Title Page
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Each month complete audit and send copy to you and to contract tech manager, save in the Legionella online folder as the month and year for easy view if needed, you need to make sure on the first page you input the date ie day/month/year along with your name and the site. any remedials need putting on the site helpdesk this includes risk assessment remedials and annual external site checks by WCS Group.
Site Duty Holder...Sam Glassett..Site Responsible Person..Adam Makawski..Deputy Responsible Person...Barry Wright..
Shower Daily Flushing-See Duty Manager Opening/Daily Building Checks
PHE Temperature Inspections-Every Month (Flow greater than 60oC return greater than 50oC)
-
Monthly PHE Inspections Completed?
Monthly Hot Tap Temp Inspections (Greater than 50oC) Sentinal Outlets (nearest outlet, furthest outlet and along branches to outlets)
-
Monthly Hot Water Inspections Completed?-Sentinal Outlets (greater than 50cO) (nearest outlet, furthest outlet and along branches to outlets)
Monthly Cold Tap Temp Inspections (Less than 20oC) Sentinal Outlet (nearest outlet, furthest outlet and along branches to outlets)
-
Monthly cold water Inspections Completed?
Monthly Hot Water Heater Temp Inspections (greater than 50oC)
-
Week 1 Hot Water Heater Inspections Completed?
-
Weekly Sign-off name and Date
-
Week 2 Hot Water Heater Inspections Completed?
-
Weekly Sign-off name and Date
-
Week 3 Hot Water Heater Inspections Completed?
-
Weekly Sign-off name and Date
-
Week 4 Hot Water Heater Inspections Completed?
-
Weekly Sign-off and Date
-
Week 5 Hot Water Heater Inspections Completed?
-
Weekly Sign-off name and Date
Week 1 low Use Outlet Flush (3 Min)
-
Is Week 1 Tap Flushing Completed?
-
Outlet 1 Flushed Lower Plant Room Spray taps for bunds
-
Outlet 2 Flushed Lower Plant Room Sink taps
-
Outlet 3 Flushed Lower Plant Room Emergency Shower
-
Outlet 4 Flushed Staff Room Sinks
-
Outlet 5 Flushed First Aid Room Sinks
-
Outlet 6 Flushed Outside Acid/Hypo Store Rinse Hose Points
-
Outlet 7 Flushed Sports Hall Fire Hoses x 3
-
ALL taps/shower outlets including above flushed for 3 min in emergency shutdown of 5-60 days (see low use list, mixer tap/shower list, Annual tap temp) complete as part of the temp checks
-
Week 1 Sign-Off name and date
Week 2 low Use Outlet Flush (3Min)
-
Is Week 2 Flushing Completed?
-
Outlet 1 Flushed Lower Plant Room Spray taps for bunds
-
Outlet 2 Flushed Lower Plant Room Sink taps
-
Outlet 3 Flushed Lower Plant Room Emergency Shower
-
Outlet 4 Flushed Staff Room Sinks
-
Outlet 5 Flushed First Aid Room Sinks
-
Outlet 6 Flushed Outside Acid/Hypo Store Rinse Hose Points
-
Outlet 7 Flushed Sports Hall Fire Hoses x3
-
ALL taps/shower outlets including above flushed for 3 min in emergency shutdown of 5-60 days (see low use list, mixer tap/shower list, Annual tap temp) complete as part of the temp checks
-
Week 2 Sign-Off name and date
Week 3 low Use Outlet Flush (3 Min)
-
Is Week 3 Flushing Completed?
-
Outlet 1 Flushed Lower Plant Room Spray taps for bunds
-
Outlet 2 Flushed Lower Plant Room Sink taps
-
Outlet 3 Flushed Lower Plant Room Emergency Shower
-
Outlet 4 Flushed Staff Room Sinks
-
Outlet 5 Flushed First Aid Room Sinks
-
Outlet 6 Flushed Outside Acid/Hypo Store Rinse Hose Points
-
Outlet 7 Flushed Sports Hall Fire Hoses x3
-
ALL taps/shower outlets including above flushed for 3 min in emergency shutdown of 5-60 days (see low use list, mixer tap/shower list, Annual tap temp) complete as part of the temp checks
-
Week 3 Sign-Off name and date
Week 4 low Use Outlet Flush (3 Min)
-
Is Week 4 Flushing Completed?
-
Outlet 1 Flushed Lower Plant Room Spray taps for bunds
-
Outlet 2 Flushed Lower Plant Room Sink taps
-
Outlet 3 Flushed Lower Plant Room Emergency Shower
-
Outlet 4 Flushed Staff Room Sinks
-
Outlet 5 Flushed First Aid Room Sinks
-
Outlet 6 Flushed Outside Acid/Hypo Store Rinse Hose Points
-
Outlet 7 Flushed Sports Hall Fire Hoses x3
-
ALL taps/shower outlets including above flushed for 3 min in emergency shutdown of 5-60 days (see low use list, mixer tap/shower list, Annual tap temp) complete as part of the temp checks
-
Week 4 Sign-Off name and date
Week 5 low Use Outlet Flush (3 Min)
-
Is Week 5 Flushing completed?
