ? (If yes please provide affected batch number)

Action Plan

  • Present during inspection:

  • P1 - Serious failure (stop work immediately)
    P2 - Significant failure (action required today)
    P3 - Minor failure (action within a week)

  • Observations
  • Tap to enter observation

  • Action owner:

  • Agreed completion date:

  • Actions / recommendations:

Report completed by:

  • Name:

  • Signed:

Report accepted by:

  • Name:

  • Signed:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.