Pre Work Inspection
-
Plans have been reviewed with site Superintendent.
-
Has a purchase order been received?<br>
-
Building has been field measured. <br>
-
Is work area clear of debris?<br>
Final Inspection: (to be completed before Subcontractor leaves job site.
-
Stairs are installed in levels that require stairs.
-
All sets of stairs fit correctly.
-
All sets of stairs are the correct type.
-
Heights and runs have been measured and are correct for all sets of stairs.
-
All sets of stairs do not creak, squeak, or move.
-
Bracing has been checked (nailed and glued) and verified for all sets of stairs.
-
No patching has been made to any stairs due to incorrect measurements.
-
Temporary stairs have been moved to garage.
-
All risers are protected on all sets of stairs.
-
All oak has double protection. No oak is visible.
-
If extra stairs are required for the garage they are the correct height and are correctly installed.
Summary
-