Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Site Duty Holder Tracy Mcneela Site Responsible Person Adriano Pitorri Deputy Responsible Person Barry Wright
Shower Daily Flushing-See Duty Manager Opening Building Checks
Calorifer Temperature Inspections-Every Month (Flow greater than 60oC return greater than 50oC)
-
Monthly Calorifer Inspections Completed?
Monthly Hot Tap Temp Inspections (Greater than 50oC) Sentinal Outlets (nearest outlet, furthest outlet and along branches to outlets)
-
Monthly Hot Water Inspections Completed?-Sentinal Outlets (greater than 50cO) (nearest outlet, furthest outlet and along branches to outlets)
Monthly Cold Tap Temp Inspections (Less than 20oC) Sentinal Outlet (nearest outlet, furthest outlet and along branches to outlets)
-
Monthly cold water Inspections Completed?
Week 1 low Use Outlet Flush (3 Min)
-
Is Week 1 Tap Flushing Completed?
-
Outlet 1 Flushed drybugh Kitchen
-
Outlet 2 Flushed cleaning cupboards village and drybugh
-
Outlet 3 Flushed Fire hoses main and teaching pool, head in bucket of water to avoid spray
-
Outlet 4 Flushed car wash taps
-
Outlet 5 Flushed lower plant sink
-
Outlet 6 Flushed Emergency shower
-
Outlet 7 Flushed dryburgh toilets
-
Outlet 8 Flushed staff area, changes and kitchen.
-
Outlet 9 Flushed Treatment room lower
-
Week 1 Sign-Off
Week 2 low Use Outlet Flush (3Min)
-
Is Week 2 Flushing Completed?
-
Outlet 1 Flushed drybugh Kitchen
-
Outlet 2 Flushed cleaning cupboards village and drybugh
-
Outlet 3 Flushed Fire hoses main and teaching pool, head in bucket of water to avoid spray
-
Outlet 4 Flushed car wash taps
-
Outlet 5 Flushed lower plant sink
-
Outlet 6 Flushed Emergency shower
-
Outlet 7 Flushed dryburgh toilets
-
Outlet 8 Flushed staff area, changes and kitchen.
-
Outlet 9 Flushed Treatment room lower
-
Week 2 Sign-Off
Week 3 low Use Outlet Flush (3 Min)
-
Is Week 3 Flushing Completed?
-
Outlet 1 Flushed drybugh Kitchen
-
Outlet 2 Flushed cleaning cupboards village and drybugh
-
Outlet 3 Flushed Fire hoses main and teaching pool, head in bucket of water to avoid spray
-
Outlet 4 Flushed car wash taps
-
Outlet 5 Flushed lower plant sink
-
Outlet 6 Flushed Emergency shower
-
Outlet 7 Flushed dryburgh toilets
-
Outlet 8 Flushed staff area, changes and kitchen.
-
Outlet 9 Flushed Treatment room lower
-
Week 3 Sign-Off
Week 4 low Use Outlet Flush (3 Min)
-
Is Week 4 Flushing Completed?
-
Outlet 1 Flushed drybugh Kitchen
-
Outlet 2 Flushed cleaning cupboards village and drybugh
-
Outlet 3 Flushed Fire hoses main and teaching pool, head in bucket of water to avoid spray
-
Outlet 4 Flushed car wash taps
-
Outlet 5 Flushed lower plant sink
-
Outlet 6 Flushed Emergency shower
-
Outlet 7 Flushed dryburgh toilets
-
Outlet 8 Flushed staff area, changes and kitchen.
-
Outlet 9 Flushed Treatment room lower
-
Week 4 Sign-Off
Week 5 low Use Outlet Flush (3 Min)
-
Is Week 5 Flushing completed?
-
Outlet 1 Flushed drybugh Kitchen
-
Outlet 2 Flushed cleaning cupboards village and drybugh
-
Outlet 3 Flushed Fire hoses main and teaching pool, head in bucket of water to avoid spray
-
Outlet 4 Flushed car wash taps
-
Outlet 5 Flushed lower plant sink
-
Outlet 6 Flushed Emergency shower
-
Outlet 7 Flushed dryburgh toilets
-
Outlet 8 Flushed staff area, changes and kitchen.
-
Outlet 9 Flushed Treatment room lower
-
Week 5 Sign-Off
Quarterly Shower Mixer Inspections-Mar/Jun/Sep/Dec (hot inlet greater than 50oC cold inlet less than 20oC mixed water 41oC)
-
Quarterly Shower Mixer Inspections Completed?
