Information
-
Strike Request No:
-
Client / Site: Greenwich Peninsula
-
Conducted on
-
Requested By:
- Glyn Brown
- Darren Madigan
- Simon Thayer
-
Plot:
- 115
- 114
-
Block:
- Block A
- Block B
- Block C
- Block D
- Two Story Town House North
- Two Story Town House South
-
Elevation:
- North
- South
- East
- West
-
Lift:
- 15
- 14
- 13
- 12
- 11
- 10
- 09
- 08
- 07
- 06
- 05
- 04
- 03
- 02
- 01
Request
-
Corner feature brickwork has been constructed as per details.
-
Vents have been installed as per building requirements.
-
Window is clean and has mastic installed to all 4 sides.
-
Brick Cill has been installed as per specification.
-
All balcony arms required have been fitted.
-
Bricks to window head are clean and secure as per requirements.
-
Hansen window cill pressing has been fitted and mastic sealed to brick cill.
-
All weepholes are clear and at 900mm centres minimum.
-
Full elevation of brickwork is clean, tidy and in line with sample panel.
-
All DPC trays are installed at window heads and cills and are cut flush to brick face.
-
All scaffold tie holes are sealed through DPC and infilled and pointed to blend with existing brickwork.
-
Photos:
-
Requested By:
-
Approved By: