Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Each month complete audit and send copy to you and to contract tech manager, save in the Legionella online folder as the month and year for easy view if needed, you need to make sure on the first page you input the date ie day/month/year along with your name and the site. any remedials need putting on the site helpdesk this includes risk assessment remedials and annual external site checks by WCS Group.
Site Duty Holder...Darren Baker..Site Responsible Person..Fin Higgs..Deputy Responsible Person...Barry Wright..
Shower Daily Flushing-See Duty Manager Opening/Daily Building Checks
Calorifer Temperature Inspections-Every Month (Flow greater than 60oC return greater than 50oC)
-
Monthly Calorifer Inspections Completed?
Monthly Hot Tap Temp Inspections (Greater than 50oC) Sentinal Outlets (nearest outlet, furthest outlet and along branches to outlets)
-
Monthly Hot Water Inspections Completed?-Sentinal Outlets (greater than 50cO) (nearest outlet, furthest outlet and along branches to outlets)
Monthly Cold Tap Temp Inspections (Less than 20oC) Sentinal Outlet (nearest outlet, furthest outlet and along branches to outlets)
-
Monthly cold water Inspections Completed?
Week 1 low Use Outlet Flush (3 Min)
-
Is Week 1 Tap Flushing Completed?
-
Outlet 1 Flushed Ladies Drinking Tap
-
Outlet 2 Flushed Ladies Disabled Change Sink
-
Outlet 3 Flushed Mens Drinking Tap
-
Outlet 4 Flushed Cafe/Plant Outside Hose Tap
-
Outlet 5 Flushed Outisde Shower/Tap
-
Outlet 6 Flushed Swimming Club West-side Terrace Tea Room
-
Outlet 7 Flushed Plant-Room Hose Tap By Entrance
-
Outlet 8 Flushed Plant-Room Emergency Shower
-
Outlet 9 Flushed Plant-Room House Point Under Shower
-
Outlet 10 Flushed Plant-Room Back Hose Point
-
Week 1 Sign-Off
Week 2 low Use Outlet Flush (3Min)
-
Is Week 2 Flushing Completed?
-
Outlet 1 Flushed Ladies Drinking Tap
-
Outlet 2 Flushed Ladies Disabled Change Sink
-
Outlet 3 Flushed Mens Drinking Tap
-
Outlet 4 Flushed Cafe/Plant Outside Hose Tap
-
Outlet 5 Flushed Outisde Shower/Tap
-
Outlet 6 Flushed Swimming Club West-side Terrace Tea Room
-
Outlet 7 Flushed Plant-Room Hose Tap By Entrance
-
Outlet 8 Flushed Plant-Room Emergency Shower
-
Outlet 9 Flushed Plant-Room House Point Under Shower
-
Outlet 10 Flushed Plant-Room Back Hose Point
-
Week 2 Sign-Off
Week 3 low Use Outlet Flush (3 Min)
-
Is Week 3 Flushing Completed?
-
Outlet 1 Flushed Ladies Drinking Tap
-
Outlet 2 Flushed Ladies Disabled Change Sink
-
Outlet 3 Flushed Mens Drinking Tap
-
Outlet 4 Flushed Cafe/Plant Outside Hose Tap
-
Outlet 5 Flushed Outisde Shower/Tap
-
Outlet 6 Flushed Swimming Club West-side Terrace Tea Room
-
Outlet 7 Flushed Plant-Room Hose Tap By Entrance
-
Outlet 8 Flushed Plant-Room Emergency Shower
-
Outlet 9 Flushed Plant-Room House Point Under Shower
-
Outlet 10 Flushed Plant-Room Back Hose Point
-
Week 3 Sign-Off
Week 4 low Use Outlet Flush (3 Min)
-
Is Week 4 Flushing Completed?
-
Outlet 1 Flushed Ladies Drinking Tap
-
Outlet 2 Flushed Ladies Disabled Change Sink
-
Outlet 3 Flushed Mens Drinking Tap
-
Outlet 4 Flushed Cafe/Plant Outside Hose Tap
-
Outlet 5 Flushed Outisde Shower/Tap
-
Outlet 6 Flushed Swimming Club West-side Terrace Tea Room
-
Outlet 7 Flushed Plant-Room Hose Tap By Entrance
-
Outlet 8 Flushed Plant-Room Emergency Shower
-
Outlet 9 Flushed Plant-Room House Point Under Shower
-
Outlet 10 Flushed Plant-Room Back Hose Point
-
Week 4 Sign-Off
Week 5 low Use Outlet Flush (3 Min)
-
Is Week 5 Flushing completed?
