Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pre Work Inspection ( to be completed prior to beginning work)
-
Plans have been reviewed with the superintendent and the lot walked.
-
Purchase order has been received. <br>
-
Yard area is clean and free of debris.
-
Swales and berms are established.
-
All lines, pipes, etc., are buried.
-
Temporary power pole is removed.
-
Drives and walks are undamaged.
-
Site Superintendent:
-
Trade Contractor: Company Name (printed)
Final Inspection: (to be completed before Trade Contractor leaves job site)
-
Form boards are removed and stacked in garage.
-
Drives and walks are undamaged.
-
Swales and berms are finalized.
-
Fall is 6 inches of fall within 10 feet of house.
-
There is a minimum of 8 inches between bottom of siding and final grade in all areas.
-
Water flow and direction are correct.
-
There are no low areas that will permit the pooling of water.
-
Yard has a level and attractive appearance.
-
There is no obvious hills, gullies, washes, low spots. or bulges in yard areas.
-
Sod, if required, is healthy, with no gaps. Sod is stapled and rolled.
-
Yard is seeded. Seed can be seen clearly when straw is moved out of the way.
-
Fertilizer has been applied. Fertilizer can be seen when straw is moved out of the way.
-
Sod and seed have been watered.
-
Planter areas are neatly edged and pine straw applied.
-
Trees and shrubs are firmly planted, healthy looking, and watered.
-
Areas not requiring grass have had pine straw and are in neat appearance.
-
Yard is clean and free of trash and debris.
Summary
-
Date: Project superintendent:
-
Trade Contractor: Company Name:
-
Project manager