Statutory Compliance: Fire Alarm Systems

  • A) Is the panel healthy?

  • B) Is there a record of zones and call points?

  • C) Is it evident that weekly tests follow cyclic zone/call point regime?

  • D) Is there a record of routine servicing?

  • E) Is there evidence of remedial actions to faults?

Statutory Compliance: Assistance Alarms

  • A) Is the alarm panel healthy?

  • B) Are there records of daily functional checks for pool alarms?

  • C) are there records of weekly functional tests for the accessible change Alarms or when building is in operation.

  • D) Are there records of remedial actions to faults?

Statutory Compliance: Fire extinguishers/hose reels/blankets. Refer to SAFE Manual C

  • A) Is there a location schedule of all equipment?

  • B) Are all items labelled with date of last test or when next test due?

  • C) Are all items currently within service expiry date?

Statutory Compliance: Legionella control Refer to SAFE Manual A

  • A) Is L8 risk assessment document available For inspection?

  • B) Have all technical recommendations been addressed or programmed for action?

  • C) Are all recommended control measures programmed or being implemented?

  • D) Are in-house tasks being auctioned & recorded within the site logbook or online folder.

  • E) if legionella testing is recommended as part of the control measures, are records available?

  • F) if periodic chemical testing is recommended as part of the control measures, are records available?

Statutory Compliance: Lightning conductors

  • A) Is there evidence that annual (or 11 monthly) tests are being carried out to the lightning conductor system?

  • B) Is there evidence of remedial action to faults?

Section 1: Introduction

  • A) Is the group technical manual available and all sections to the current?

Section 2: People

  • A) Is page 1 completed & up to date?

  • B) Have all new contract technical managers and technicians since 2010 completed the induction & competency assessment?

Section 3: Audit & Review

  • A) Are copies of previous audits inserted (show as n/a if sure is new to the company)

  • B) are copies of previous actions sheets inserted?

  • C) Is there evidence that the recommended actions have been completed?

Section 4 : Safe systems of work

  • A) I there evidence that permits to work are being issue?

  • B) Are permits being correctly issued by the centre?

  • C) Does the site have a permit to work file and are completed permits and live permits being filed within it?

  • D) Is there an awareness of why permits are issued?

  • E) Has the section 9 of the permits been completed and transferred back to site?

Section 5 and 5A: Swimming Pool Water Quality & Pool Microbiological Monitoring

  • A) Is there evidence that pool water quality checks are being undertaken correctly And by adequately trained staff?

  • B) Is daily test data being correctly recorded and to the recommended frequencies?

  • C) Are corrective actions being recorded?

  • D) Are record sheets being correctly archived/scanned?

  • E) Are record sheets of all qualified pool plant personnel inserted and the list of pool test trained staff up to date (table A & B)

  • F) Are daily/weekly technician and duty manager check sheets in place with test Data recorded?

  • G) Is the pool water quality being maintained within acceptable parameters (contractual/PWTAG)?

  • H) Are records kept of pool water make-up consumptions and periodic dilution rates calculated?

  • I) Are monthly microbiological tests being undertaken and archived?

  • J) Is there evidence of corrective actions to microbiological reports and recorded in the relevant section of the SAFE Manual Managing Pollutions In Pools?

Section 6: Spa Pools Water Quality and Management

  • A) Has the site had a separate Spa Audit and actions completed?

  • B) Are copies of the manufactures recommended O&M guidelines? Does the test sheet have the following information list? Date Pre-printed times showing when to test Free chlorine/bromine level Total chlorine/bromine Level Combined chlorine/bromine level Ph Level Water temperature Air temperature Dosing controller readings for both free chlorine/bromine and ph Signature of person undertaking the test?

  • C) Are daily tests being undertaken to the correct frequency(2hours as per H.S.E guidelines)?

  • D) Is there evidence that the spa water quality is being maintained within the recommended parameters?

  • E) Is there evidence that spa water is dumped and replenished at the recommended frequency? Every 2-3 days?