-
Outlet 1 Flushed Ladies Drinking Tap
-
Outlet 2 Flushed Ladies Disabled Change Sink
-
Outlet 3 Flushed Mens Drinking Tap
-
Outlet 4 Flushed Cafe/Plant Outside Hose Tap
-
Outlet 5 Flushed Outisde Shower/Tap
-
Outlet 6 Flushed Swimming Club West-side Terrace Tea Room
-
Outlet 7 Flushed Plant-Room Hose Tap By Entrance
-
Outlet 8 Flushed Plant-Room Emergency Shower
-
Outlet 9 Flushed Plant-Room House Point Under Shower
-
Outlet 10 Flushed Plant-Room Back Hose Point
-
Week 5 Sign-Off
Quarterly Shower Mixer Inspections-Mar/Jun/Sep/Dec (hot inlet greater than 50oC cold inlet less than 20oC mixed water 41oC)
-
Quarterly Shower Mixer Inspections Completed?
-
Mixer 1 Male Change x 8 Showers Does the water shut off when the cold is isolated (Mixer With Plantroom)
-
Mixer 2 Female Change 4x showers Does the water shut off when the cold is isolated (Mixer Within Plantroom Large One)
-
Mixer 3 Female Change 1x shower Does Shower the water shut off when the cold is isolated (mixer With disabled change behind panel)
-
Mixer 4 Female Change 4 x Does the water shut off when the cold is isolated (Mixer behind panel first toilet cubical)
-
Mixer 5 Pavilion RH Shower Room x 1 Shower Does the water shut off when the cold is isolated (Mixer in access panel in RH shower room)
-
Mixer 6 Pavilion LH Shower Room x 1 Shower Does the water shut off when the cold is isolated (Mixer in access panel in LH shower room)
-
Mixer 7 Pavilion Disabled shower Does the water shut off when the cold is isolated
Quarterly Shower Descale-Mar/Jun/Sep/Dec
-
Shower Head Descale Completed
-
Area 1 Male Change x 8 heads descaled?
-
Area 2 Female Change x 9 heads descaled?
-
Area 3 Female Change Disabled Change heads descaled?
-
Area 4 Pavilion Change 1 (Left) heads descaled?
-
Area 5 Pavilion Change 2 (Right) heads descaled?
-
Area 6 Pavilion Disabled Change heads descaled?
-
Area 7 External Shower head descaled?
Half Yearly Tap Mixer-Apr/Oct (Hot inlet greater than 50oC Cold inlet less than 20oC Mixed water 41oC)
-
Tap mixer inspections completed?
-
Mixer 1 Male Change x 5 basins Does the water shut off when the cold is isolated (behind panel under sink)
-
Mixer 2 Female Change x 5 basins Does the water shut off when the cold is isolated (behind panel under sink)
-
Mixer 3 Female Change Disabled Change basin Does the water shut off when the cold is isolated
-
Mixer 4 Female Change Baby Change Room Basin Does the water shut off when the cold is isolated
-
Mixer 5 Pavilion Toilets x 2 basins Does the water shut off when the cold is isolated (in void above lh shower room)
-
Mixer 6 Pavilion Disabled Change basin Does the water shut off when the cold is isolated (located under sink)
-
Mixer 7 Pavilion Office basin Does the water shut off when the cold is isolated (located in cupboard under sink)
Annual Tap Temp Inspections-Nov (Hot greater than 50oC Cold less than 20oC)
-
Annual tap temp inspections completed?
Annual Mixer Service/Filter Clean/Replacement-Either Attach Here worksheet with photo evidence or take pic on mixer quaterly/half yearly temp checks
-
Annual Mixer Service-Filter Clean/Replacement In Date?
-
Due service 20.4.19
Annual Thermometer Calibration -April-Advance -If yes take a picture of the worksheet or certificate when sent via email
-
Thermometer calibration In Date? Advance
-
calibration due 03/2019
Annual Calorifer Inspection External-Advance April If yes take a picture of the worksheet or Certificate when sent via email.
-
Annual external calorifier inspection In date?-Advance
-
Inspection Due 17th April 19
LPHW-Bi-Annual/Annual-April/October-Advance If yes take a picture of the worksheet or Certificate when sent via email.
-
Are Bi-Annual/Annual LPHW Inspection In date? Advance
-
Inspection due 17th Oct 18
Training
-
Has any additional Legionella awareness training been complete this month either via Mylearning or External training? If yes make log of name and date on note.
-
Monthly Inspections Sign-Off