-
Mixer 1 Male wet change Does the water shut off when the cold is isolated (in cubby hole in wall by door) x3 showers
-
Mixer 2 Female wet change Does the water shut off when the cold is isolated (behind toilet panel) x3 showers
-
Mixer 3 Village Change Left Does the water shut off when the cold is isolated (communal showers left as looking at them from poolside) x5 showers
-
Mixer 4 Village Change right Does the water shut off when the cold is isolated (communal showers right as looking at them from poolside female side) x5 shower plus 3 poolside ones that come off this
-
Mixer 5 Disabled Change Drysid Does the water shut off when the cold is isolated (disabled change shower by female in corridor) x1
-
Mixer 6 Disabled Change wetside Does the water shut off when the cold is isolated (disabled change shower by poolside) x1
-
Mixer 7 Male Members 1 left Does the water shut off when the cold is isolated
-
Mixer 8 Male Members 2 middle Does the water shut off when the cold is isolated
-
Mixer 9 Male Members 3 right Does the water shut off when the cold is isolated
-
Mixer 10 Female Members 1 Left Does the water shut off when the cold is isolated
-
Mixer 11 Female Members 2 Middle Does the water shut off when the cold is isolated
-
Mixer 12 Female Members 3 right does the water shut off when cold is isolated?
Quarterly Shower Descale-Mar/Jun/Sep/Dec
-
Shower Head Descale Completed
-
Area 1 Male wetside x 3 heads descaled?
-
Area 2 Female wetside x3 heads descaled?
-
Area 3 Village change left x5 heads descaled?
-
Area 4 Village Change right x 8 heads descaled?
-
Area 5 Disabled change in dry corridor x heads descaled?
-
Area 6 Disabled change poolside x1 heads descaled?
-
Area 7 Male Dryside heads descaled? x3 heads descaled
-
Area 8 Female Dryside heads descaled? x3 heads descaled
Half Yearly Tap Mixer-Apr/Oct (Hot inlet greater than 50oC Cold inlet less than 20oC Mixed water 41oC
-
Tap mixer inspections completed?
-
Mixer 1 male dryburgh Does the water shut off when the cold is isolated x2 Sinks
-
Mixer 2 male drybugh disabled Does the water shut off when the cold is isolated x1 sink
-
Mixer 3 female drybugh Does the water shut off when the cold is isolated x2 Sinks
-
Mixer 4 Female drybugh disabled Does the water shut off when the cold is isolated 1x Sink
-
Mixer 5 Dance studio male Does the water shut off when the cold is isolated x2 sinks
-
Mixer 6 Dance studio female Does the water shut off when the cold is isolated x3 sinks
-
Mixer 7 Creche Does the water shut off when the cold is isolated x2 sinks
-
Mixer 8 Male members Does the water shut off when the cold is isolated x2 sinks
-
Mixer 9 Female Does the water shut off when the cold is isolated x2 sinks
-
Mixer 10 village change left mens Does the water shut off when the cold is isolated x2 sinks
-
Mixer 11 village change right mens Does the water shut off when the cold is isolated x2 sinks
-
Mixer 12 Female village change left Does the water shut off when the cold is isolated x2 sinks
-
Mixer 13 Female village change right does the water shut off when cold is isolated x 2 sinks
Annual Tap Temp Inspections-Nov (taps not inspected under sentinel Inspections) (Hot greater than 50oC Cold less than 20oC)
-
Annual tap temp inspections completed?
Annual Thermometer Calibration-April-WCS will do when on site
-
Is the Annual thermometer calibration In date? wcs
-
In date to 17.9.2020
Annual Calorifer Inspection External-April If yes take a picture of the worksheet or Certificate when sent via email.
-
Is Annual external calorifier inspection In Date?- WCS
-
In Date to 17.9.2020
Annual Tank Inspection External-April If yes take a picture of the worksheet or Certificate when sent via email.
-
Annual external tank inspection In Date?-WCS
-
In date to 17.9.2020
LPHW-Bi-Annual/Annual-April/October
-
Is Bi-Annual/Annual LPHW Inspection In Date? If yes take a picture of the worksheet or Certificate when sent via email.
-
In Date to 2.1.2020
Annual tank Inspection Site-July
-
Annual tank Inspection-Site
Legionella Risk Assessment
-
Is Risk Legionella Risk Assessment in date?
-
in Date to Sep 2021
-
Are All Remedials From the last risk assessment signed off on the signoff sheet with all addtional worksheets saved as evidence?
-
Only tick yes once you have signed them all off with evidence of worksheets
Training
-
Has any additional Legionella awareness training been complete this month either via Mylearning or External training? If yes make log of name and date on note.
-
Monthly Inspections Sign-Off