-
Outlet 1 Flushed Lower Plant Room Spray taps for bunds
-
Outlet 2 Flushed Lower Plant Room Sink taps
-
Outlet 3 Flushed Lower Plant Room Emergency Shower
-
Outlet 4 Flushed Staff Room Sinks
-
Outlet 5 Flushed First Aid Room Sinks
-
Outlet 6 Flushed GM/OPS Office Sinks
-
Outlet 7 Flushed Sports Hall Fire Hoses
-
ALL taps/shower outlets including above flushed for 3 min in emergency shutdown of 5-60 days (see low use list, mixer tap/shower list, Annual tap temp) complete as part of the temp checks
-
Week 5 Sign-Off name and date
Quarterly Shower Mixer Inspections-Mar/Jun/Sep/Dec (hot inlet greater than 50oC cold inlet less than 20oC mixed water 41oC)
-
Week 1 Shower Mixer Inspections Completed?
-
Mixer 1 Village showers x 3 open shower left hand side far end, Showers Does the water shut off when the cold is isolated (Mixer within Left Cupboard )
-
Mixer 2 Village Showers x 4 2 open showers and 2 cubicle close to valves , Does the water shut off when the cold is isolated (Mixer located in middle cupboard)
-
Mixer 3 Village Showers x 3 showers cubicle far end Showers, Does Shower the water shut off when the cold is isolated (Mixer Located in Right cupboard)
-
Mixer 4 Teaching Pool Showers x 3 Showers Does the water shut off when the cold is isolated (Mixer Above Cubicals)
-
Mixer Disabled Showers x 1 Shower Does the water shut off when the cold is isolated (Mixer shower fixed)
-
Mixer 6 Male dryside x 5 Showers Does the water shut off when the cold is isolated (Mixer Above Showers)
-
Mixer 7 Female dryside 5 x showers Does the water shut off when the cold is isolated (Mixer Above Showers)
-
Week 2 Shower Mixer Inspections Completed?
-
Mixer 1 Village showers x 3 open shower left hand side far end, Showers Does the water shut off when the cold is isolated (Mixer within Left Cupboard )
-
Mixer 2 Village Showers x 4 2 open showers and 2 cubicle close to valves , Does the water shut off when the cold is isolated (Mixer located in middle cupboard)
-
Mixer 3 Village Showers x 3 showers cubicle far end Showers, Does Shower the water shut off when the cold is isolated (Mixer Located in Right cupboard)
-
Mixer 4 Teaching Pool Showers x 3 Showers Does the water shut off when the cold is isolated (Mixer Above Cubicals)
-
Mixer Disabled Showers x 1 Shower Does the water shut off when the cold is isolated (Mixer shower fixed)
-
Mixer 6 Male dryside x 5 Showers Does the water shut off when the cold is isolated (Mixer Above Showers)
-
Mixer 7 Female dryside 5 x showers Does the water shut off when the cold is isolated (Mixer Above Showers)
-
Week 3 Shower Mixer Inspections Completed?
-
Mixer 1 Village showers x 3 open shower left hand side far end, Showers Does the water shut off when the cold is isolated (Mixer within Left Cupboard )
-
Mixer 2 Village Showers x 4 2 open showers and 2 cubicle close to valves , Does the water shut off when the cold is isolated (Mixer located in middle cupboard)
-
Mixer 3 Village Showers x 3 showers cubicle far end Showers, Does Shower the water shut off when the cold is isolated (Mixer Located in Right cupboard)
-
Mixer 4 Teaching Pool Showers x 3 Showers Does the water shut off when the cold is isolated (Mixer Above Cubicals)
-
Mixer Disabled Showers x 1 Shower Does the water shut off when the cold is isolated (Mixer shower fixed)
-
Mixer 6 Male dryside x 5 Showers Does the water shut off when the cold is isolated (Mixer Above Showers)
-
Mixer 7 Female dryside 5 x showers Does the water shut off when the cold is isolated (Mixer Above Showers)
-
Week 4 Shower Mixer Inspections Completed?
-
Mixer 1 Village showers x 3 open shower left hand side far end, Showers Does the water shut off when the cold is isolated (Mixer within Left Cupboard )
-
Mixer 2 Village Showers x 4 2 open showers and 2 cubicle close to valves , Does the water shut off when the cold is isolated (Mixer located in middle cupboard)
-
Mixer 3 Village Showers x 3 showers cubicle far end Showers, Does Shower the water shut off when the cold is isolated (Mixer Located in Right cupboard)
-
Mixer 4 Teaching Pool Showers x 3 Showers Does the water shut off when the cold is isolated (Mixer Above Cubicals)
-
Mixer Disabled Showers x 1 Shower Does the water shut off when the cold is isolated (Mixer shower fixed)
-
Mixer 6 Male dryside x 5 Showers Does the water shut off when the cold is isolated (Mixer Above Showers)
-
Mixer 7 Female dryside 5 x showers Does the water shut off when the cold is isolated (Mixer Above Showers)
-
Week 5 Shower Mixer Inspections Completed?
