Title Page
-
Site conducted
-
Completed on
-
Completed by
-
Location
A6. Tap & Shower Operation - Weekly Check
-
In each area listed, complete checks from left to right where there is more than one tap or shower present (i.e. start with tap or shower furthest to the left)
Level 1
-
Female Change Tap 1 - Correct Operation
-
Fault Notified
-
Female Change Tap 1 - Remedial Work Actioned
-
Female Change Tap 2 - Correct Operation
-
Fault Notified
-
Female Change Tap 2 - Remedial Work Actioned
-
Female Change Shower 1 - Correct Operation
-
Fault Notified
-
Female Change Shower 1 - Remedial Work Actioned
-
Female Change Shower 2 - Correct Operation
-
Fault Notified
-
Female Change Shower 2 - Remedial Work Actioned
-
Male Change Tap 1 - Correct Operation
-
Fault Notified
-
Male Change Tap 1 - Remedial Work Actioned
-
Male Change Tap 2 - Correct Operation
-
Fault Notified
-
Male Change Tap 2 - Remedial Work Actioned
-
Male Change Shower 1 - Correct Operation
-
Fault Notified
-
Male Change Shower 1 - Remedial Work Actioned
-
Male Change Shower 2 - Correct Operation
-
Fault Notified
-
Male Change Shower 2 - Remedial Work Actioned
-
Accessible Change Tap - Correct Operation
-
Fault Notified
-
Accessible Change Tap - Remedial Work Actioned
-
Accessible Change Shower - Correct Operation
-
Fault Notified
-
Accessible Change Shower - Remedial Work Actioned
-
Corridor Water Fountain - Correct Operation
-
Fault Notified
-
Corridor Water Fountain - Remedial Work Actioned
Ground Floor
-
Kitchen Tap - Correct Operation
-
Fault Notified
-
Kitchen Tap - Remedial Work Actioned
-
Toilet Tap - Correct Operation
-
Fault Notified
-
Toilet Tap - Remedial Work Actioned
Lower Level
-
Female Toilet Tap 1 - Correct Operation
-
Fault Notified
-
Female Toilet Tap 1 - Remedial Work Actioned
-
Female Toilet Tap 2 - Correct Operation
-
Fault Notified
-
Female Toilet Tap 2 - Remedial Work Actioned
-
Female Toilet Tap 3 - Correct Operation
-
Fault Notified
-
Female Toilet Tap 3 - Remedial Work Actioned
-
Female Toilet Tap 4 - Correct Operation
-
Fault Notified
-
Female Toilet Tap 4 - Remedial Work Actioned
-
Male Toilet Tap 1 - Correct Operation
-
Fault Notified
-
Male Toilet Tap 1 - Remedial Work Actioned
-
Male Toilet Tap 2 - Correct Operation
-
Fault Notified
-
Male Toilet Tap 2 - Remedial Work Actioned
-
Male Toilet Tap 3 - Correct Operation
-
Fault Notified
-
Male Toilet Tap 3 - Remedial Work Actioned
-
Male Toilet Tap 4 - Correct Operation
-
Fault Notified
-
Male Toilet Tap 4 - Remedial Work Actioned
-
Cubicle Shower 1 - Correct Operation
-
Fault Notified
-
Cubicle Shower 1 - Remedial Work Actioned
-
Cubicle Shower 2 - Correct Operation
-
Fault Notified
-
Cubicle Shower 2 - Remedial Work Actioned
-
Cubicle Shower 3 - Correct Operation
-
Fault Notified
-
Cubicle Shower 3 - Remedial Work Actioned
-
Pre Swim Shower 1 - Correct Operation
-
Fault Notified
-
Pre Swim Shower 1 - Remedial Work Actioned
-
Pre Swim Shower 2 - Correct Operation
-
Fault Notified
-
Pre Swim Shower 2 - Remedial Work Actioned
-
Pre Swim Shower 3 - Correct Operation
-
Fault Notified
-
Pre Swim Shower 3 - Remedial Work Actioned
-
Pre Swim Shower 4 - Correct Operation
-
Fault Notified
-
Pre Swim Shower 4 - Remedial Work Actioned
-
Accessible Change Tap - Correct Operation
-
Fault Notified
-
Accessible Change Tap - Remedial Work Actioned
-
Accessible Change Shower - Correct Operation
-
Fault Notified
-
Accessible Change Shower - Remedial Work Actioned
-
Poolside Shower - Correct Operation
-
Fault Notified
-
Poolside Shower - Remedial Work Actioned
A9. Little Used Outlets - Weekly Flushing Regime
-
Little used outlets should be flushed sufficiently until the temperature at the outlet stabilises and is comparable to the water supply (either hot or cold). As a guidance, run for 2 to 5 minutes and increase where necessary to ensure all control measures are maintained. Little used outlets to include: Showers, Taps, Emergency Shower, Eye Wash Stations, Hose Reels, Sprinklers, etc.
Pool Store Tap
-
Length of time outlet run (mins)
-
Remedial Works Actioned
Cleaning Store Tap
-
Length of time outlet run (mins)
-
Remedial Works Actioned
Plant Room 1 Tap
-
Length of time outlet run (mins)
-
Remedial Works Actioned
Plant Room 2 Tap
-
Length of time outlet run (mins)
-
Remedial Works Actioned
Plant Room 3 Tap
-
Length of time outlet run (mins)
-
Remedial Works Actioned
Water Fountain - 1st Floor
-
Length of time outlet run (mins)
-
Remedial Works Actioned