  • F) Are microbiological tests being undertaken and archived?

  • G) Is there evidence of corrective actions to microbiological reports and recorded in the relevant section of the SAFE Manual & Managing pollutions in pools?

  • H) Are there records of all qualified pool plant personnel inserted and spa pool water testing personnel listed?

  • I) Are filters backwashed daily?

  • J) Are there records of daily and weekly spa cleaning?

  • K) Is the plant in good working order? All faults should be reported?

  • L) Is the correct spa usage signage displayed?

  • M) Has the spa been tested for legionella in the last 3months?

  • N) is there evidence of corrective actions to legionella testing results and recorded in the relevant section of the SAFE manual & Managing pollution in pools?

Section 7: Plantroom & Workshop Management

  • A) Are plant-rooms clean, tidy and equipment wiped down?

  • B) Appropriate signage?

  • C) Are walkways clearly identified and clear of obstructions?

  • D) Are plant-room safety check sheets completed and inserted in section 7?

  • E) have all identified actions to d) been implemented?

  • F) Are chemical plant-rooms secure, exhibit correct fish information and signage to comply with the details in the SAFE COSHH manual?

  • G) Are chemical bunds clean, sound and showing no signs of of leaks?

  • H) Is adequate PPE to comply with MSDS, spillage kits and drench showers in place and operational?

  • I) Is there evidence PPE is being worn?

  • J) Are pool water test kits clean and ready for use?

  • K) Are all hand tools correctly stored, PAT tested where appropriated and well maintained?

  • L) Are technical staff dressed in the correct uniforms?

  • M) Is there a record of electronic test equipment (photometer, TDS meters etc) being calibrated in accordance with manufacturers recommendations?

Section 8: Reactive Maintenance

  • A) Is the Help Desk defined, working and a schedule of emergency contacts available?

  • B) Is the corrective action log in place?

  • C) Is there evidence that the corrective action is being used?

  • D) Is there evidence that a priority system is in place?

  • E) Is there evidence that task analysis is being completed?

Section 9: Planned Preventative Maintenance And Specialist Service Providers

  • A) Is there evidence that the asset register is in place, completed and periodically up dated?

  • B) Is the current year planned and completed and displayed?

  • C) Request a listing of the PPM tasks to be undertaken during the week/month of audit (available/not available)?

  • D) Are asset maintenance tasks clearly defined?

  • E) Are maintenance actions being adequately and correctly recorded?

  • F) Is the PPM programmed up to date?

  • G) Evaluate the general maintained condition of plant (adequate)?

  • H) Is the schedule of specialist service providers completed and filed in the technical manual or appropriate file?

  • I) Is a list of contact numbers and emergency (out of hours) contact numbers available?

  • J) From a sample of two service agreements is the scope of works defined?

  • K) Is there evidence that service reports are being issued, filed and remedial works actioned?

Section 10: Boilers and Heating Appliances

  • A) Are copies of the service sheets available (Gas safe if a gas appliance)

  • B) Is the gas installation being checked and certificated (pipe work)?

  • C) Do service sheets contain details of the combustion analysis and output efficiency? Or is information attached to the boilers?

  • D) Is there evidence of remedial action to faults?

  • E) Are gas line diagrams in place?

  • F) Are propane or butane cylinders correctly stored in an external cage?

  • G) Is oil storage compliant with DEFRA publication & guidance note for the control of pollution (Oil Storage), October 2001?

Section 11: Lifting Equipment

  • A) Is the log of lifting equipment completed?

  • B) Has all trained staff been listed and records/certificates inserted? These maybe kept in the sites staff training file?

  • C) Are all lifting equipment service records Up to date?

  • D) Is there evidence of remedial actions to faults?

  • E) is a valid LOLER inspection report Available?

  • F) Have all LOLER recommendations been actioned?

Section 12: High Level Inspection Guidance

  • A) Have all high level areas been identified within schedule 1?

  • B) Are inspections being carried out in line with company policy?

  • C) Is there evidence of remedial actions to faults?

Section 13: Record Drawings and O&M Manuals

  • A) Are available drawings filed and referenced?

  • B) Are all available manuals and manufacturers literature readily available?

  • C) Are drainage drawings available?

  • D) Is the CDM H&S file available?

Section 14: Insurance Inspections

  • A) Is the insurance inspection responsibility defined?

  • B) Is the insurance inspection asset schedule completed?

  • C) Is there evidence that insurance inspection reports are being received and filed?

  • D) Is there evidence of remedial action to faults?

Section 15: Statutory Compliance Technical Guidance

  • A) is there a genuine awareness of statutory compliance?

  • B) Are all records correctly filed?

  • C) Are test certificates being issued?

Section 16: Electricity Technical Guidance

  • A) Is the portable appliance log available?

  • B) Does a sample check of appliances confirm satisfactory labelling and date of last/next round of testing?

  • C) Are appliances within the recommended test expiry date?

  • D) Are portable appliance visual inspections being carried out and recorded on the portable appliance inspections log?

  • E) Are monthly fixed appliance visual inspections being carried out and recorded in the & fixed appliance inspection log?

  • F) Is a copy of the IEE test/inspection certificate available?

  • G) Are the recommendations from the fixed wiring test being recorded on the fixed wiring action log?

  • H) Are monthly emergency lighting inspections being carried out and recorded in the emergency lighting inspection log?

  • I) Is there a numbered schedule of emergency luminaries?

  • J) Is an annual emergency lighting full duration discharge test being carried out and certificated?

  • K) Are all R.C.D's being tested quarterly and recorded in the RCD inspection log?

  • L) Is the site carrying out and recording the fixed wiring visual inspection?

Section 18: Air Conditioning & Refridgeration

  • A) Has site identified and completed the F-Gas register?

  • B) Have the required units had a maintenance record sheet produced?

  • C) Does site have a record of 6 monthly servicing?

Section 19: Chlorine Gas

  • A) Are all NOP & EOP's in place?

  • B) Has all actions from the Siemens risk assessment been completed?

  • C) Are stores kept locked?

  • D) Are service records in place for all chlorine gas dosing and alarm systems?

  • E) Do the required staff have signed training records for the use of the system and bottle changing?

  • F) Are the same staff trained in the use of self contained breathing apparatus?

  • G) Are service records in date for the self contained breathing apparatus?

  • H) Is the appropriate COSHH safety signage displayed?

Section 19A: Liquid Carbon Dioxide

  • A) Does the site use CO2 and if so are alarm systems in place?

  • B) Is the MSDS displayed?

  • C) Is the alarm instructions displayed?

Section 21: Kitchen Extract Hood

  • A) Is the kitchen extract cleaning in date?

  • B) Is there a record of the extract hood filters being cleaned?

Section 22: Pool Grating

  • A) Is the pool grating inspection completed and documented monthly?

Section 23: Fire Damper Inspections

  • A) Are there clear records of the locations of all fire dampers?

  • B) Have main dampers been identified and inspected in the last 12 months and tested in the last 24 months?

Audit And Remedial Completion Sign-off

Audit And Remedial Completion Sign-off

  • Remedial 1 Completion Sign-Off And Date

  • Remedial 2 Completion Sign-Off And Date

  • Remedial 3 Completion Sign-Off And Date

  • Remedial 4 Completion Sign-Off And Date

  • Remedial 5 Completion Sign-Off And Date

  • Remedial 6 Completion Sign-Off And Date

  • Remedial 7 Completion Sign-Off And Date

  • Remedial 8 Completion Sign-Off And Date

  • Remedial 9 Completion Sign-Off And Date

  • Remedial 10 Completion Sign-Off And Date

  • Remedial 11 Completion Sign-Off And Date

  • Remedial 12 Completion Sign-Off And Date

  • GM Sign-Off

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.