WATERCOURSE CROSSING INSPECTION CHECKLIST

  • Weather conditions:

  • Are works occurring at, and within, a watercourse?

  • Has DEHP been notified where works within a watercourse will extend for more than 10 business days?

  • Has notification been given to DAF (Fisheries) regarding works within the watercourse (bankful width) as required under the applicable Accepted Development code?

  • Are all works at, and within, a watercourse being undertaken in accordance with applicable guidelines and codes?

  • Are there adequate silt, erosion and drainage controls (i.e. booms and silt socks etc) in place within the area during the works to minimise turbidity?

  • Have works been timed to avoid periods of high rainfall and increased stream flow?

  • Is a fauna spotter / catcher present during dewatering activities and is the pump adequately screened to prevent aquatic fauna from being sucked up?

  • Are works occurring with minimal disturbance to the area?

  • Have all exclusions and boundary limits been adhered to, including a reduced ROW of 12m-15m?

  • Have all soil/mulch stockpiles and felled vegetation been moved away from the watercourse?

  • Is regular water quality monitoring occurring during all works at end within a watercourse?

  • Is a spill kit suitable for use on water, on site, and operational?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.