-
Mixer 1 Village showers x 3 open shower left hand side far end, Showers Does the water shut off when the cold is isolated (Mixer within Left Cupboard )
-
Mixer 2 Village Showers x 4 2 open showers and 2 cubicle close to valves , Does the water shut off when the cold is isolated (Mixer located in middle cupboard)
-
Mixer 3 Village Showers x 3 showers cubicle far end Showers, Does Shower the water shut off when the cold is isolated (Mixer Located in Right cupboard)
-
Mixer 4 Teaching Pool Showers x 3 Showers Does the water shut off when the cold is isolated (Mixer Above Cubicals)
-
Mixer Disabled Showers x 1 Shower Does the water shut off when the cold is isolated (Mixer shower fixed)
-
Mixer 6 Male dryside x 5 Showers Does the water shut off when the cold is isolated (Mixer Above Showers)
-
Mixer 7 Female dryside 5 x showers Does the water shut off when the cold is isolated (Mixer Above Showers)
Quarterly Shower Descale-Mar/Jun/Sep/Dec
-
Shower Head Descale Completed
-
Area 1 Village x 13 heads descaled?
-
Area 2 Disabled x 2 heads descaled?
-
Area 3 Female Dry Change x 5 heads descaled?
-
Area 4 Male Dry Change x 5 heads descaled?
Half Yearly Tap Mixer-Apr/Oct (Hot inlet greater than 50oC Cold inlet less than 20oC Mixed water 41oC)
-
Tap mixer inspections completed?
-
Mixer 1 Reception DIsabled Toilet x 1 basins Does the water shut off when the cold is isolated (Mixer Under Sink)
-
Mixer 2 Wetside Disabled Change Toilet x 1 basins Does the water shut off when the cold is isolated (Mixer Under Sink)
-
Mixer 3 Wetside Male/Female Toilet x 3 basins (nearest sink x 2 male and 1 sink nearest female)Does the water shut off when the cold is isolated (In cupboard between toilets nearest mixer)
-
Mixer 4 Wetside Male/Female Toilet x 3 basins (far sink male x 1 and 2 x sink female middle/far )Does the water shut off when the cold is isolated (In cupboard between toilets Middle mixer)
-
Mixer 5 Dryside Male Toilet x 2 basins Does the water shut off when the cold is isolated (Mixer behind panel under sink)
-
Mixer 6 Dryside Female Toilet x 2 basins Does the water shut off when the cold is isolated (Mixer behind panel under sink)
-
Mixer 7 First Floor Cafe Male/Female Toilet (nearest staffroom) x 1 basins Does the water shut off when the cold is isolated (Mixer tap)
-
Mixer 8 First Floor Cafe Male/Female Toilet (Nearest Bridge) x 1 Does the water shut off when the cold is isolated (Mixer tap)
-
Mixer 9 Creche Toilets x 2 sinks Does the water shut off when the cold is isolated (Mixer tap)
-
Mixer 10 Creche Kitchen x 1 sink Does the water shut off when the cold is isolated (Mixer Tap)
-
Mixer 11 Male Dryside disabled toilet (Mixer Tap)
-
Mixer 12 Female Dryside disabled toilet (Mixer Tap)
Annual Tap Temp Inspections-Nov (Hot greater than 50oC Cold less than 20oC)
-
Week 1 tap temp inspections completed?
-
Weekly Sign-Off name and date
-
Week 2 tap temp inspections completed?
-
Weekly Sign-Off name and date
-
Week 3 tap temp inspections completed?
-
Weekly Sign-Off name and date
-
Week 4 tap temp inspections completed?
-
Weekly Sign-Off name and date
-
Week 5 tap temp inspections completed?
-
Weekly Sign-Off name and date
Annual Mixer Service/Filter Clean/Replacement-Either Attach Here worksheet with photo evidence or take pic on mixer quaterly/half yearly temp checks
-
Annual Mixer Service-Filter Clean/Replacement In Date?
-
In Date To 31.12.20
Annual Thermometer Calibration -April-WCS -If yes take a picture of the worksheet or certificate when sent via email
-
Thermometer calibration In Date? WCS
-
In Date To 7.6.19
Annual Calorifer Inspection External-WCS April If yes take a picture of the worksheet or Certificate when sent via email.
-
Annual external calorifier inspection In date?-WCS
-
In Date To 24.4.20
Annual tank Inspection Site-July
-
Annual tank Inspection-Site
Annual Tank Inspection External-WCS April If yes take a picture of the worksheet or Certificate when sent via email.
-
Annual external Tank inspection In date?-WCS
-
In Date To 24.4.20
LPHW-Bi-Annual/Annual-April/October-WCS If yes take a picture of the worksheet or Certificate when sent via email.
-
Are Bi-Annual/Annual LPHW Inspection In date? WCS
-
In Date to 2.6.20
Training
-
Has any additional Legionella awareness training been complete this month either via Mylearning or External training? If yes make log of name and date on note. Duty Holder Sam Glassett 24th Jan 2020 Pass 100% Responsible person Adam makowski 9th oct 2017 Pass 83% Deputy Responsible person Barry Wright 4th Oct 2017 Pass 83%
-
Monthly Inspections Sign-Off