Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

Pre Work Inspection ( to be completed prior to beginning work)

  • Plans have been reviewed with Site Superintendent and disposal of materials have been reviewed.

  • Purchase order has been received. <br>

  • Site is clean and free of debris.

  • Power and Water is available and accessible.

  • Dumpsters are on site and are accessible.

  • Site Superintendent:

  • Trade Contractor: Company Name (printed)

Final Inspection: (to be completed before trade contractor leaves job site.)

  • Demo appliances, P-tack, and water heater and place in designated area.

  • Demo all flooring and place in designated are.

  • Demo all Cabinets, Vanities and tops and dispose of at designated area.

  • demo all Plumbing fixtures and commodes and place at designated are.

  • Demo scheduled interior and exterior walls and place in designated area.

  • Demo all hardware and accessories and place in designated are.

  • Demo scheduled concrete slabs and framed floors and excavate slab areas for plumbers and dispose of in designated areas.

  • Job site is clean and free of debris.

  • Unit is swept out free of debris and ready to frame.

Summary

  • Date: Project superintendent:

  • Trade Contractor: Company Name:

  • Project manager

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.