Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Each month complete audit and send copy to you and to contract tech manager, save in the Legionella online folder as the month and year for easy view if needed, you need to make sure on the first page you input the date ie day/month/year along with your name and the site. any remedials need putting on the site helpdesk this includes risk assessment remedials and annual external site checks by WCS Group.
Site Duty Holder...Steve Warren..Site Responsible Person..Fin Higgs..Deputy Responsible Person...Barry Wright..
Shower Daily Flushing-See Duty Manager Opening/Daily Building Checks
Calorifer Temperature Inspections-Every Month (Flow greater than 60oC return greater than 50oC)
-
Monthly Calorifer Inspections Completed?
Monthly Hot Tap Temp Inspections (Greater than 50oC) Sentinal Outlets (nearest outlet, furthest outlet and along branches to outlets)
-
Monthly Hot Water Inspections Completed?-Sentinal Outlets (greater than 50cO) (nearest outlet, furthest outlet and along branches to outlets)
Monthly Cold Tap Temp Inspections (Less than 20oC) Sentinal Outlet (nearest outlet, furthest outlet and along branches to outlets)
-
Monthly cold water Inspections Completed?
Week 1 low Use Outlet Flush (3 Min)
-
Is Week 1 Tap Flushing Completed?
-
Outlet 1 Flushed Gym Fountain Drinking Tap
-
Outlet 2 Flushed Fire Hose Outside Plant Room Place head in bucket of water to cover head and flush first part into water to avoid spray
-
Outlet 3 Flushed Fire Hose Gym/Change Walkways Place head in bucket of water to cover head and flush first part into water to avoid spray
-
Outlet 4 Flushed Outside Tap gym exit
-
Outlet 5 Flushed Emergency Shower Plantroom
-
Outlet 6 Flushed GM/OPS Office Sinks
-
Outlet 7 Flushed Poolside Topup in small cupboard
-
Week 1 Sign-Off
Week 2 low Use Outlet Flush (3Min)
-
Is Week 2 Flushing Completed?
-
Outlet 1 Flushed Gym Fountain Drinking Tap
-
Outlet 2 Flushed Fire Hose Outside Plant Room Place head in bucket of water to cover head and flush first part into water to avoid spray
-
Outlet 3 Flushed Fire Hose Gym/Change Walkways Place head in bucket of water to cover head and flush first part into water to avoid spray
-
Outlet 4 Flushed Outside Tap gym exit
-
Outlet 5 Flushed Emergency Shower Plantroom
-
Outlet 6 Flushed GM/OPS Office Sinks
-
Outlet 7 Flushed Poolside Topup in small cupboard
-
Week 2 Sign-Off
Week 3 low Use Outlet Flush (3 Min)
-
Is Week 3 Flushing Completed?
-
Outlet 1 Flushed Gym Fountain Drinking Tap
-
Outlet 2 Flushed Fire Hose Outside Plant Room Place head in bucket of water to cover head and flush first part into water to avoid spray
-
Outlet 3 Flushed Fire Hose Gym/Change Walkways Place head in bucket of water to cover head and flush first part into water to avoid spray
-
Outlet 4 Flushed Outside Tap gym exit
-
Outlet 5 Flushed Emergency Shower Plantroom
-
Outlet 6 Flushed GM/OPS Office Sinks
-
Outlet 7 Flushed Poolside Topup in small cupboard
-
Week 3 Sign-Off
Week 4 low Use Outlet Flush (3 Min)
-
Is Week 4 Flushing Completed?
-
Outlet 1 Flushed Gym Fountain Drinking Tap
-
Outlet 2 Flushed Fire Hose Outside Plant Room Place head in bucket of water to cover head and flush first part into water to avoid spray
-
Outlet 3 Flushed Fire Hose Gym/Change Walkways Place head in bucket of water to cover head and flush first part into water to avoid spray
-
Outlet 4 Flushed Outside Tap gym exit
-
Outlet 5 Flushed Emergency Shower Plantroom
-
Outlet 6 Flushed GM/OPS Office Sinks
-
Outlet 7 Flushed Poolside Topup in small cupboard
-
Week 4 Sign-Off
Week 5 low Use Outlet Flush (3 Min)
-
Is Week 5 Flushing completed?
-
Outlet 1 Flushed Gym Fountain Drinking Tap
-
Outlet 2 Flushed Fire Hose Outside Plant Room Place head in bucket of water to cover head and flush first part into water to avoid spray
-
Outlet 3 Flushed Fire Hose Gym/Change Walkways Place head in bucket of water to cover head and flush first part into water to avoid spray
-
Outlet 4 Flushed Outside Tap gym exit
-
Outlet 5 Flushed Emergency Shower Plantroom
-
Outlet 6 Flushed GM/OPS Office Sinks
-
Outlet 7 Flushed Poolside Topup in small cupboard
-
Week 5 Sign-Off
Quarterly Shower Mixer Inspections-Mar/Jun/Sep/Dec (hot inlet greater than 50oC cold inlet less than 20oC mixed water 41oC)
-
Quarterly Shower Mixer Inspections Completed?
-
Mixer 1 Village left showers x 2 Showers Does the water shut off when the cold is isolated (Mixer within cupboard left of shower)
-
Mixer 2 Village Right Showers x 3 Does the water shut off when the cold is isolated (Mixer Within locker next to shower)
-
Mixer 3 Poolside 1 x Shower Does Shower the water shut off when the cold is isolated (Mixer Above Showers)
-
Mixer 4 Female Change 4 x Showers Does the water shut off when the cold is isolated (Mixer Above Ceiling)
-
Mixer 5 Mens Dry Change 2 (right) 3 x Showers Does the water shut off when the cold is isolated (Mixer in Cupboard Wetside Elec Cupboard)
-
Mixer 6 Male Dry Change 2 (right) 2 x Showers Does the water shut off when the cold is isolated (Mixer Behind Toilet Panel)
-
Mixer 7 Male Dry Change 1 (Left) 5 x showers Does the water shut off when the cold is isolated (Mixer Within Cubby Hole In Corridor)
Quarterly Shower Descale-Mar/Jun/Sep/Dec
-
Shower Head Descale Completed
-
Area 1 Village x 5 heads descaled?
-
Area 2 Poolside x 1 heads descaled?
-
Area 3 Female Change x 5 heads descaled?
-
Area 4 Male Change Left x 5 heads descaled?
-
Area 5 male Change Right x 5 heads descaled?
Half Yearly Tap Mixer-Apr/Oct (Hot inlet greater than 50oC Cold inlet less than 20oC Mixed water 41oC)
-
Tap mixer inspections completed?
-
Mixer 1 Village Male and Female Toilet x 2 basins Does the water shut off when the cold is isolated (behind panel behind toilet)
-
Mixer 2 Poolside male Toilet x 2 basins Does the water shut off when the cold is isolated (behind panel under sink)
-
Mixer 3 Poolside Female Toilte x 2 basin Does the water shut off when the cold is isolated (Behind panel under sink)
-
Mixer 4 Reception Disabled Change 1 x Basin Does the water shut off when the cold is isolated (Mixer behind tiled access hatch low level left of toilet)
-
Mixer 5 Dryside Male Change 1 (left) x 2 basins Does the water shut off when the cold is isolated (Mixer behind panel under sink)
-
Mixer 6 Dryside Male Change 2 (Right) x2 basins Does the water shut off when the cold is isolated (Mixer behind panel under sink)
-
Mixer 7 Dryside Female Change x 2 basins Does the water shut off when the cold is isolated (Mixer behind panel under sink)
-
Mixer 8 First Floor Studio Male/Female Toilet x 2 basins Does the water shut off when the cold is isolated (Mixer behind panel behind toilet)
Annual Tap Temp Inspections-Nov (Hot greater than 50oC Cold less than 20oC)
-
Annual tap temp inspections completed?
Annual Mixer Service/Filter Clean/Replacement-Either Attach Here worksheet with photo evidence or take pic on mixer quaterly/half yearly temp checks
-
Annual Mixer Service-Filter Clean/Replacement In Date?
-
In Date 22 May 19
Annual Thermometer Calibration -April-Advance -If yes take a picture of the worksheet or certificate when sent via email
-
Thermometer calibration In Date? Advance
-
In Date To 21st Nov 19
Annual Calorifer Inspection External-Advance April If yes take a picture of the worksheet or Certificate when sent via email.
-
Annual external calorifier inspection In date?-Advance
-
In Date to 30th May 19
Annual tank Inspection Site-July
-
Annual tank Inspection-Site
Annual Tank Inspection External-Advance April If yes take a picture of the worksheet or Certificate when sent via email.
-
Annual external Tank inspection In date?-Advance
-
In Date to 31st May 19
LPHW-Bi-Annual/Annual-April/October-Advance If yes take a picture of the worksheet or Certificate when sent via email.
-
Are Bi-Annual/Annual LPHW Inspection In date? Advance
-
In Date to 19th Nov 19
Training
-
Has any additional Legionella awareness training been complete this month either via Mylearning or External training? If yes make log of name and date on note.
-
Monthly Inspections Sign-Off